Haryana BSEH Senior Secondary NSQF Construction · Give each week a clear focus.
8 weeks · About 6 hours per week
Building Construction Practices: Masonry, Concreting, Plastering and Finishing & Construction Materials: Properties, Testing and Storage
Classify burnt clay bricks by compressive strength class as per IS 1077 and state the water-absorption limit that applies to each class.
Sketch and label English bond, Flemish bond and stretcher bond in plan and elevation, marking queen closers, bats and quoin positions.
Calculate the cement and sand quantities by volume and by bag count for 1:6 and 1:4 cement-sand mortar needed for a stated wall volume, allowing for 33 percent bulking of sand.
Identify efflorescence, stock-brick and under-burnt brick defects in a described consignment and state the correct storage and rejection action for each.
Your checkpoint
A single A4 reference sheet containing a 6-row brick classification table (class, strength, absorption, typical use) plus three labelled bond sketches with closer positions marked, self-checked against IS 1077 notes.
Building Construction Practices: Masonry, Concreting, Plastering and Finishing
Sequence the concreting operations from batching to curing, stating the maximum permissible time gap between adding water and placing, and the compaction method for each element type.
Match nominal mixes M10, M15, M20 and M25 to their volumetric proportions and to at least two appropriate site uses each.
Explain the three-coat and two-coat plastering sequences with the specified thickness of each coat and the curing duration before the next coat.
Diagnose ten common plaster and concrete surface defects by naming the defect, its likely cause and the remedial measure.
Your checkpoint
A written method statement of 350-450 words for casting a 1 m3 M20 slab, covering batching, slump check, vibration, finishing and a 7-day and 28-day curing schedule, plus a separate defect-cause-remedy table with 10 rows.
Construction Materials: Properties, Testing and Storage & Hand Tools, Power Tools, Equipment and Plant
Describe the field tests used to judge cement quality on receipt, including the rubbing, lump, water-float and visual tests, and state what each result indicates.
Compute the fineness modulus of a sand sample from a supplied set of sieve masses and classify the sand into its grading zone.
State the standard storage rules for cement, aggregates and steel reinforcement, including bag stacking height, maximum storage period and stacking clear of the ground.
Match at least fifteen hand tools to the masonry, concreting and plastering tasks each one performs, and state one misuse to avoid for each.
Your checkpoint
A worked laboratory-style record sheet showing a full sieve-analysis table, cumulative-retained percentages, fineness modulus calculation and grading conclusion, plus a 15-row tool-to-task matching table.
Occupational Safety, Health and Environment (OSHE) at Construction Sites & Hand Tools, Power Tools, Equipment and Plant
Select the correct personal protective equipment for six given site activities and justify each item against the specific hazard it controls.
State the safety rules for erecting, loading and dismantling tubular scaffolding, including the height at which guard rails and toe boards become mandatory.
Explain the hazards of using a portable grinder and a circular saw, listing the pre-use checks and the guards that must never be removed.
Apply the hierarchy of control to rank the most effective control measure for ten identified construction hazards.
Your checkpoint
A hazard identification and risk-control sheet covering 10 realistic site hazards with severity, likelihood, calculated risk rating, control measure and the hierarchy-of-control level used, each risk re-rated after control.
Building Drawing, Reading of Drawings and Blueprint Interpretation & Surveying, Setting Out and Levelling
Interpret a plan, section and elevation set by extracting all room sizes, wall thicknesses, opening sizes and levels into a single dimension schedule.
Convert a distance measured on a drawing to its real value using the stated scale, and specify the scale appropriate for a site plan, a floor plan and a detailed section.
Reduce a level book of six readings using the height-of-instrument method and confirm the results with the arithmetic check.
Describe the procedure for setting out a rectangular building outline using a baseline, offsets and the 3-4-5 diagonal check.
Your checkpoint
A dimension schedule extracted from a described single-storey plan set (rooms, walls, doors, windows, sill and lintel levels) plus a completed level book with six staff readings reduced by the height-of-instrument method and the arithmetic check shown as correct.
Surveying, Setting Out and Levelling & Estimation, Costing and Quantity Take-off
Reduce the same six-reading level book by the rise-and-fall method and demonstrate that both methods give identical reduced levels.
Calculate earthwork excavation volume for a trench of stated length, width and depth using the mid-section method, including the working-space allowance.
Take off brickwork and plaster quantities in cubic metres and square metres from a stated wall schedule, deducting openings correctly.
Prepare a rate analysis for one cubic metre of brickwork in cement mortar, listing material, labour and sundries with wastage percentages.
Your checkpoint
A complete quantity take-off for a described single-room load-bearing structure, ending in an abstract of cost with at least seven items, extension calculations, and a bar-bending-style steel schedule for the slab.
Estimation, Costing and Quantity Take-off & Introduction to the Construction Industry, Sectors and Career Pathways
Compute reinforcement quantity in kilograms from a given bar bending schedule and apply the correct unit weight formula for each bar diameter.
Differentiate between preliminary estimate, detailed estimate, revised estimate and repair estimate, and state one real situation that calls for each.
Describe the main construction sectors, the typical employer types in each, and the entry-level roles available to an NSQF Senior Secondary pass-out.
Map three career pathways from site trainee to supervisor or entrepreneur, naming the certification or experience step required at each stage.
Your checkpoint
A one-page career pathway map showing three routes with entry role, progression steps and required certifications, plus a one-page abstract of cost for the week 6 structure cross-checked against the rate analysis.
Communication, Employability and Entrepreneurial Skills & Occupational Safety, Health and Environment (OSHE) at Construction Sites
Draft a site progress report and a short email to a supplier using correct technical vocabulary, clarity and professional tone.
Deliver a two-minute spoken explanation of the safety controls for a working-at-height task, structured as hazard, control, check.
Outline the steps and documents needed to start a small construction contracting or repair business, including registration and basic costing.
Complete a timed full-syllabus mock test and review every incorrect answer against the source topic before the exam date.
Your checkpoint
A 90-minute timed mock test attempt scored and error-analysed by domain, a one-page professional CV with a covering note for a site trainee role, and a written two-minute script on working-at-height safety controls.
Milestones
Week 2: Can draw and label three masonry bonds from memory and write the full slab method statement without notes, correctly stating the M20 mix proportion and curing duration.
Week 4: Scores at least 80 percent on a self-made 25-question safety and materials quiz, and can complete a sieve-analysis fineness modulus calculation in under 15 minutes.
Week 6: Level book reduced by both height-of-instrument and rise-and-fall methods with matching results, and a seven-item abstract of cost produced without reference material.
Week 8: Mock test score at or above 70 percent overall with no single domain below 60 percent, and all errors logged with the corrected concept written out.