IMSA Traffic Signal II study materials
IMSA Traffic Signal II study resources

IMSA Traffic Signal II study plan

IMSA Traffic Signal II · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Signal Design and Plan Reading & Signal Operation, Timing, and Controllers

  • Redraw a full set of signal plan sheets from memory structure: title block, plan view, phasing diagram, wiring schedule, and notes block, labeling the purpose of each

  • Compile a personal symbol legend of at least 30 standard traffic signal plan symbols (heads, detectors, conduit, pull boxes, poles, span wire) with a one-line definition for each

  • Trace a signal phasing diagram into a written phase sequence table showing movements, overlaps, and protected vs permitted left turns for a 4-approach intersection

  • Explain aloud, in under 5 minutes, how a plan-view layout maps to the physical field arrangement of poles, heads, and cabinet

Your checkpoint

A hand-drawn or digital 4-approach intersection layout plus a 30-entry symbol legend, both reviewed against your own notes for completeness

Week 2

Signal Operation, Timing, and Controllers

  • Define and write out every standard interval type (minimum green, passage/gap, yellow change, all-red, pedestrian walk and clearance) with the field condition each protects

  • Compute yellow change and all-red intervals for three approach speeds using the standard kinematic formulas, showing all units and assumptions

  • Build a complete timing sheet for one 4-phase intersection including min green, max green, extension, yellow, all-red, and pedestrian intervals

  • Distinguish actuated, semi-actuated, and pretimed operation and list two field clues that identify each in an existing cabinet

Your checkpoint

A completed timing sheet for one intersection with all calculations shown and a written justification paragraph for each interval value

Week 3

Signal Design and Plan Reading & Signal Operation, Timing, and Controllers

  • Convert a written operational need (e.g., left-turn protection, pedestrian crossing time, ADA-compliant crossing) into specific plan and timing requirements

  • Diagram a coordinated arterial time-space progression for three intersections at a fixed cycle length and compute offsets

  • Compare lead-lag vs lag-lead left-turn phasing and write down which conditions favor each

  • Identify at least 6 common plan-reading errors (wrong detector call, missing clearance, mismatched head count) and describe how each shows up in the field

Your checkpoint

A coordination diagram with computed offsets for a 3-intersection arterial plus a one-page list of 6 plan-reading pitfalls and their field symptoms

Week 4

Traffic Signal Installation and Construction & Maintenance, Troubleshooting, and Inspection

  • Sequence the installation workflow from staking and conduit to pole setting, head hanging, cabinet wiring, and turn-on, listing the inspection checkpoint at each stage

  • Write a pre-installation checklist covering clearances, foundation specs, grounding, service disconnect, and controller cabinet placement

  • Describe correct termination and labeling practices for cabinet wiring and articulate why mislabeled conductors cause later troubleshooting errors

  • Perform a mock inspection of a written installation scenario and record every defect you can identify

Your checkpoint

A 25-item pre-installation and inspection checklist you authored, applied to one written scenario with defects logged

Week 5

Maintenance, Troubleshooting, and Inspection & Traffic Signal Installation and Construction

  • Diagnose five written fault scenarios (no detection, flashing operation, conflicting indications, dark head, loop failure) by listing the first three test steps and expected readings for each

  • Explain the role of conflict monitors and how a flash condition is triggered and cleared

  • Measure and interpret voltage, continuity, and resistance readings with a multimeter given sample values, stating pass/fail and next action

  • Identify the top 5 documentation items a maintenance technician must record after any repair

Your checkpoint

A troubleshooting flowchart covering at least 5 fault categories, each ending in a corrective action and a documentation step

Week 6

Maintenance, Troubleshooting, and Inspection

  • Build a preventive maintenance schedule with intervals for lamp/LED checks, detector testing, cabinet cleaning, battery backup, and conflict monitor testing

  • Differentiate preventive, corrective, and emergency maintenance and give one realistic work order example for each

  • Practice writing a work order and a closeout record for a completed repair, including parts used, tests performed, and sign-off

  • List the safety precautions to take before opening a cabinet or entering the roadway for a repair

Your checkpoint

A one-page preventive maintenance calendar plus two completed sample work orders (one corrective, one preventive)

Week 7

Work Zone Safety, Standards, and Codes & Traffic Signal Installation and Construction

  • Plan a temporary traffic control setup for a signal maintenance closure, specifying taper, buffer, advance warning, and pedestrian routing

  • Match the appropriate standards and code references to at least 10 field situations (clearance, grounding, work zone device spacing, pedestrian access)

  • Identify the required personal protective equipment and high-visibility apparel for day and night work and state when flaggers or spotters are needed

  • Explain how to maintain accessibility and temporary pedestrian signals during construction

Your checkpoint

A drawn temporary traffic control plan for one signal maintenance scenario with device spacing labeled and a PPE list attached

Week 8

Signal Design and Plan Reading & Traffic Signal Installation and Construction & Signal Operation, Timing, and Controllers & Maintenance, Troubleshooting, and Inspection & Work Zone Safety, Standards, and Codes

  • Re-derive the two weakest calculations from weeks 1-7 without notes and check accuracy

  • Write and answer 60 original practice questions distributed evenly across all five domains

  • Review every logged error from prior weeks and rewrite each as a corrected one-line rule

  • Rehearse the full exam flow under a timed sitting and record per-domain scores

Your checkpoint

A scored 60-question self-test with per-domain results and a one-page 'final rules' sheet of corrected errors

Milestones

Week 2: Can produce a complete timing sheet for a 4-phase intersection from scratch in under 45 minutes with correct yellow and all-red values

Week 4: Can read any signal plan sheet and name the phase sequence and detector layout without referring to notes

Week 6: Can diagnose a written fault scenario to a specific component and corrective action within 10 minutes

Week 8: Scores at least 80% overall and at least 70% in every individual domain on the 60-question self-test