Mistake 1

Answering a U-value or heat-loss question with a single-layer calculation, ignoring the surface resistances (Rsi/Rso) and any cavity or ventilated air layer, then quoting the result to more decimal places than the data allow.

Candidates memorise R = d/k and forget that the standard total thermal resistance includes internal and external surface films and that ventilated cavities are treated differently from sealed ones; exam pressure pushes them straight to the simple formula.

What to do instead

Always write the resistance stack explicitly: Rsi, each layer d/λ, any air layer, Rso, then U = 1/Rtotal. State the standard/assumption used for surface resistances and air layers, and round the final U-value to two decimal places. Practise one full worked example per material type (masonry, timber frame, insulated render) until the stack is automatic.

Mistake 2

Describing a construction detail or sequence in prose only, with no sketch, when the question asks how a junction, threshold, or roof/wall interface is built.

Candidates under time pressure treat drawing as optional decoration and write long paragraphs instead; they also lack confidence sketching freehand, so they avoid it.

What to do instead

Adopt a rule: any question containing 'detail', 'junction', 'sequence', or 'interface' gets a labelled section sketch first, then short annotated notes. Practise 10-minute freehand details (eaves, ground floor, window head, party wall) with correct line weights and labels so the drawing carries the marks.

Mistake 3

Confusing planning permission with building control approval, or assuming one application satisfies the other, when answering a question about a proposed development.

Both are 'approvals' in everyday speech, and candidates conflate the land-use/amenity test of planning with the technical compliance test of building regulations.

What to do instead

Learn the two as separate tracks: planning = permissible use, density, amenity, appearance, and environmental impact; building control = technical compliance with structure, fire, thermal, acoustics, and access. In answers, name which regime each requirement belongs to and note where both apply (e.g. fire safety and access).

Mistake 4

Treating a structural question as a materials question - describing concrete or steel properties when the question asks about load path, stability, or the effect of removing a wall.

Candidates recognise a familiar material and write what they know, rather than identifying what the question actually tests (equilibrium, load transfer, bracing, or disproportionate collapse).

What to do instead

Before writing, classify the question: is it asking about strength of a material, or about how forces travel and how the structure remains stable? For stability questions, trace the load path from roof to foundation and name the stabilising elements (shear walls, bracing, diaphragms, ties).

Mistake 5

Listing sustainability measures (solar panels, rainwater harvesting, insulation) without connecting them to the specific building, climate, orientation, or occupancy pattern in the scenario.

Candidates have a memorised list and reproduce it regardless of context; they do not evaluate whether the measure is appropriate, cost-effective, or correctly sized.

What to do instead

For every measure, add one sentence on why it suits this building (orientation, occupancy, heating demand, site constraints) and one on its limitation or trade-off. Structure answers as 'measure - justification for this case - constraint', so marks for evaluation are earned rather than assumed.

Mistake 6

Mixing up units and quantities: quoting U-values in W/m²K but W/mK for conductivity, confusing lux with lumens, or giving ventilation in the wrong volume/time basis.

Symbols look similar and candidates copy from memory without checking dimensions; under time pressure the unit is the last thing written and often wrong.

What to do instead

Keep a one-page unit sheet (U W/m²K, λ W/mK, R m²K/W, illuminance lux, luminous flux lumens, airflow m³/h or l/s) and check every numerical answer by dimensional reasoning. In calculations, carry units through each line so an error is visible before the final number.

Mistake 7

Answering a thermal comfort or condensation question by naming a single cause (e.g. 'poor insulation') instead of identifying the mechanism - surface temperature, dew point, vapour pressure, or interstitial versus surface condensation.

Candidates learn the vocabulary but not the physics, so they list factors rather than explaining how they interact.

What to do instead

Write the mechanism step by step: source of moisture, temperature gradient, point where temperature falls below dew point, and whether that point is on a surface or within the construction. Then state the control measure (ventilation, vapour control layer position, thermal bridging detail) and why it works at that location.

Mistake 8

Ignoring the brief's constraints in the applied design project - proposing a scheme that breaches site boundaries, overlooking distances, or the stated budget - and then defending it on aesthetic grounds.

Candidates focus on the design idea and treat the constraints as background; they run out of time to check the proposal against each requirement.

What to do instead

Before finalising, make a compliance checklist from the brief (site area, setbacks, orientation, budget, room schedule, access) and tick each item against the proposal. Any breach must be either corrected or explicitly justified with a trade-off, never left unmentioned.

Mistake 9

Describing building services (heating, ventilation, drainage) without sizing, controls, or the principle behind the choice, so answers read as a catalogue of components.

Candidates know component names but not how systems are selected, balanced, or controlled; they avoid numbers because they are unsure of the method.

What to do instead

For each system, answer three things: the design principle, a rough sizing basis (e.g. heat loss per m², air changes per hour, pipe fall), and the control strategy. Practise a short calculation for each service so the answer includes a defensible figure rather than only description.

Mistake 10

Using vague property language - 'strong', 'durable', 'good insulator' - instead of naming the property, its value or order of magnitude, and the consequence for the building element.

Candidates are unsure of exact figures and hedge with adjectives, which earns no credit for technical precision.

What to do instead

Build a comparison table for the main materials (density, compressive strength, thermal conductivity, movement with moisture, fire behaviour) and use it to answer: property, typical value, and effect on design (span, thickness, fixing, movement joints). Where a figure is uncertain, give a defensible range and say so.