BSEH Secondary NSQF Construction study plan
BSEH Secondary NSQF Construction · Give each week a clear focus.
8 weeks · About 7 hours per week
Masonry and Concreting Works & Construction Materials and Their Properties
Distinguish the five main grades of ordinary Portland-type cement by their typical use cases and list two field clues for each
Explain how water-cement ratio, curing duration and aggregate grading each change the strength and workability of a concrete mix
Sequence the steps of brick masonry in English bond and state the purpose of each step from soaking to pointing
Name four defects in fresh or hardened concrete (segregation, bleeding, honeycombing, shrinkage cracking) and give one corrective action per defect
Compute the cement, sand and coarse aggregate quantities for a nominal 1:2:4 mix of a stated volume using dry-volume factor 1.54
Your checkpoint
A one-page concrete and masonry cheat sheet with mix ratios, curing times, brick bonds and defect-fix pairs, plus two fully worked quantity calculations
Masonry and Concreting Works & Building Drawing, Measurement and Estimation
Describe the formwork, reinforcement and placing sequence for a reinforced concrete slab and a column, including stripping times
Interpret a simple plan and section drawing well enough to read wall thickness, door and window sizes, and floor levels
Measure lengths and areas from a scaled plan and convert them to cubic quantities for excavation and concrete
Explain the purpose and typical spacing of main and distribution reinforcement in a one-way slab
Prepare a short bar-bending schedule for a rectangular slab given bar diameter, spacing and cover
Your checkpoint
A hand-sketched plan of a single-room structure with a measurement sheet and a bar-bending schedule for its slab
Construction Materials and Their Properties & Carpentry, Joinery and Woodwork
Compare the properties and typical uses of bricks, concrete blocks, stone, timber, plywood, glass and steel sections
Classify common timber types by hardness and durability, and state where each is appropriate in a building
Identify the main woodworking joints (mortise and tenon, dovetail, half-lap, housing) and describe the load or use each suits
Explain seasoning of timber, its moisture-content target and how it prevents warping and shrinkage
List the standard sizes and grades of plywood and describe the glue lines and face grades that affect use
Your checkpoint
A two-column comparison table of ten construction materials with properties, typical uses and one limitation each, plus a labelled sketch of four wood joints
Hand Tools, Power Tools and Equipment & Construction Safety, Health and Environment
Match twenty hand and power tools to their correct use and state one misuse per family of tools
Describe safe handling and inspection routines for a circular saw, an angle grinder and a drilling machine
Explain the hierarchy of hazard control and apply it to three construction hazards such as falls, silica dust and electrical contact
State the correct use of personal protective equipment for cutting, mixing, welding and working at height
Outline first-aid and emergency response steps for a fall, an electric shock and a chemical splash
Your checkpoint
A tool safety card for five power tools with pre-use checks, PPE required and two common misuse examples, plus a hazard-control table for three site hazards
Construction Safety, Health and Environment & Finishing Works (Plastering, Painting, Flooring, Tiling)
Describe safe storage, handling and disposal of cement, paints, solvents and adhesives, including ventilation and fire precautions
Sequence a plastering operation from surface preparation to curing and state the mix and thickness for undercoat and finish coats
Explain the causes of common plaster defects such as crazing, blistering and efflorescence, with one remedy each
Describe surface preparation and coat sequence for painting on plaster, wood and metal surfaces
Outline tile and flooring laying steps, including bedding, joint width, levelling and grouting
Your checkpoint
A finishing works checklist covering plaster, paint and tiling, with defect-cause-remedy entries and a waste disposal note for each material
Plumbing, Sanitary and Water Supply Works & Electrical Wiring and Fittings in Buildings
Trace a cold water supply layout from source to fixture and explain the role of storage tank, pump, valve and air gap
Describe the layout and gradient requirements of a soil and waste drainage system, including traps and vent pipes
Identify common sanitary fittings and state the flow or connection requirement of each
Explain the basic wiring of a lighting circuit and a socket circuit, including live, neutral and earth conductors and their colour conventions
State the purpose of earthing, miniature circuit breakers and residual current devices, and describe one test for each
Your checkpoint
A hand-drawn single-line diagram of the water supply and drainage of a two-room unit plus a labelled lighting and socket circuit diagram with protective devices marked
Building Drawing, Measurement and Estimation & Carpentry, Joinery and Woodwork
Prepare a rate analysis for one cubic metre of brick masonry and one square metre of plastering using material and labour components
Build a simple bill of quantities for a small building from a measured sheet with units and quantities clearly stated
Explain the difference between a detailed estimate, an approximate estimate and a revised estimate
Describe the sequence of carpentry work for a door frame and shutter, from marking to fixing and finishing
List the checks for a finished door or window installation covering squareness, clearance, hinges and locking
Your checkpoint
A complete mini estimate for one room including quantities, rate analysis for two items and a total cost summary
Employability Skills and Entrepreneurship & Construction Safety, Health and Environment & Masonry and Concreting Works
Draft a short business idea for a small construction service, stating customer, cost, price and one risk
Explain the importance of communication, teamwork and time management on a construction site with one example each
Revise the weakest two domains using timed practice sets and record the accuracy of each attempt
Recite the key safety, mix-design and measurement facts from weeks one to seven without notes
Build a final one-page summary sheet linking safety, materials and measurement decisions across a project
Your checkpoint
A one-page business idea sheet plus a full-length timed mock test with a scored error log identifying two weak areas and a revision action for each
Milestones
Week 2: Can compute concrete quantities for a given volume from a nominal mix and read dimensions off a scaled plan without error in five out of five practice items
Week 4: Scores at least 70 percent on a 30-question set drawn from domains 1, 2, 3 and 5, and can name the control measure for three site hazards unaided
Week 6: Draws the water supply, drainage and basic electrical circuits of a small unit from memory with correct symbols and protective devices labelled
Week 7: Produces a bill of quantities and rate analysis with arithmetic checked twice and no unit mismatch between measurement sheet and estimate
Week 8: Completes a full-length timed mock at or above the target pass mark, with an error log covering every wrong answer and a dated revision plan