RGII Domestic Gas Safety · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Domestic Gas Appliances: Installation, Commissioning and Servicing & Gas Properties, Combustion and Ventilation

  • Map the commissioning sequence for a domestic gas boiler and a gas hob from memory, listing each check in order and the reason it sits there

  • Explain the relationship between gas family (natural gas vs LPG), Wobbe number, and injector sizing, and state why an appliance must not be converted without the manufacturer's kit

  • Calculate stoichiometric air requirement and CO2/CO ratios for methane and propane combustion, and identify the symptoms of incomplete combustion from flue gas readings

  • Describe the three elements of the fire triangle as applied to gas explosions and the concept of flammability limits for methane in air

  • List the ventilation requirements for a domestic appliance installed in a compartment, distinguishing purpose-provided ventilation from adventitious ventilation

Your checkpoint

A one-page commissioning checklist for two appliances plus a worked combustion calculation sheet with air-requirement and CO2 figures for methane and propane

Week 2

Domestic Gas Appliances: Installation, Commissioning and Servicing & Gas Properties, Combustion and Ventilation

  • Write out the pre-installation survey checks for an appliance replacement, covering gas supply adequacy, flue route, and combustion air

  • Explain gas rate measurement by meter reading and by regulator pressure drop, and calculate expected gas rate from appliance heat input

  • Describe the procedure for checking and setting burner pressures on a range-rated appliance and state the tolerance applied

  • Identify the safety devices found on domestic appliances (flame supervision, overheat, spillage, oxygen depletion) and state what each protects against

  • Explain why a spillage test is performed and describe the conditions under which an appliance fails it

Your checkpoint

A completed appliance survey and commissioning record for a fictional installation, including gas rate calculation, burner pressure check, and spillage test outcome

Week 3

Pipework, Fittings, Jointing and Pressure Testing & Safety Checks, Tightness Testing and Purging

  • Specify pipe sizing for a domestic installation using the pressure drop method, selecting diameter from length, load, and allowable drop

  • Describe the accepted jointing methods for domestic gas pipework and state which are prohibited and why

  • Write the tightness testing procedure for a new installation and for an existing installation, including test pressures and stabilisation periods

  • Explain purging of a gas installation, including volume calculation and the point at which the installation is considered purged

  • Identify the documentation and labelling required after pressure testing and purging

Your checkpoint

A pipe sizing calculation and a written tightness test and purge procedure for a two-appliance domestic installation, with test pressure, duration, and allowable drop stated

Week 4

Legislation, Regulations and Standards (Gas Safety Framework) & Unsafe Situations, Warning Notices and Emergency Procedures

  • Summarise the duties placed on a gas operative by the Gas Safety (Installation and Use) Regulations, including the obligation not to leave an unsafe appliance connected

  • Classify unsafe situations using the recognised categories and match each category to the correct warning notice and action

  • Describe the procedure for dealing with an immediately dangerous situation, including isolation, warning, and notification

  • Explain the role of the emergency control valve and the circumstances in which an operative may isolate the whole supply

  • State the record-keeping and notification requirements that follow the issue of a warning notice

Your checkpoint

A decision table mapping six worked unsafe-situation scenarios to category, warning notice type, isolation action, and notification step

Week 5

Meters, Emergency Control Valves and Supply Connections & Flues, Chimneys and Combustion Product Discharge

  • Describe the installation requirements for domestic gas meters, including position, protection, ventilation, and emergency control valve location

  • Explain the checks required when a meter is exchanged or a new supply connection is commissioned, including regulator and installation soundness

  • Identify the flue types used on domestic appliances (room-sealed, open-flued, balanced, fan-draught) and state the terminal position rules for each

  • Explain the flue flow and spillage checks for open-flued appliances and the conditions that cause flueing failure

  • Describe the inspection of a chimney or flue for integrity, correct sizing, and adequate termination

Your checkpoint

An annotated flue terminal position diagram with dimensions and a meter installation checklist covering position, ventilation, and ECV arrangement

Week 6

Flues, Chimneys and Combustion Product Discharge & Safety Checks, Tightness Testing and Purging

  • Perform a full safety check sequence on an existing installation, covering visual inspection, tightness test, and appliance safety checks

  • Explain the difference between a tightness test and a let-by test and describe when each is required

  • Describe the checks applied to a flue during a safety check and the criteria for classifying a flue defect as unsafe

  • Explain the procedure for re-establishing gas supply after isolation, including purging and relighting

  • Identify the records and labels that must be left after a safety check on a rented property

Your checkpoint

A completed safety check record for a fictional property with three deliberately introduced defects, each classified and justified

Week 7

Gas Properties, Combustion and Ventilation & Unsafe Situations, Warning Notices and Emergency Procedures & Legislation, Regulations and Standards (Gas Safety Framework)

  • Explain the causes of incomplete combustion in domestic appliances and the corrective actions for each cause

  • Describe ventilation requirements for appliances in internal spaces and calculate the required free area for a given appliance input

  • Work through five unsafe-situation scenarios and justify the category assigned using regulation and risk of harm

  • Explain the requirements for warning notices, including what must be recorded and who must be informed

  • Summarise the operative's duty to report and the consequences of failing to classify an unsafe situation correctly

Your checkpoint

A written response to five mixed unsafe-situation and combustion scenarios, each with classification, action, and the regulation or principle relied on

Week 8

Legislation, Regulations and Standards (Gas Safety Framework) & Pipework, Fittings, Jointing and Pressure Testing & Meters, Emergency Control Valves and Supply Connections & Domestic Gas Appliances: Installation, Commissioning and Servicing & Flues, Chimneys and Combustion Product Discharge & Safety Checks, Tightness Testing and Purging & Unsafe Situations, Warning Notices and Emergency Procedures

  • Complete a full timed mock examination across all eight domains and record the score by domain

  • Re-derive the pipe sizing, gas rate, purge volume, and ventilation free-area calculations without notes

  • Recite the unsafe-situation classification and warning notice procedure from memory

  • Review every domain scoring below 70 percent and list the specific facts to relearn

  • Build a one-page pre-exam reference sheet limited to figures, tolerances, and classification rules

Your checkpoint

A timed mock exam result with per-domain scores and a one-page reference sheet of key figures and classification rules

Milestones

Week 2: Explain from memory the commissioning sequence for a boiler and a hob and calculate expected gas rate for a stated heat input without notes

Week 4: Correctly classify four out of five unsafe-situation scenarios and name the matching warning notice and isolation action for each

Week 6: Complete a tightness test procedure and a flue terminal position check with all test pressures, durations, and dimensions correct

Week 8: Score at least 80 percent overall on the timed mock exam with no domain below 70 percent