IMSA Traffic Signal II study materials
IMSA Traffic Signal II study resources

IMSA Traffic Signal II cheat sheet

IMSA Traffic Signal II · Keep the key ideas within reach.

Quick reference

Signal Design and Plan Reading

  • MUTCD Chapter 4C contains nine signal warrants; a signal is justified only when at least one warrant is satisfied by an engineering study (Warrant 1 = Eight-Hour, 2 = Four-Hour, 3 = Peak Hour).

  • A primary signal face is required for each through lane, mounted over or as close as practicable to that lane; supplemental faces may be added over the same lane.

  • The bottom of a signal housing over a roadway must be at least 15 ft above the pavement; post- or pedestal-mounted faces are set at the clearance shown on the standard plan.

  • Mast arms, span wires, and poles are structurally designed for wind load per AASHTO LTS using the signal, sign, and luminaire loads listed on the plan sheets.

  • Layout sheets follow standard scales such as 1 in = 20 ft or 1 in = 10 ft; verify all dimensions against the printed bar scale before scaling.

  • NEC Chapter 9 limits conduit fill to 40% for three or more conductors, and sets minimum bend radius and pull-point requirements.

  • Pull boxes or handholes are typically placed at each pole, at each change of direction, and at intervals not exceeding about 150 ft.

  • Plan symbols establish pole numbers, controller location, detector loops, conduit runs, service point, and utility conflicts; the legend governs interpretation.

  • Detector loops are laid out per lane with the loop dimensions and number of turns shown in the loop schedule, with lead-in routed to the nearest handhole.

Quick reference

Traffic Signal Installation and Construction

  • Poles are not erected until the foundation reaches the specified cure period or compressive strength, commonly 7 days or 75% of design strength.

  • Anchor bolt nuts are torqued to the pole manufacturer's value after the pole is plumbed on leveling nuts; grout is placed after alignment is verified.

  • NEC Article 250 requires each metal pole, cabinet, and device to be bonded to the equipment grounding conductor and to a ground electrode.

  • Neutral and equipment grounding conductors are kept separate in the cabinet and bonded only at the service point.

  • Cable pulling requires lubricant, respect for the cable's minimum bend radius and maximum pull tension, and about 3 ft of slack at each handhole.

  • OSHA 29 CFR 1926 Subpart P requires sloping, shoring, or a trench box for excavations 5 ft deep or more.

  • Loop lead-in cable is twisted, typically 4 to 6 twists per foot, to cancel noise induced from adjacent power conductors.

  • A megohmmeter insulation-resistance test and a point-to-point continuity check are performed before energizing; typical new-cable acceptance is 50 MΩ or more at 500 V DC.

Quick reference

Signal Operation, Timing, and Controllers

  • Yellow change interval: Y = t + V / (2a + 64.4g), where t is perception-reaction (about 1.0 s), V is approach speed in mph, a is deceleration in ft/s², and g is grade in ft/ft (positive uphill).

  • Red clearance interval: R = (W + L) / V, where W is the distance from the stop line to the far edge of the conflicting area, L is vehicle length, and V is speed in ft/s.

  • Minimum green must clear the detector-to-stop-line queue or satisfy pedestrian WALK plus clearance time, whichever governs.

  • Passage (vehicle extension) time is typically 2.0 to 3.0 s; gap reduction lowers the extension value the longer a detector remains occupied.

  • Coordinated-actuated operation is defined by cycle length, offset, split, and force-off points.

  • Recall modes: minimum recall places a call every cycle; maximum recall also holds the phase to maximum green; pedestrian recall places a pedestrian call every cycle.

  • NEMA TS-1/TS-2 controllers use A, B, and C harness connectors and SDLC serial links to detectors and the MMU; Type 170 and 2070 controllers use backplane bus architecture.

  • The conflict monitor (MMU) checks field outputs for conflicting greens, absence of red, and improper voltage, and forces the cabinet to flashing operation on a fault.

  • Protected-permissive left turns run protected on the arrow and permissive during the opposing through green, displayed with a flashing yellow arrow or doghouse.

Quick reference

Maintenance, Troubleshooting, and Inspection

  • After a conflict monitor trip, record the displayed fault code from the MMU before pressing reset, because resetting clears the diagnostic evidence.

  • No-green diagnosis sequence: confirm detector actuation, verify call registration at the controller, check recall and coordination settings, then inspect field wiring and the LED/lamps.

  • Healthy loop inductance is roughly 100 to 800 microhenries; a large deviation from the recorded baseline indicates an open or shorted loop or lead-in.

  • Faint 'phantom' illumination of an LED indication comes from leakage current in the field wiring; a bleeder resistor across the field terminal or wiring repair eliminates it.

  • Cabinet preventive maintenance: replace fan filters, renew desiccant, check surge arrestors, verify battery voltage, and torque terminal connections.

  • Loop failures commonly trace to saw-cut sealant failure, pavement cracking, or lead-in cable damage at the handhole splice.

  • Ground faults are isolated by disconnecting field circuits and meggering each conductor to ground; a sharp drop from the installation baseline indicates moisture or damaged insulation.

Quick reference

Work Zone Safety, Standards, and Codes

  • Taper length: L = W × S for speeds of 40 mph or less, and L = W × S² / 60 for 45 mph or more, where W is width in feet and S is speed in mph.

  • A temporary traffic control zone consists of the advance warning area, transition area, activity area, and termination area.

  • The activity area contains the work space, buffer space, and traffic space; buffer space is unoccupied and provides recovery distance for errant vehicles.

  • Flaggers use a retroreflective STOP/SLOW paddle; AFADs are used only where permitted by MUTCD and agency policy.

  • Workers exposed to traffic within the right-of-way wear ANSI/ISEA 107 Class 2 or Class 3 high-visibility apparel.

  • MUTCD Part 6 governs temporary traffic control; Part 4 governs traffic signals, including temporary signals used in TTC zones.

  • Drums used for channelization are at least 36 in tall; cones must meet the height specified for the posted speed.

  • Temporary signals in work zones need a backup power source or a flagger contingency plan if a failure could create conflicting movements.