IE F-Gas Category IV study materials
IE F-Gas Category IV study resources

IE F-Gas Category IV flashcards

IE F-Gas Category IV · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

GWP definition
Global Warming Potential is the mass-based factor comparing a gas's 100-year climate impact with CO2, which is set at 1. It converts a refrigerant charge into CO2 equivalent tonnes.
CO2e formula
Charge in kilograms multiplied by the refrigerant GWP, then divided by 1000, gives tonnes of CO2 equivalent. This figure drives leak-check frequency and quota accounting.
Current F-gas Regulation
Regulation (EU) 2024/573 replaced Regulation 517/2014. It governs HFC phase-down, leak checks, certification, labelling and placing HFCs on the EU market.
HFC phase-down basis
The phase-down is measured in CO2 equivalent, not kilograms. Quota steps reduce the tonnage placed on the market over time, hitting high-GWP gases hardest.
Venting prohibition
Deliberate release of fluorinated greenhouse gases into the atmosphere is banned. Recovered gas must be reclaimed, recycled or destroyed by an authorised operator.
Category IV scope
Category IV certification covers leak checking and recovery of refrigerant from stationary equipment. Installation, servicing and design work need higher categories.
F-gas portal registration
Companies placing bulk HFCs on the market must register in the F-gas portal and hold a quota authorisation or a valid exemption before sale.
ASHRAE class A2L
A2L means lower toxicity (A) and mild flammability (2L), with burning velocity below 10 cm/s. R-32, R-1234yf and R-454B belong to this class.
R-410A characteristics
R-410A is an A1 zeotropic blend with GWP 2088 and near-zero glide. It runs at much higher pressure than R-22 and must always be charged as liquid.
Zeotropic blend behaviour
A zeotropic blend has temperature glide and leaks fractionally, with the more volatile component escaping first. A leaked system must be fully recovered and recharged, not topped up.
POE lubricant hygroscopy
Polyol ester oil used with HFCs absorbs moisture rapidly. Systems must be kept sealed and dry, or acid and sludge form and damage the compressor.
Cylinder identification
Colour codes alone are unreliable. Confirm the gas by reading the cylinder label and valve stamp, and by checking the pressure-temperature relationship.
Vapour density hazard
Refrigerant vapour is heavier than air and collects in pits and basements, displacing oxygen. Asphyxia risk can precede any toxic effect at high concentration.
R-134a and R-404A GWP
R-134a has a GWP of 1430 and R-404A about 3922. Both are A1 safety class, so high climate impact does not imply high flammability.
Liquid charging rule
Zeotropic blends must be charged as liquid from the cylinder to preserve the designed composition. Vapour charging would draw off a different mixture.
5 t CO2e threshold
Equipment holding 5 tonnes CO2 equivalent or more must be leak checked periodically. Below that threshold, no periodic check duty applies.
Leak check intervals
Checks run every 12 months for 5 to 50 t CO2e, every 6 months for 50 to 500 t CO2e, and every 3 months at 500 t CO2e and above.
Leak detection system credit
A certified leak detection system halves the checking burden: 12 months for 50 to 500 t CO2e and 6 months at 500 t CO2e and above.
Hermetic equipment exemption
Hermetically sealed equipment containing less than 10 tonnes CO2 equivalent is exempt from periodic leak checks, provided it is labelled as hermetically sealed.
Leak record contents
Records must show gas type and quantity, CO2e tonnage, leak-check dates and results, repairs performed, and the identity of the certified technician.
Five-year retention
Operators must keep F-gas records for at least five years and present them to the competent authority on request during an inspection.
Post-repair follow-up check
After repairing a leak, a follow-up check must be carried out within one month to confirm the repair before normal intervals resume.
Recovery before dismantling
Refrigerant must be recovered before equipment is opened, dismantled or scrapped. Only certified personnel may perform recovery on stationary systems.
Recovery cylinder 80% rule
Recovery cylinders must never exceed 80% liquid fill by volume, leaving room for thermal expansion. Overfilling risks hydraulic rupture and violent release.
Reclaimed versus recycled
Reclaimed refrigerant is reprocessed to virgin specification and verified by analysis. Recycled refrigerant is cleaned for reuse, often on the same site.
Never mix refrigerants
Mixing different refrigerants in one recovery cylinder renders the whole batch waste. It can then only be destroyed, not reclaimed or reused.
Recovery efficiency target
Recovery should capture at least 95% of the charge on larger systems and around 90% on small units, following the equipment manufacturer's procedure.
Push-pull recovery method
For large charges, push-pull transfers liquid rapidly using the pressure difference, then the remaining vapour is pulled by vacuum to finish.
Cold burn first aid
Liquid refrigerant on skin causes cryogenic burns. Flush with lukewarm water for at least 15 minutes, remove contaminated clothing and seek medical help.
Confined space oxygen limit
Never enter a refrigerant space where oxygen could fall below 19.5%. Use forced ventilation, a gas detector and, where needed, breathing apparatus.
A2L ignition control
Work on A2L systems requires removing ignition sources: no open flame or hot work, and only intrinsically safe or ATEX-rated tools where gas could accumulate.
Cylinder storage rules
Store cylinders upright and secured, below 50 degrees Celsius, away from heat and oxidisers, and never in a vehicle cabin in direct sunlight.