CSCS Tower Crane flashcards

CSCS Tower Crane · Build recall with a focused review session.

34 cards. Read the term and the definition here. The deck at the top of this page is optional.

Hammerhead tower crane
A tower crane with a fixed horizontal jib and counter-jib; a trolley travels along the jib to change the working radius.
Luffing jib crane
A tower crane whose jib pivots up and down to change radius, allowing it to work in tight sites without a horizontal jib sweep.
Slewing unit
The turntable assembly between mast top and jib that allows the jib and counter-jib to rotate together through 360 degrees.
Counterweight function
Counterweights on the counter-jib balance the overturning moment created by the jib and its load, keeping the crane stable.
Trolley carriage
The wheeled carriage running along the jib that carries the hoist rope sheave and positions the hook at the required radius.
Climbing crane
A tower crane supported by a climbing frame attached to the building structure; mast sections are added as the building rises.
Foundation reactions
The vertical load, overturning moment, and horizontal shear a crane base imposes on its foundation; the foundation must be designed for these.
Erection sequence
Typical order: base, mast, slewing unit, cab and turntable, counter-jib with counterweights, jib, then rope reeving.
Free-standing height
The maximum mast height a crane can stand without being tied to a structure; set by the manufacturer.
Wall tie/tie-in
A structural connection between the crane mast and the building that stabilises the crane above its free-standing height.
Dismantling order
Dismantling reverses erection: remove jib, then counterweights, then counter-jib, then mast sections using a mobile crane or self-lowering system.
Rated capacity
The maximum load a crane may lift at a given radius and configuration, as stated in the load chart, including all deductions.
Load moment
The product of load and working radius; the load chart primarily limits the overturning moment plus structural capacity.
Working radius
The horizontal distance from the crane's slewing centre to the centre of gravity of the suspended load.
Sling leg tension
Tension in each sling leg equals load divided by (number of legs times the sine of the leg angle to horizontal).
Critical lift
A lift exceeding a defined percentage of rated capacity (often 75%) or involving multiple cranes or personnel; requires a lift plan.
Reeving parts
The number of rope falls between trolley and hook block; more parts increase capacity but reduce hook height and speed.
Hook inspection
Daily check of the hook for cracks, deformation, throat opening, and a safety latch that closes and seats correctly.
Limit switch check
Daily verification that hoist high/low, trolley, and slewing limit switches and the overload limiter function correctly.
Anemometer check
Confirm the wind-speed instrument reads correctly; it is a primary safety device governing when operations must stop.
Brake inspection
Check hoist, slewing, and trolley brakes for holding ability and adjustment, and for oil or grease on braking surfaces.
Inspection log
A written record of daily and periodic checks; safety-related defects must be reported and the crane taken out of service.
Single signaler rule
Only one designated signaler directs the crane at a time; the operator obeys that person unless anyone gives a stop signal.
Stop hand signal
A raised clenched fist is the standard stop signal; anyone may give it and the operator must obey immediately.
Tag line use
A rope attached to the load to control rotation and swing; it keeps personnel from having to touch or guide the load directly.
Suspended load rule
Never leave the controls with a load suspended; lower the load, set the brake, and shut down per procedure.
Wind speed limit
The manufacturer's maximum wind speed for operation; operations stop when it is reached, and out-of-service limits also apply.
Out-of-service position
The manufacturer's specified park position for the jib and slewing brake (often free-slew) when the crane is not in use.
Power line clearance
The minimum approach distance to overhead lines set by local rules; lines are treated as live until confirmed de-energized.
Wind load scaling
Wind force on the jib and load increases with the square of wind speed, so doubling wind speed quadruples the force.
Brake adjustment
Maintaining the correct air gap or clearance so hoist and slewing brakes hold rated load without slipping.
Wire rope lubrication
Applying the manufacturer-specified lubricant at set intervals to reduce wear and corrosion; broken-wire counts govern replacement.
Thorough examination
A statutory inspection of the crane by a competent person at defined intervals, with records kept as legal evidence.
Operator's authority
The operator must refuse unsafe lifts and may stop operations when conditions or defects make the lift unsafe.