I.S. 10101 / ET101 Wiring Rules study materials
I.S. 10101 / ET101 Wiring Rules study resources

I.S. 10101 / ET101 Wiring Rules study plan

I.S. 10101 / ET101 Wiring Rules · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Protection for Safety: Electric Shock, Thermal Effects, Overcurrent and Surge

  • State the conditions for automatic disconnection of supply for TN-S, TN-C-S and TT systems, and calculate maximum permissible earth-fault loop impedance for a given protective device

  • Distinguish between basic protection and fault protection and list the measures used for each

  • Explain the role of RCDs (residual operating current, operating time) in supplementary and additional protection

  • Identify thermal effects requiring protection: overload, short circuit, and the adiabatic check for conductors

Your checkpoint

One-page reference sheet with disconnection times table, a worked Zs calculation for a 32 A Type B MCB, and a worked adiabatic check for a 2.5 mm² cable

Week 2

Protection for Safety: Electric Shock, Thermal Effects, Overcurrent and Surge & Earthing Arrangements, Protective Conductors and Bonding

  • Size a circuit protective conductor using the adiabatic equation and the tabulated k values

  • Compare earthing system types (TN-S, TN-C-S, TT, IT) and state where each is permitted

  • Describe main protective bonding: which services require bonding, conductor sizing, and connection points

  • Explain the purpose of supplementary bonding and when it may be omitted in a location containing a bath or shower

Your checkpoint

Completed CPC sizing and main bonding conductor sizing worksheet for five sample circuits, with justification for each conductor size chosen

Week 3

Selection and Erection of Wiring Systems, Cables and Conductors

  • Select cable current-carrying capacity by applying correction factors for ambient temperature, grouping and thermal insulation

  • Determine the appropriate protective device rating using the Iz ≥ In ≥ Ib design relationship

  • Choose wiring system types suitable for a given environment (buried, exposed to sunlight, in thermal insulation, in a void)

  • State the requirements for conductor identification, minimum cross-sectional areas and support of cables

Your checkpoint

Full cable-sizing calculation for a three-circuit domestic distribution board, showing Ib, In, correction factors, tabulated Iz and final selected cable size per circuit

Week 4

General Characteristics and Assessment of General Characteristics

  • Describe the maximum demand assessment method and how diversity is applied to load calculations

  • List the characteristics to be assessed before an installation is designed (supply characteristics, nature of demand, environmental conditions, continuity of service)

  • Explain how protective device selection and conductor sizing interact with the assessed maximum demand

  • Identify the information that must be recorded about the supply and the installation's intended use

Your checkpoint

Maximum demand and diversity calculation for a mixed domestic/small commercial installation, with a written assessment of the general characteristics and a chosen main protective device rating

Week 5

Switchgear, Controlgear, Isolation and Switching

  • Distinguish between isolation, switching for functional control, emergency switching and emergency stopping

  • State the requirements for a means of isolation for every circuit and for the main switch

  • Explain the locking-off and warning-notice requirements for isolation of equipment

  • Select appropriate switchgear for a given duty, including AC-23 utilisation category considerations for motor circuits

Your checkpoint

Annotated single-line diagram of a distribution board showing main switch, isolators, RCDs, MCBs and the function of each device, with a written justification of the switching arrangement

Week 6

Special Installations and Locations (e.g. bathrooms, construction sites, agricultural)

  • Apply the zone rules and IP requirements for equipment in a room containing a bath or shower

  • State the additional protection and supplementary bonding requirements for bathroom and shower locations

  • List the additional requirements for construction and demolition site installations, including reduced-voltage and RCD protection

  • Describe the requirements for agricultural and horticultural premises, including fire risk and equipotential bonding of livestock areas

Your checkpoint

Zone diagram of a bathroom with equipment locations marked and a compliance checklist for each zone, plus a one-page comparison of construction-site versus agricultural additional requirements

Week 7

Scope, Fundamental Principles and Definitions & Inspection, Testing, Verification and Certification

  • Define key terms from the standard: live part, exposed conductive part, extraneous conductive part, basic insulation, SELV, PELV, FELV

  • Sequence the inspection, testing and certification process from initial verification through to periodic inspection

  • Describe the tests required for initial verification and state the order in which they are carried out

  • Interpret test results against expected values and identify when a result indicates a defect

Your checkpoint

Completed initial verification test schedule for a sample installation with recorded results, expected values and a pass/fail judgement for each test

Week 8

Inspection, Testing, Verification and Certification & Scope, Fundamental Principles and Definitions & Protection for Safety: Electric Shock, Thermal Effects, Overcurrent and Surge

  • Complete a full timed mock examination across all eight domains and score it

  • Identify the three weakest domains from the mock and re-work the underlying rules for each

  • Produce a condensed final revision sheet covering disconnection times, conductor sizing and testing sequence

  • Verify recall of definitions and scope items without reference to notes

Your checkpoint

Scored mock exam with a written error analysis listing each missed question, the correct rule, and the domain it belongs to

Milestones

Week 2: Can calculate Zs, CPC size and bonding conductor size for an unfamiliar circuit without notes, and explain the earthing system type from a supply description

Week 4: Can complete a full cable-sizing calculation end to end and justify the maximum demand figure used

Week 6: Can correctly place equipment in bathroom zones and list the additional requirements for at least two special locations

Week 8: Scores at least 75% on the timed mock exam with no domain below 60%, and has a written error analysis for every missed question