LC Construction Studies study plan
LC Construction Studies · Give each week a clear focus.
8 weeks · About 6 hours per week
Construction Technology and Building Elements & Drawing, Graphical Communication and Applied Design Project
Redraw a simple two-storey domestic wall/floor junction from memory and label every layer in correct sequence from foundation to roof finish
Build a one-page glossary of 40 construction-technology terms (strip foundation, DPC, wall tie, lintel, sleeper wall, party wall) with a one-line definition each
Set up a scaled drawing sheet template with title block, north point, scale bar and three line weights, and reproduce one existing detail at 1:5
List the six building elements (substructure, external envelope, internal divisions, primary structure, services, finishes) and assign each glossary term to one element
Your checkpoint
A single A3 sheet containing one hand-drafted 1:5 wall/floor detail with every layer labelled plus a 40-term glossary on the reverse
Construction Technology and Building Elements & Building Materials and Their Properties
Compare timber-frame, cavity-wall masonry and structural insulated panel wall build-ups across six criteria: speed, thermal bridging, weathertightness, cost, site skill and fire performance
Produce labelled 1:10 sections through a strip footing, a raft foundation and a suspended timber ground floor
Match ten common materials (concrete, mild steel, softwood, hardwood, fired clay brick, aerated concrete block, glass, gypsum plasterboard, OSB, EPDM) to their primary properties and one typical application each
Explain how moisture movement, thermal expansion and creep differ between timber, steel and concrete, and state one design consequence of each
Your checkpoint
A comparison matrix of three wall systems across six criteria plus three labelled 1:10 foundation/floor sections
Building Materials and Their Properties & Structural Principles and Building Stability
Describe the manufacturing route and resulting property differences for at least four masonry units (clay brick, calcium silicate, aerated block, dense concrete block)
Calculate dead and imposed loads for a simple one-way floor slab using given unit weights and a stated imposed load, and show the load path to the foundations
Sketch and annotate five structural forms (post-and-beam, loadbearing wall, portal frame, truss, cantilever) and state where each resists or transfers load
Identify the four stability mechanisms (shear walls, cross-walls, moment connections, diagonal bracing) in a plan drawing and mark where each is needed
Your checkpoint
A worked load-takedown calculation for one floor and roof, one page long, with a supporting load-path sketch
Structural Principles and Building Stability & Construction Technology and Building Elements
Solve six short structural problems covering bending moment, shear force, deflection limits and slenderness of a masonry wall
Draft a 1:20 roof section showing insulation position, ventilation path, vapour control layer and eaves detail for a cold-deck pitched roof
Explain why disproportionate collapse provisions matter and list three tying or integrity measures used in low-rise construction
Review a set of three of your own drawings and annotate every missing dimension, level or specification note
Your checkpoint
A self-marked 20-question structural-principles test scoring at least 16/20, with corrections written out for every wrong answer
Environmental and Energy Considerations, Services and Sustainability & Building Services and Thermal Performance
Calculate U-values for a cavity wall and a warm roof from given layer thicknesses and conductivities, and state the effect of a 20 mm insulation increase in each case
Explain the difference between airtightness and insulation, and list five common air-leakage paths in a dwelling
Describe the operating principle and one control requirement for ventilation (MVHR or background ventilators), space heating, and domestic hot water
Compare three renewable options (air-source heat pump, solar thermal, PV) on output profile, roof area needed and typical running cost driver
Set out the condensation risk in a wall or roof build-up using the temperature-gradient idea, and state where the vapour control layer belongs
Your checkpoint
A one-page U-value and condensation-risk calculation sheet for two build-ups, with a labelled temperature-gradient sketch for each
Drawing, Graphical Communication and Applied Design Project & Environmental and Energy Considerations, Services and Sustainability
Produce a full planning-application drawing set for a small extension: site/location plan, floor plan, two elevations and one section, all consistently scaled and titled
Write a 300-word design rationale linking your proposal to orientation, daylight, thermal performance and site constraints
Apply the passive design hierarchy (fabric first, then services, then renewables) to your own project and justify three decisions in writing
Check your drawing set against a self-made 15-point compliance checklist covering dimensions, levels, annotations, scale and title block
Your checkpoint
A complete five-sheet applied design project set with a 300-word design rationale, checked against your 15-point checklist
Planning and Site Assessment & Building Services and Thermal Performance & Drawing, Graphical Communication and Applied Design Project
Carry out a desk-based site appraisal of a hypothetical plot: ground conditions, access, drainage, orientation, overlooking and services availability, recorded as a scored table
Explain how site investigation (trial pits, boreholes, percolation tests) informs foundation choice, and match three ground conditions to suitable foundation types
Position and size service runs (soil stack, water main, consumer unit, boiler or heat pump) on your project plan and check for clashes
Annotate your project drawings with a services layout and a site-constraint overlay
Your checkpoint
An updated project plan sheet with services layout and site-constraint overlay, plus a scored site-appraisal table of at least eight criteria
Construction Technology and Building Elements & Structural Principles and Building Stability & Environmental and Energy Considerations, Services and Sustainability & Building Services and Thermal Performance & Drawing, Graphical Communication and Applied Design Project
Complete two full timed mock papers under exam conditions and record the score by domain to expose weak areas
Re-teach your three weakest domain areas using your own notes, then re-attempt the missed questions without looking at the answers
Condense all eight weeks of notes into a single two-page revision sheet of facts, formulae and detail sketches
Rehearse the drawing task once more at exam pace, finishing a labelled detail within the time allowance
Your checkpoint
A domain-by-domain mock score log showing improvement on the second paper, plus a two-page condensed revision sheet
Milestones
Week 2: Can label a wall/floor junction and three foundation types from memory with no reference material, scoring at least 80% on your own recall check
Week 4: Can complete a load takedown and a U-value calculation unaided and score at least 16/20 on the structural self-test
Week 6: A complete, internally consistent drawing set exists with a written rationale; a peer or tutor can follow the proposal without verbal explanation
Week 8: Second mock paper scores at least 10 percentage points above the first, with no domain below 50%