Week 1

Building Construction Practices: Masonry, Concreting, Plastering and Finishing & Construction Materials: Properties, Testing and Storage

  • Classify burnt clay bricks by compressive strength class as per IS 1077 and state the water-absorption limit that applies to each class.

  • Sketch and label English bond, Flemish bond and stretcher bond in plan and elevation, marking queen closers, bats and quoin positions.

  • Calculate the cement and sand quantities by volume and by bag count for 1:6 and 1:4 cement-sand mortar needed for a stated wall volume, allowing for 33 percent bulking of sand.

  • Identify efflorescence, stock-brick and under-burnt brick defects in a described consignment and state the correct storage and rejection action for each.

Your checkpoint

A single A4 reference sheet containing a 6-row brick classification table (class, strength, absorption, typical use) plus three labelled bond sketches with closer positions marked, self-checked against IS 1077 notes.

Week 2

Building Construction Practices: Masonry, Concreting, Plastering and Finishing

  • Sequence the concreting operations from batching to curing, stating the maximum permissible time gap between adding water and placing, and the compaction method for each element type.

  • Match nominal mixes M10, M15, M20 and M25 to their volumetric proportions and to at least two appropriate site uses each.

  • Explain the three-coat and two-coat plastering sequences with the specified thickness of each coat and the curing duration before the next coat.

  • Diagnose ten common plaster and concrete surface defects by naming the defect, its likely cause and the remedial measure.

Your checkpoint

A written method statement of 350-450 words for casting a 1 m3 M20 slab, covering batching, slump check, vibration, finishing and a 7-day and 28-day curing schedule, plus a separate defect-cause-remedy table with 10 rows.

Week 3

Construction Materials: Properties, Testing and Storage & Hand Tools, Power Tools, Equipment and Plant

  • Describe the field tests used to judge cement quality on receipt, including the rubbing, lump, water-float and visual tests, and state what each result indicates.

  • Compute the fineness modulus of a sand sample from a supplied set of sieve masses and classify the sand into its grading zone.

  • State the standard storage rules for cement, aggregates and steel reinforcement, including bag stacking height, maximum storage period and stacking clear of the ground.

  • Match at least fifteen hand tools to the masonry, concreting and plastering tasks each one performs, and state one misuse to avoid for each.

Your checkpoint

A worked laboratory-style record sheet showing a full sieve-analysis table, cumulative-retained percentages, fineness modulus calculation and grading conclusion, plus a 15-row tool-to-task matching table.

Week 4

Occupational Safety, Health and Environment (OSHE) at Construction Sites & Hand Tools, Power Tools, Equipment and Plant

  • Select the correct personal protective equipment for six given site activities and justify each item against the specific hazard it controls.

  • State the safety rules for erecting, loading and dismantling tubular scaffolding, including the height at which guard rails and toe boards become mandatory.

  • Explain the hazards of using a portable grinder and a circular saw, listing the pre-use checks and the guards that must never be removed.

  • Apply the hierarchy of control to rank the most effective control measure for ten identified construction hazards.

Your checkpoint

A hazard identification and risk-control sheet covering 10 realistic site hazards with severity, likelihood, calculated risk rating, control measure and the hierarchy-of-control level used, each risk re-rated after control.

Week 5

Building Drawing, Reading of Drawings and Blueprint Interpretation & Surveying, Setting Out and Levelling

  • Interpret a plan, section and elevation set by extracting all room sizes, wall thicknesses, opening sizes and levels into a single dimension schedule.

  • Convert a distance measured on a drawing to its real value using the stated scale, and specify the scale appropriate for a site plan, a floor plan and a detailed section.

  • Reduce a level book of six readings using the height-of-instrument method and confirm the results with the arithmetic check.

  • Describe the procedure for setting out a rectangular building outline using a baseline, offsets and the 3-4-5 diagonal check.

Your checkpoint

A dimension schedule extracted from a described single-storey plan set (rooms, walls, doors, windows, sill and lintel levels) plus a completed level book with six staff readings reduced by the height-of-instrument method and the arithmetic check shown as correct.

Week 6

Surveying, Setting Out and Levelling & Estimation, Costing and Quantity Take-off

  • Reduce the same six-reading level book by the rise-and-fall method and demonstrate that both methods give identical reduced levels.

  • Calculate earthwork excavation volume for a trench of stated length, width and depth using the mid-section method, including the working-space allowance.

  • Take off brickwork and plaster quantities in cubic metres and square metres from a stated wall schedule, deducting openings correctly.

  • Prepare a rate analysis for one cubic metre of brickwork in cement mortar, listing material, labour and sundries with wastage percentages.

Your checkpoint

A complete quantity take-off for a described single-room load-bearing structure, ending in an abstract of cost with at least seven items, extension calculations, and a bar-bending-style steel schedule for the slab.

Week 7

Estimation, Costing and Quantity Take-off & Introduction to the Construction Industry, Sectors and Career Pathways

  • Compute reinforcement quantity in kilograms from a given bar bending schedule and apply the correct unit weight formula for each bar diameter.

  • Differentiate between preliminary estimate, detailed estimate, revised estimate and repair estimate, and state one real situation that calls for each.

  • Describe the main construction sectors, the typical employer types in each, and the entry-level roles available to an NSQF Senior Secondary pass-out.

  • Map three career pathways from site trainee to supervisor or entrepreneur, naming the certification or experience step required at each stage.

Your checkpoint

A one-page career pathway map showing three routes with entry role, progression steps and required certifications, plus a one-page abstract of cost for the week 6 structure cross-checked against the rate analysis.

Week 8

Communication, Employability and Entrepreneurial Skills & Occupational Safety, Health and Environment (OSHE) at Construction Sites

  • Draft a site progress report and a short email to a supplier using correct technical vocabulary, clarity and professional tone.

  • Deliver a two-minute spoken explanation of the safety controls for a working-at-height task, structured as hazard, control, check.

  • Outline the steps and documents needed to start a small construction contracting or repair business, including registration and basic costing.

  • Complete a timed full-syllabus mock test and review every incorrect answer against the source topic before the exam date.

Your checkpoint

A 90-minute timed mock test attempt scored and error-analysed by domain, a one-page professional CV with a covering note for a site trainee role, and a written two-minute script on working-at-height safety controls.

Milestones

Week 2: Can draw and label three masonry bonds from memory and write the full slab method statement without notes, correctly stating the M20 mix proportion and curing duration.

Week 4: Scores at least 80 percent on a self-made 25-question safety and materials quiz, and can complete a sieve-analysis fineness modulus calculation in under 15 minutes.

Week 6: Level book reduced by both height-of-instrument and rise-and-fall methods with matching results, and a seven-item abstract of cost produced without reference material.

Week 8: Mock test score at or above 70 percent overall with no single domain below 60 percent, and all errors logged with the corrected concept written out.