LC Construction Studies: Services and Sustainability

LC Construction Studies · Work through your exam, one topic at a time.

All guide sections

Services and Sustainability

Services and Sustainability tests water, drainage, wastewater and low-energy servicing, with an emphasis on whole-system thinking. Expect supply, storage, harvesting, treatment, drainage and renewable heat.

Core rules

  • Water supply needs pressure, storage and backflow protection; potable and non-potable supplies must be kept separate.
  • Rainwater harvesting needs a collection area, first-flush diversion, filter, tank and overflow.
  • Wastewater may go to a sewer or an on-site system; a percolation test checks whether the ground can accept treated effluent.
  • Sustainable drainage slows runoff using soakaways, permeable paving and attenuation.
  • Heat pumps produce low-temperature heat and work best with high insulation and large emitters.

Worked example

A roof collects from 100 m²; annual rainfall is 1,000 mm; runoff coefficient is 0.8. Rainfall depth = 1.0 m. Collectable volume = 100 × 1.0 × 0.8 = 80 m³/yr = 80,000 litres/yr. The reasoning is: area × depth × coefficient, with units kept consistent. This is a supply estimate; tank size depends on demand pattern and dry spells, not annual total alone.

Traps

  • Sizing a tank from annual rainfall only.
  • Omitting first-flush diversion or overflow.
  • Assuming harvested rainwater is automatically potable.
  • Ignoring soil percolation for an on-site wastewater system.

Name the source, treatment and disposal route.