Odisha CHSE +2 Plumber General (VOC-ITV) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Plumbing Tools, Materials and Safety Practices & Water Supply Systems and Pipe Layout

  • List and describe the hand tools, cutting tools, threading tools and testing instruments used in plumbing, stating the correct use of each

  • Identify pipe materials (GI, CI, PVC, CPVC, HDPE, copper) and state one property and one typical application for each

  • Demonstrate and write down the safety rules for trenching, working at height, gas welding and handling of solvent cement

  • Sketch the layout of a direct and an indirect cold water supply system for a two-storey house and label the main components

Your checkpoint

A hand-written tool-and-material chart of at least 20 items with use and safety note, plus one labelled cold water supply layout sketch

Week 2

Water Supply Systems and Pipe Layout & Pipe Joining, Fabrication and Installation

  • Explain the working of overhead tank, sump, pump and distribution piping in a domestic water supply scheme

  • Calculate pipe sizes and estimate daily water demand for a household using standard per-capita figures

  • Describe the steps for cutting, reaming and threading GI pipe and for making a screwed joint with teflon tape or jute

  • Describe solvent cementing of PVC and brazing of copper joints with correct sequence of operations

Your checkpoint

A one-page worked calculation of water demand and pipe size for a 5-member household, plus a numbered procedure sheet for GI threading and PVC solvent jointing

Week 3

Sanitary Drainage and Sewerage Systems & Sanitary Fittings, Fixtures and Appliances

  • Distinguish soil pipe, waste pipe, vent pipe and rainwater pipe and state the function of each

  • Explain the principles of house drainage: gradient, self-cleansing velocity, one-pipe and two-pipe systems, and trap seals

  • Identify water closets, wash basins, sinks, urinals, floor traps and their standard connections and sizes

  • Describe the layout and ventilation requirements of a septic tank and a soak pit

Your checkpoint

A labelled cross-section drawing of a two-storey house drainage system showing soil, waste, vent and rainwater lines with pipe diameters and gradients

Week 4

Sanitary Drainage and Sewerage Systems & Sanitary Fittings, Fixtures and Appliances & Pipe Joining, Fabrication and Installation

  • Demonstrate the installation sequence for a WC, wash basin and sink including trap, waste connection and testing

  • Explain testing of drainage lines by water test and air test and state the acceptance criteria

  • Describe the correct method of laying underground sewer pipe including bedding, jointing and backfilling

  • Solve numerical problems on drain gradient and pipe fall over a given length

Your checkpoint

A written procedure for installing and testing one WC and one wash basin, with a solved gradient/fall numerical set of 5 problems

Week 5

Plumbing Repairs, Maintenance and Leak Detection & Pipe Joining, Fabrication and Installation

  • List common plumbing faults such as leaking joints, dripping taps, choked traps, noisy pipes and low pressure, with their probable causes

  • Describe leak detection methods including visual inspection, water meter test, dye test and pressure testing

  • Explain repair procedures for replacing a tap washer, a float valve, a trap and a damaged pipe section

  • Describe preventive maintenance schedules for domestic and institutional plumbing systems

Your checkpoint

A fault-cause-remedy table covering at least 12 common plumbing faults, plus a preventive maintenance checklist for a school building

Week 6

Drawing, Estimation and Costing & Plumbing Tools, Materials and Safety Practices

  • Read and interpret plumbing drawings using standard symbols for pipes, fittings, valves and fixtures

  • Prepare a material take-off list from a given plumbing layout drawing

  • Calculate quantities of pipe, fittings, solvent cement and labour for a small installation

  • Prepare a simple cost estimate with rate, quantity and amount columns and add overheads and profit

Your checkpoint

A complete cost estimate sheet with material take-off and abstract of cost for a two-storey residential plumbing installation

Week 7

Employability Skills, Entrepreneurship and Workplace Ethics & Practical Trade Work and Project Assessment

  • Describe the personal qualities, punctuality, discipline and teamwork expected in a plumbing workplace

  • Explain basic entrepreneurship steps: identifying a plumbing service opportunity, costing a job and quoting a price

  • State the importance of customer handling, warranty on work and workplace ethics

  • Plan and describe the sequence of a practical project such as installing a bathroom fixture set

Your checkpoint

A written project plan for a practical plumbing installation including tool list, material list, time schedule and a customer quotation

Week 8

Plumbing Tools, Materials and Safety Practices & Sanitary Fittings, Fixtures and Appliances & Water Supply Systems and Pipe Layout & Sanitary Drainage and Sewerage Systems & Pipe Joining, Fabrication and Installation & Plumbing Repairs, Maintenance and Leak Detection & Drawing, Estimation and Costing & Employability Skills, Entrepreneurship and Workplace Ethics & Practical Trade Work and Project Assessment

  • Revise all domains using the fault table, procedure sheets and estimate prepared in earlier weeks

  • Solve previous-style objective and short-answer questions under timed conditions

  • Practise viva-style answers on tools, fixtures, drainage and safety

  • Identify weak areas from practice results and re-study them

Your checkpoint

Two full timed mock papers scored and corrected, with a one-page list of weak topics and a revision note for each

Milestones

Week 2: Can state the use of at least 20 plumbing tools and correctly describe GI threading and PVC solvent jointing steps without notes

Week 4: Can draw and label a complete house drainage system and solve drain gradient problems with at least 80% accuracy

Week 6: Can prepare a material take-off and cost estimate from a plumbing layout drawing without reference

Week 8: Scores at least 70% in both timed mock papers and has a written revision note for every weak topic identified