BSEH Secondary NSQF Construction key terms
BSEH Secondary NSQF Construction · Get comfortable with the vocabulary.
- Personal Protective Equipment (PPE)
- Related: Toolbox Talk, Safety Signage
The helmet, safety boots, gloves, goggles, harness and similar gear a worker wears to reduce injury risk on site. It is the last line of defence after hazards have been removed or controlled.
- Toolbox Talk
- Related: Personal Protective Equipment (PPE), Risk Assessment
A short, informal briefing held at the workplace before work starts, covering the day's hazards, method and controls. Attendance is normally recorded so the employer can show workers were informed.
- Risk Assessment
- Related: Toolbox Talk, Permit to Work
A structured look at a task to identify what could cause harm, how likely and how serious that harm is, and what controls will reduce it. It is recorded and reviewed when conditions change.
- Permit to Work
- Related: Risk Assessment, Safety Signage
A written authorisation allowing a specific high-risk job, such as hot work or confined-space entry, under stated precautions and time limits. Work may not start until the permit is signed and issued.
- Safety Signage
- Related: Personal Protective Equipment (PPE), Permit to Work
Standardised signs using shape and colour to convey prohibition, warning, mandatory action or safe condition, such as red circles for bans and yellow triangles for warnings. They supplement, never replace, physical controls.
- Scaffold Inspection Tag
- Related: Guardrail and Toe Board, Personal Protective Equipment (PPE)
A tag fixed to a scaffold showing whether it is safe for use, who checked it and when the next inspection is due. A red or missing tag means the scaffold must not be used.
- Guardrail and Toe Board
- Related: Scaffold Inspection Tag, Excavation Shoring
The upper rail, mid rail and low upstand fitted to open edges of scaffolds, excavations and floors to stop people falling and to prevent tools or material being kicked off the edge.
- Excavation Shoring
- Related: Guardrail and Toe Board, Confined Space
Temporary supports such as timber, steel sheets or hydraulic braces used to stop the sides of a trench collapsing onto workers. Battering back the sides to a safe slope is an alternative control.
- Confined Space
- Related: Permit to Work, Excavation Shoring
An enclosed or partly enclosed area with restricted entry and exit that is not meant for continuous occupancy and may hold toxic gas, low oxygen or flooding risk. Entry needs a permit and gas testing.
- Material Safety Data Sheet (MSDS)
- Related: Silicosis, Dust Suppression
A supplier document giving the hazards, safe handling, storage, first-aid and spill measures for a chemical product such as cement, thinner or solvent. It must be available where the product is used.
- Silicosis
- Related: Material Safety Data Sheet (MSDS), Dust Suppression
A permanent lung disease caused by breathing fine crystalline silica dust from cutting, grinding or drilling concrete, stone and brick. Prevention relies on wet methods, extraction and suitable respiratory protection.
- Dust Suppression
- Related: Silicosis, Material Safety Data Sheet (MSDS)
Methods used to stop fine particles becoming airborne, such as wetting down, water sprays on cutting tools, local exhaust ventilation and enclosed mixing. It protects both workers and nearby residents.
- Noise Action Level
- Related: Personal Protective Equipment (PPE), Dust Suppression
The measured sound exposure at which an employer must inform workers, provide hearing protection and arrange hearing checks. It is typically expressed as an average level over an eight-hour working day.
- Segregation of Waste
- Related: Material Safety Data Sheet (MSDS), Dust Suppression
Separating construction waste at source into streams such as concrete rubble, timber, metal, plastic and hazardous items so each can be reused, recycled or sent to the correct disposal route.
- Cement Hydration
- Related: Water-Cement Ratio, Curing
The chemical reaction between cement and water that forms strong interlocking compounds and hardens the paste. It continues for a long time and needs moisture to proceed, so curing matters.
- Water-Cement Ratio
- Related: Cement Hydration, Workability (Slump)
The mass of water divided by the mass of cement in a concrete mix. Lower ratios generally give stronger, denser, more durable concrete, while too little water makes the mix unworkable.
- Workability (Slump)
- Related: Water-Cement Ratio, Compaction of Concrete
How easily a fresh concrete or mortar mix can be placed, compacted and finished without segregation. The slump test measures it by the drop of a moulded cone of concrete.
- Aggregate Grading
- Related: Water-Cement Ratio, Compaction of Concrete
The distribution of particle sizes in the sand and coarse aggregate of a mix. Good grading fills voids efficiently, reduces the cement paste needed and improves strength and finish.
- Brick Absorption
- Related: Mortar Mix Ratio, Efflorescence
The amount of water a brick can soak up, expressed as a percentage of its dry mass. High absorption bricks are more porous, weaker in frost and more likely to draw moisture from mortar.
- Efflorescence
- Related: Brick Absorption, Curing
A white powdery salt deposit that appears on masonry or plaster surfaces when soluble salts migrate to the face with moisture and crystallise as it dries. It signals damp movement and is brushed off dry.
- Curing
- Related: Cement Hydration, Compaction of Concrete
Keeping fresh concrete, mortar or plaster moist and at a suitable temperature for a set period so it gains strength and durability. Methods include water ponding, wet covers and curing compounds.
- Compaction of Concrete
- Related: Workability (Slump), Curing
Removing trapped air from placed concrete by vibration or tamping so it fully surrounds reinforcement and forms a dense mass. Poor compaction leaves honeycombing and weak, permeable zones.
- Mortar Mix Ratio
- Related: Brick Absorption, English Bond
The proportion of cement, lime and sand in a mortar, written in parts by volume, for example 1:4. Richer mixes are stronger and less porous but stiffer and more prone to shrinkage cracking.
- English Bond
- Related: Mortar Mix Ratio, Quoin
A brick walling pattern with alternating courses of stretchers and headers. It is strong and resists longitudinal cracking, though it is slower to lay than stretcher bond.
- Quoin
- Related: English Bond, Plumb and Level
The corner stone or brick forming the external angle of a wall. Quoins are often laid as long and short blocks to give a neat, strong corner that ties the two wall faces together.
- Plumb and Level
- Related: Quoin, Spirit Level
Checking that a vertical element is truly upright and a horizontal element is truly flat, using a spirit level, plumb bob or laser. Both checks are essential before masonry, joinery or pipework is fixed.
- Spirit Level
- Related: Plumb and Level, Try Square
A tool with sealed vials of liquid and an air bubble, used to check horizontal and vertical alignment. The bubble centres between the marks when the surface is true.
- Try Square
- Related: Spirit Level, Plumb and Level
A woodworking or metalworking tool with a stock and a blade fixed at right angles, used to mark and test square corners and to check that a face is straight.
- Angle Grinder Safety Guard
- Related: Personal Protective Equipment (PPE), Residual Current Device (RCD)
A fixed cover over part of a grinding or cutting disc that stops fragments and sparks being thrown at the operator. It must never be removed, and the disc rating must match the machine speed.
- Residual Current Device (RCD)
- Related: Angle Grinder Safety Guard, Earthing
A protective switch that cuts power quickly when it detects current leaking to earth, such as through a damaged cable or a person. Portable tools on site are normally supplied through one.
- Concrete Vibrator
- Related: Compaction of Concrete, Workability (Slump)
A power tool with a flexible poker or a vibrating head used to compact placed concrete and release trapped air. It must be inserted at regular spacing and withdrawn slowly to avoid voids.
- Scale and Representative Fraction
- Related: Plan, Elevation and Section, Dimension Line
The ratio between a distance on a drawing and the real distance it represents, such as 1:100, where one unit on paper equals one hundred on site. Every dimension should be read with the scale in mind.
- Plan, Elevation and Section
- Related: Scale and Representative Fraction, Dimension Line
The three standard orthographic views: a plan looks down from above, an elevation looks at a face from the side, and a section shows a cut-through revealing internal construction.
- Dimension Line
- Related: Scale and Representative Fraction, Plan, Elevation and Section
A thin line on a drawing, usually ending in arrowheads or oblique ticks, that shows the extent of a measured distance. The figure written above it gives the actual size in millimetres.
- Centre Line
- Related: Dimension Line, Plan, Elevation and Section
A chain-dotted line used on drawings to mark the axis of symmetry, the centre of a circular feature or the middle of a wall or pipe run. It helps set out positions accurately.
- Take-Off (Quantity Take-Off)
- Related: Bill of Quantities, Bar Bending Schedule
The process of measuring and listing quantities of work from drawings and specifications, such as cubic metres of concrete or square metres of plaster, so costs and materials can be estimated.
- Bill of Quantities
- Related: Take-Off (Quantity Take-Off), Bar Bending Schedule
A priced document listing measured items of work with descriptions, units and quantities, used to obtain tenders and to value work as it proceeds. It is prepared from a quantity take-off.
- Bar Bending Schedule
- Related: Take-Off (Quantity Take-Off), Formwork
A table giving the bar mark, size, shape, number, cutting length and total weight of each reinforcement bar in a concrete element. It is used for ordering steel and checking fixing on site.
- Formwork
- Related: Bar Bending Schedule, Compaction of Concrete
The temporary mould of timber, plywood or metal panels that holds fresh concrete in shape until it hardens. It must be strong, tight against grout loss and correctly propped.
- Mortise and Tenon Joint
- Related: Dovetail Joint, Seasoning of Timber
A strong wood joint in which a projecting tenon on one member fits into a matching rectangular mortise cut in the other. It is usually glued and sometimes pinned with a dowel.
- Dovetail Joint
- Related: Mortise and Tenon Joint, Seasoning of Timber
A joint made of flared pins and matching tails that interlock and resist being pulled apart along the length of the members. It is common in drawer boxes and carcass corners.
- Seasoning of Timber
- Related: Mortise and Tenon Joint, Dovetail Joint
Controlled drying of timber, in air or in a kiln, to reduce moisture content before use. Properly seasoned wood is stronger, more stable and less likely to shrink, warp or split after fixing.
- Water Trap (P-Trap)
- Related: Soil Pipe and Vent Pipe, Inspection Chamber
A U-shaped bend in a drain that holds a small seal of water, stopping sewer gas and smells from entering the building. It needs a vent to prevent the seal being siphoned away.
- Soil Pipe and Vent Pipe
- Related: Water Trap (P-Trap), Inspection Chamber
The soil pipe carries sewage from water closets to the drain, while the vent pipe admits air to the system so traps keep their seals and gases escape safely above roof level.
- Inspection Chamber
- Related: Water Trap (P-Trap), Soil Pipe and Vent Pipe
An access point on a drainage run, fitted with a removable cover, where blockages can be rodded and the flow checked. It is placed at changes of direction, junctions and intervals along the drain.
- Earthing
- Related: Residual Current Device (RCD), Circuit Breaker
Connecting exposed metal parts and the installation's earth conductor to the general mass of earth so fault current flows safely and protective devices operate quickly. It is fundamental to electrical safety.
- Circuit Breaker
- Related: Earthing, Residual Current Device (RCD)
An automatic switch that opens a circuit when current exceeds its rating, protecting cables from overload and short circuit. Unlike a fuse, it can be reset after the fault is cleared.
- Two-Way Switching
- Related: Circuit Breaker, Earthing
A wiring arrangement using two changeover switches so one lamp can be operated from either of two positions, as on a staircase or corridor. It needs a three-core strapper between the switches.
- Plaster Setting Time
- Related: Curing, Skimming
The period during which a plaster or mortar stiffens after mixing and can no longer be worked. Adding water to a mix that has begun to set weakens it and is not permitted.
- Skimming
- Related: Plaster Setting Time, Primer and Undercoat
Applying a thin final coat of fine plaster or filler over a prepared background to give a smooth, flat surface ready for decoration. It is worked tight and polished as it stiffens.
- Primer and Undercoat
- Related: Skimming, Plaster Setting Time
The preparatory paint layers applied before the finish coat: the primer seals and bonds to the surface, and the undercoat builds opacity and gives the topcoat an even base.
- Tile Adhesive Bed
- Related: Skimming, Primer and Undercoat
The layer of cement-based or ready-mixed adhesive, combed with a notched trowel, that bonds tiles to the substrate. Full, even coverage prevents hollow spots and loose tiles.
- Employability Skills
- Related: Entrepreneurship, Cost Estimate
The workplace behaviours and attitudes employers expect alongside technical ability, such as punctuality, teamwork, safe working, clear communication and willingness to learn. They are assessed in the NSQF employability module.
- Entrepreneurship
- Related: Employability Skills, Cost Estimate
Identifying a need in the market and organising money, materials, people and risk to meet it through a small business. For a construction worker it can mean contracting, supply or specialist services.
- Cost Estimate
- Related: Take-Off (Quantity Take-Off), Entrepreneurship
A calculated forecast of the money needed for a job, covering materials, labour, tools, transport and overheads, plus a margin. Accurate take-off quantities are the basis of a reliable estimate.