BSEH Secondary NSQF Construction · Get comfortable with the vocabulary.

Personal Protective Equipment (PPE)

The helmet, safety boots, gloves, goggles, harness and similar gear a worker wears to reduce injury risk on site. It is the last line of defence after hazards have been removed or controlled.

Related: Toolbox Talk, Safety Signage
Toolbox Talk

A short, informal briefing held at the workplace before work starts, covering the day's hazards, method and controls. Attendance is normally recorded so the employer can show workers were informed.

Related: Personal Protective Equipment (PPE), Risk Assessment
Risk Assessment

A structured look at a task to identify what could cause harm, how likely and how serious that harm is, and what controls will reduce it. It is recorded and reviewed when conditions change.

Related: Toolbox Talk, Permit to Work
Permit to Work

A written authorisation allowing a specific high-risk job, such as hot work or confined-space entry, under stated precautions and time limits. Work may not start until the permit is signed and issued.

Related: Risk Assessment, Safety Signage
Safety Signage

Standardised signs using shape and colour to convey prohibition, warning, mandatory action or safe condition, such as red circles for bans and yellow triangles for warnings. They supplement, never replace, physical controls.

Related: Personal Protective Equipment (PPE), Permit to Work
Scaffold Inspection Tag

A tag fixed to a scaffold showing whether it is safe for use, who checked it and when the next inspection is due. A red or missing tag means the scaffold must not be used.

Related: Guardrail and Toe Board, Personal Protective Equipment (PPE)
Guardrail and Toe Board

The upper rail, mid rail and low upstand fitted to open edges of scaffolds, excavations and floors to stop people falling and to prevent tools or material being kicked off the edge.

Related: Scaffold Inspection Tag, Excavation Shoring
Excavation Shoring

Temporary supports such as timber, steel sheets or hydraulic braces used to stop the sides of a trench collapsing onto workers. Battering back the sides to a safe slope is an alternative control.

Related: Guardrail and Toe Board, Confined Space
Confined Space

An enclosed or partly enclosed area with restricted entry and exit that is not meant for continuous occupancy and may hold toxic gas, low oxygen or flooding risk. Entry needs a permit and gas testing.

Related: Permit to Work, Excavation Shoring
Material Safety Data Sheet (MSDS)

A supplier document giving the hazards, safe handling, storage, first-aid and spill measures for a chemical product such as cement, thinner or solvent. It must be available where the product is used.

Related: Silicosis, Dust Suppression
Silicosis

A permanent lung disease caused by breathing fine crystalline silica dust from cutting, grinding or drilling concrete, stone and brick. Prevention relies on wet methods, extraction and suitable respiratory protection.

Related: Material Safety Data Sheet (MSDS), Dust Suppression
Dust Suppression

Methods used to stop fine particles becoming airborne, such as wetting down, water sprays on cutting tools, local exhaust ventilation and enclosed mixing. It protects both workers and nearby residents.

Related: Silicosis, Material Safety Data Sheet (MSDS)
Noise Action Level

The measured sound exposure at which an employer must inform workers, provide hearing protection and arrange hearing checks. It is typically expressed as an average level over an eight-hour working day.

Related: Personal Protective Equipment (PPE), Dust Suppression
Segregation of Waste

Separating construction waste at source into streams such as concrete rubble, timber, metal, plastic and hazardous items so each can be reused, recycled or sent to the correct disposal route.

Related: Material Safety Data Sheet (MSDS), Dust Suppression
Cement Hydration

The chemical reaction between cement and water that forms strong interlocking compounds and hardens the paste. It continues for a long time and needs moisture to proceed, so curing matters.

Related: Water-Cement Ratio, Curing
Water-Cement Ratio

The mass of water divided by the mass of cement in a concrete mix. Lower ratios generally give stronger, denser, more durable concrete, while too little water makes the mix unworkable.

Related: Cement Hydration, Workability (Slump)
Workability (Slump)

How easily a fresh concrete or mortar mix can be placed, compacted and finished without segregation. The slump test measures it by the drop of a moulded cone of concrete.

Related: Water-Cement Ratio, Compaction of Concrete
Aggregate Grading

The distribution of particle sizes in the sand and coarse aggregate of a mix. Good grading fills voids efficiently, reduces the cement paste needed and improves strength and finish.

Related: Water-Cement Ratio, Compaction of Concrete
Brick Absorption

The amount of water a brick can soak up, expressed as a percentage of its dry mass. High absorption bricks are more porous, weaker in frost and more likely to draw moisture from mortar.

Related: Mortar Mix Ratio, Efflorescence
Efflorescence

A white powdery salt deposit that appears on masonry or plaster surfaces when soluble salts migrate to the face with moisture and crystallise as it dries. It signals damp movement and is brushed off dry.

Related: Brick Absorption, Curing
Curing

Keeping fresh concrete, mortar or plaster moist and at a suitable temperature for a set period so it gains strength and durability. Methods include water ponding, wet covers and curing compounds.

Related: Cement Hydration, Compaction of Concrete
Compaction of Concrete

Removing trapped air from placed concrete by vibration or tamping so it fully surrounds reinforcement and forms a dense mass. Poor compaction leaves honeycombing and weak, permeable zones.

Related: Workability (Slump), Curing
Mortar Mix Ratio

The proportion of cement, lime and sand in a mortar, written in parts by volume, for example 1:4. Richer mixes are stronger and less porous but stiffer and more prone to shrinkage cracking.

Related: Brick Absorption, English Bond
English Bond

A brick walling pattern with alternating courses of stretchers and headers. It is strong and resists longitudinal cracking, though it is slower to lay than stretcher bond.

Related: Mortar Mix Ratio, Quoin
Quoin

The corner stone or brick forming the external angle of a wall. Quoins are often laid as long and short blocks to give a neat, strong corner that ties the two wall faces together.

Related: English Bond, Plumb and Level
Plumb and Level

Checking that a vertical element is truly upright and a horizontal element is truly flat, using a spirit level, plumb bob or laser. Both checks are essential before masonry, joinery or pipework is fixed.

Related: Quoin, Spirit Level
Spirit Level

A tool with sealed vials of liquid and an air bubble, used to check horizontal and vertical alignment. The bubble centres between the marks when the surface is true.

Related: Plumb and Level, Try Square
Try Square

A woodworking or metalworking tool with a stock and a blade fixed at right angles, used to mark and test square corners and to check that a face is straight.

Related: Spirit Level, Plumb and Level
Angle Grinder Safety Guard

A fixed cover over part of a grinding or cutting disc that stops fragments and sparks being thrown at the operator. It must never be removed, and the disc rating must match the machine speed.

Related: Personal Protective Equipment (PPE), Residual Current Device (RCD)
Residual Current Device (RCD)

A protective switch that cuts power quickly when it detects current leaking to earth, such as through a damaged cable or a person. Portable tools on site are normally supplied through one.

Related: Angle Grinder Safety Guard, Earthing
Concrete Vibrator

A power tool with a flexible poker or a vibrating head used to compact placed concrete and release trapped air. It must be inserted at regular spacing and withdrawn slowly to avoid voids.

Related: Compaction of Concrete, Workability (Slump)
Scale and Representative Fraction

The ratio between a distance on a drawing and the real distance it represents, such as 1:100, where one unit on paper equals one hundred on site. Every dimension should be read with the scale in mind.

Related: Plan, Elevation and Section, Dimension Line
Plan, Elevation and Section

The three standard orthographic views: a plan looks down from above, an elevation looks at a face from the side, and a section shows a cut-through revealing internal construction.

Related: Scale and Representative Fraction, Dimension Line
Dimension Line

A thin line on a drawing, usually ending in arrowheads or oblique ticks, that shows the extent of a measured distance. The figure written above it gives the actual size in millimetres.

Related: Scale and Representative Fraction, Plan, Elevation and Section
Centre Line

A chain-dotted line used on drawings to mark the axis of symmetry, the centre of a circular feature or the middle of a wall or pipe run. It helps set out positions accurately.

Related: Dimension Line, Plan, Elevation and Section
Take-Off (Quantity Take-Off)

The process of measuring and listing quantities of work from drawings and specifications, such as cubic metres of concrete or square metres of plaster, so costs and materials can be estimated.

Related: Bill of Quantities, Bar Bending Schedule
Bill of Quantities

A priced document listing measured items of work with descriptions, units and quantities, used to obtain tenders and to value work as it proceeds. It is prepared from a quantity take-off.

Related: Take-Off (Quantity Take-Off), Bar Bending Schedule
Bar Bending Schedule

A table giving the bar mark, size, shape, number, cutting length and total weight of each reinforcement bar in a concrete element. It is used for ordering steel and checking fixing on site.

Related: Take-Off (Quantity Take-Off), Formwork
Formwork

The temporary mould of timber, plywood or metal panels that holds fresh concrete in shape until it hardens. It must be strong, tight against grout loss and correctly propped.

Related: Bar Bending Schedule, Compaction of Concrete
Mortise and Tenon Joint

A strong wood joint in which a projecting tenon on one member fits into a matching rectangular mortise cut in the other. It is usually glued and sometimes pinned with a dowel.

Related: Dovetail Joint, Seasoning of Timber
Dovetail Joint

A joint made of flared pins and matching tails that interlock and resist being pulled apart along the length of the members. It is common in drawer boxes and carcass corners.

Related: Mortise and Tenon Joint, Seasoning of Timber
Seasoning of Timber

Controlled drying of timber, in air or in a kiln, to reduce moisture content before use. Properly seasoned wood is stronger, more stable and less likely to shrink, warp or split after fixing.

Related: Mortise and Tenon Joint, Dovetail Joint
Water Trap (P-Trap)

A U-shaped bend in a drain that holds a small seal of water, stopping sewer gas and smells from entering the building. It needs a vent to prevent the seal being siphoned away.

Related: Soil Pipe and Vent Pipe, Inspection Chamber
Soil Pipe and Vent Pipe

The soil pipe carries sewage from water closets to the drain, while the vent pipe admits air to the system so traps keep their seals and gases escape safely above roof level.

Related: Water Trap (P-Trap), Inspection Chamber
Inspection Chamber

An access point on a drainage run, fitted with a removable cover, where blockages can be rodded and the flow checked. It is placed at changes of direction, junctions and intervals along the drain.

Related: Water Trap (P-Trap), Soil Pipe and Vent Pipe
Earthing

Connecting exposed metal parts and the installation's earth conductor to the general mass of earth so fault current flows safely and protective devices operate quickly. It is fundamental to electrical safety.

Related: Residual Current Device (RCD), Circuit Breaker
Circuit Breaker

An automatic switch that opens a circuit when current exceeds its rating, protecting cables from overload and short circuit. Unlike a fuse, it can be reset after the fault is cleared.

Related: Earthing, Residual Current Device (RCD)
Two-Way Switching

A wiring arrangement using two changeover switches so one lamp can be operated from either of two positions, as on a staircase or corridor. It needs a three-core strapper between the switches.

Related: Circuit Breaker, Earthing
Plaster Setting Time

The period during which a plaster or mortar stiffens after mixing and can no longer be worked. Adding water to a mix that has begun to set weakens it and is not permitted.

Related: Curing, Skimming
Skimming

Applying a thin final coat of fine plaster or filler over a prepared background to give a smooth, flat surface ready for decoration. It is worked tight and polished as it stiffens.

Related: Plaster Setting Time, Primer and Undercoat
Primer and Undercoat

The preparatory paint layers applied before the finish coat: the primer seals and bonds to the surface, and the undercoat builds opacity and gives the topcoat an even base.

Related: Skimming, Plaster Setting Time
Tile Adhesive Bed

The layer of cement-based or ready-mixed adhesive, combed with a notched trowel, that bonds tiles to the substrate. Full, even coverage prevents hollow spots and loose tiles.

Related: Skimming, Primer and Undercoat
Employability Skills

The workplace behaviours and attitudes employers expect alongside technical ability, such as punctuality, teamwork, safe working, clear communication and willingness to learn. They are assessed in the NSQF employability module.

Related: Entrepreneurship, Cost Estimate
Entrepreneurship

Identifying a need in the market and organising money, materials, people and risk to meet it through a small business. For a construction worker it can mean contracting, supply or specialist services.

Related: Employability Skills, Cost Estimate
Cost Estimate

A calculated forecast of the money needed for a job, covering materials, labour, tools, transport and overheads, plus a margin. Accurate take-off quantities are the basis of a reliable estimate.

Related: Take-Off (Quantity Take-Off), Entrepreneurship