AIC AO key terms
AIC AO · Get comfortable with the vocabulary.
- Active listening
- Related: Feedback loop, Paraphrasing
A communication technique in which the receiver restates and clarifies the sender's message to confirm understanding, using paraphrasing, questions, and nonverbal cues rather than assuming meaning.
- Paraphrasing
- Related: Active listening, Feedback loop
Restating another person's message in your own words to verify comprehension and demonstrate engagement, often introduced with phrases such as 'So what you are saying is...'.
- Feedback loop
- Related: Active listening, Communication channel
The return path in a communication process through which the receiver's response confirms, questions, or corrects the message so the sender can adjust and close the exchange.
- Communication channel
- Related: Feedback loop, Chain of command
The medium used to carry a message, such as a meeting, email, phone call, or formal letter; channel choice affects speed, record-keeping, and risk of distortion.
- Chain of command
- Related: Communication channel, Delegation
The formal line of authority defining who reports to whom and the route through which instructions and information should flow within an organization or project team.
- Delegation
- Related: Chain of command, Responsibility matrix
Assigning responsibility and the necessary authority to another person to carry out a task while the delegator retains accountability for the outcome.
- Responsibility matrix
- Related: Delegation, Work breakdown structure
A chart mapping project activities against team members or roles to show who is responsible, accountable, consulted, or informed for each deliverable.
- Span of control
- Related: Chain of command, Organization chart
The number of subordinates who report directly to one supervisor; a wide span flattens the organization, while a narrow span adds management layers.
- Organization chart
- Related: Span of control, Chain of command
A diagram showing reporting relationships, departments, and levels of authority within a company or project organization, used to clarify roles and communication paths.
- Load-bearing wall
- Related: Structural system, Beam
A wall that supports structural loads from floors or roof above it; it cannot be removed or altered without providing an alternative load path, usually designed by an engineer.
- Structural system
- Related: Load-bearing wall, Dead load, Live load
The arrangement of framing members, walls, and foundations that together resist gravity, wind, and seismic forces and transfer loads safely to the ground.
- Dead load
- Related: Live load, Structural system
The permanent, static weight of a structure itself, including walls, floors, roofs, fixed equipment, and finishes, which remains essentially constant over the building's life.
- Live load
- Related: Dead load, Structural system
The non-permanent weight a structure must carry, such as occupants, furniture, and movable equipment; design values are set by building codes for each occupancy type.
- Beam
- Related: Load-bearing wall, Structural system
A horizontal structural member that carries loads applied along its length and transfers them to columns, walls, or other supports, primarily through bending.
- Bearing capacity
- Related: Structural system, Dead load
The maximum pressure a soil or foundation material can support without unacceptable settlement or shear failure; it governs footing size and foundation design.
- Curing
- Related: Concrete slump test, Compressive strength
Maintaining adequate moisture and temperature in freshly placed concrete so cement hydration can proceed, developing strength and durability over time.
- Concrete slump test
- Related: Curing, Compressive strength
A field test using a standard cone to measure the consistency and workability of fresh concrete; results indicate water content and help detect overly wet or dry mixes.
- Compressive strength
- Related: Curing, Concrete slump test
The capacity of a material such as concrete or masonry to resist being squeezed; concrete strength is typically stated as the 28-day cylinder or cube test result.
- Nominal dimension
- Related: Tolerance
The approximate labeled size of lumber or masonry, larger than its actual finished size after surfacing or jointing, such as a 2x4 that measures 1-1/2 by 3-1/2 inches.
- Tolerance
- Related: Nominal dimension, Specification
The permissible variation from a specified dimension, alignment, or material property within which the work will still be accepted as conforming to the contract documents.
- Specification
- Related: Tolerance, Addendum
The written portion of the contract documents describing required materials, standards, workmanship, and testing, complementing the drawings that show size and location.
- Building information modeling (BIM)
- Related: Clash detection, Specification
A digital, object-based model of a facility containing geometry and data used for coordination, clash detection, quantity takeoff, and lifecycle information management.
- Clash detection
- Related: Building information modeling (BIM), Coordination drawing
A modeling review process that identifies physical or spatial conflicts among structural, mechanical, electrical, and plumbing elements before construction, avoiding field rework.
- Coordination drawing
- Related: Clash detection, Building information modeling (BIM)
A drawing combining multiple trades' systems to show routing and clearances, resolving conflicts among structural, mechanical, electrical, and plumbing work before installation.
- Addendum
- Related: Specification, Change order
A written modification to bidding or contract documents issued before the bid opening or contract execution, becoming part of the documents and binding on bidders.
- Unit price
- Related: Quantity takeoff, Contingency
A stated cost per unit of work or material, such as per cubic yard or square foot, used to price variable quantities and to value authorized changes.
- Quantity takeoff
- Related: Unit price, Work breakdown structure
The systematic measurement of materials and work items from drawings and specifications to produce quantities that are priced in an estimate.
- Contingency
- Related: Unit price, Earned value
A reserve of money or time set aside to cover known risks and unknowns that are likely to affect cost or schedule but cannot be precisely identified in advance.
- Earned value
- Related: Contingency, Cost code
A cost-control measure comparing budgeted value of work performed against actual cost and planned schedule, yielding cost and schedule variance indicators for the project.
- Cost code
- Related: Earned value, Work breakdown structure
A standardized account number assigned to a work category or cost item so that budgets, commitments, and actual expenditures can be tracked and compared consistently.
- Retainage
- Related: Progress payment, Lien
A percentage of each payment withheld by the owner until contract completion or specified milestones, providing leverage to ensure the contractor finishes and corrects defects.
- Progress payment
- Related: Retainage, Schedule of values
A periodic payment to the contractor for work completed and materials stored during a billing period, typically based on an approved application and subject to retainage.
- Schedule of values
- Related: Progress payment, Cost code
An itemized breakdown allocating the contract sum to work items; it supports progress payment requests and provides a basis for measuring completed work.
- Critical path
- Related: Float, Gantt chart
The longest sequence of dependent activities through a project network, which determines the shortest possible project duration; any delay on it delays completion.
- Float
- Related: Critical path, Gantt chart
The amount of time an activity can be delayed without delaying the project finish (total float) or its successor (free float).
- Gantt chart
- Related: Critical path, Float
A bar chart displaying activities against a calendar timeline, showing durations, start and finish dates, and often dependencies and progress for easy visual communication.
- Work breakdown structure
- Related: Quantity takeoff, Responsibility matrix
A hierarchical decomposition of project scope into progressively smaller, manageable work packages that can be estimated, scheduled, assigned, and controlled.
- Look-ahead schedule
- Related: Critical path, Gantt chart
A short-interval, rolling schedule covering the next few weeks that details upcoming activities, resources, and constraints to support weekly coordination and commitment planning.
- Job hazard analysis
- Related: Personal protective equipment, Toolbox talk
A method of examining a task step by step to identify hazards and define controls, safe procedures, and required protective equipment before work begins.
- Toolbox talk
- Related: Job hazard analysis, Personal protective equipment
A brief, task-focused safety meeting held at the work site before or during a shift to review hazards, controls, and required procedures with the crew.
- Personal protective equipment
- Related: Job hazard analysis, Toolbox talk
Wearable gear such as hard hats, safety glasses, gloves, and fall protection supplied to protect workers from hazards that cannot be eliminated or controlled by other means.
- Competent person
- Related: Job hazard analysis, Toolbox talk
A person capable of identifying existing and predictable hazards and authorized to take prompt corrective action to eliminate them, as required for certain high-risk activities.
- Punch list
- Related: Substantial completion, Change order
A documented list of incomplete or defective work items identified near substantial completion that the contractor must correct before final acceptance and final payment.
- Substantial completion
- Related: Punch list, Retainage
The stage at which the work is sufficiently complete for the owner's intended use, triggering warranty start, retainage adjustments, and the punch list process.
- Change order
- Related: Addendum, Punch list
A written, signed amendment to the contract modifying scope, cost, or time, executed by the owner and contractor after the change has been priced and approved.
- Lien
- Related: Retainage, Progress payment
A legal claim against property filed by a party who supplied labor or materials and was not paid, potentially encumbering the owner's title until resolved.
- Request for information
- Related: Specification, Change order
A formal written question from the contractor to the design team seeking clarification of contract documents, with the answer recorded and distributed to all affected parties.