RGII Domestic Gas Safety study materials
RGII Domestic Gas Safety study resources

A 1.5 mbar fall on a tightness test with a long-standing smell at the hob

RGII Domestic Gas Safety · Put your knowledge to work in context.

All case studies

A 1.5 mbar fall on a tightness test with a long-standing smell at the hob

You have replaced a corroded 15 mm copper tee and about 1.2 m of pipework in a kitchen, on the outlet side of the meter. The installation supplies a 24 kW open-flued boiler in the utility room, a four-burner hob on a rigid connection and a cooker bayonet. After reassembly you carry out a tightness test at the meter outlet test point using a calibrated gauge, following the domestic procedure in IS 813 and IGEM/UP/1B. After the stabilisation period the gauge falls 1.5 mbar, then holds steady at that reading for the remainder of the test period. A let-by test on the emergency control valve shows no rise on the gauge. The customer mentions that "there's a bit of a smell of gas near the hob sometimes, but it's been like that for ages". The kitchen was only finished last month and the pipework you replaced is now behind a sealed service void with an access panel at one end.

1. How do you interpret the 1.5 mbar fall and the stable reading afterwards?

Read the worked answer

Neither reading is a pass on its own, and the stable tail does not convert a fail into a pass.

  • The pass/fail criterion is volume-dependent. The permissible pressure drop is set by the test method for the installation volume, test pressure and duration you are using. You must measure/calculate the installation volume and compare 1.5 mbar against the allowance for that volume - you cannot judge the figure from memory or by comparison with another job. If 1.5 mbar exceeds the allowance, it is a fail, full stop.
  • The stable tail is diagnostic, not reassuring. Typical innocent causes of a fall that then settles are: insufficient stabilisation (pipework and any liquid in the gauge still equalising after handling), regulator creep from the meter governor, and temperature change. Genuine leaks normally continue to fall, so a settled reading points towards those effects - but it does not exclude a leak that has become temporarily sealed by dirt or by a tap settling.
  • The reported smell changes the burden of proof. A long-standing smell near the hob means you must treat the installation as leaking until proven otherwise, regardless of arithmetic. Do not purge or relight yet.
  • Also verify the gauge - a liquid gauge misread by a meniscus, or a gauge with a leaking connection, produces false results. Record every reading, the volume used and the ambient conditions.

2. The let-by test is satisfactory. Set out the sequence you use to localise the problem, and state how your actions would differ if the let-by test had shown a rise.

Read the worked answer

Satisfactory let-by tells you the ECV is seating: gas is not passing the closed valve, so the drop is downstream of it.

Localisation sequence

  1. Isolate all appliances at their own inlet: turn off the boiler service valve, turn off the hob taps and disconnect/cap the cooker bayonet at its plug. This removes appliance internals, tap grease and bayonet seals from the test.
  2. Re-test the pipework only. If it now holds, the fault lies in an appliance or its connection - test each appliance connection individually and examine the hob taps, which commonly leak at the tap spindle and are a credible source of a smell that "has been there for ages".
  3. If the pipework still falls, sectionalise using existing isolation points, working back from the meter, re-testing each section. Pay particular attention to the new tee and the sealed service void, which must be opened for examination at the access panel - a joint you cannot see is a joint you cannot clear.
  4. Never use a flame to search. Use leak-detection fluid on joints and a suitable gas detector, and ventilate as you work.

If let-by had shown a rise the ECV is passing and cannot isolate the installation. You must not rely on it: stop, ventilate, inform the occupant, and refer the ECV/meter installation to the gas network operator for attention; only then can a meaningful downstream test be completed.

3. The leak turns out to be a hob tap seal. Describe the work and checks needed before you hand the installation back, and what you record.

Read the worked answer

The repair is only half the job; proving the installation is sound and documented is the rest.

  • Repair properly - replace the offending tap seal/valve with the manufacturer's part (or isolate and cap the appliance if parts are unavailable and the customer agrees to a documented isolation). Do not "nip up" a tap that is worn.
  • Re-test - reassemble, then repeat the tightness test on the whole installation at the meter outlet test point, allowing full stabilisation and comparing against the permissible drop for the measured installation volume. A satisfactory let-by check should be repeated too, since the ECV was operated.
  • Purge correctly - after any work that admits air, purge the affected section to a safe point, never into a room, cupboard or void, and confirm with a gas detector that air has been displaced before attempting ignition.
  • Recommission - relight, check gas rate against the data badge (for a 24 kW appliance roughly 2.2 m³/h of natural gas), working pressure, flame picture, and combustion CO/CO₂ ratio; confirm the hob burners light and hold on all settings and that the cooker bayonet is correctly engaged and leak-free.
  • Records - the original failing readings, the let-by result, the fault found, parts fitted, all test readings, purge details and the final combustion readings on the job sheet; explain the cause of the long-standing smell to the customer and advise them to report smells to the network emergency line in future rather than living with them.