CITS Electrician (Theory) · Keep the key ideas within reach.

Quick reference

Electrical Safety and Codes

  • Lockout/tagout requires isolating the energy source, verifying absence of voltage with a tester rated for the circuit, and applying a personal lock before work begins.

  • Arc flash boundary is the distance at which incident energy equals 1.2 cal/cm², the threshold for a second-degree burn on bare skin.

  • Approach boundaries: limited (shock protection only), restricted (qualified persons with PPE), and prohibited (no part of body may cross).

  • NFPA 70E requires an incident energy analysis or use of the tables; PPE category is selected from the calculated incident energy, not the voltage alone.

  • Ground-fault circuit protection trips at 4-6 mA for personnel protection; equipment ground-fault protection for equipment operates at higher thresholds (often 30 mA).

  • A live-dead-live test sequence confirms tester function before and after verifying de-energization; a single test is insufficient evidence.

  • Minimum approach distance to exposed live parts increases with voltage class; always consult the applicable table rather than estimating.

  • Working alone on energized equipment above 50 V is prohibited in most jurisdictions; a second qualified person or standby is required.

Quick reference

Electrical Theory and Fundamentals

  • Ohm's law: V = I × R; power: P = V × I = I²R = V²/R.

  • Series circuit: current is common; resistances add; voltage divides in proportion to resistance.

  • Parallel circuit: voltage is common; conductances add; total resistance is always less than the smallest branch resistance.

  • Three-phase power: P = √3 × V_L × I_L × power factor for a balanced load.

  • Impedance Z = √(R² + X²); reactance X_L = 2πfL, X_C = 1/(2πfC).

  • Power factor = real power / apparent power; a lagging power factor indicates inductive load.

  • Kirchhoff's laws: sum of currents at a node is zero; sum of voltages around a closed loop is zero.

  • Transformer turns ratio: V₁/V₂ = N₁/N₂ = I₂/I₁; power is essentially conserved (ignoring losses).

  • Conductor resistance is proportional to length and inversely proportional to cross-sectional area; resistivity rises with temperature for copper and aluminum.

Quick reference

Wiring Methods and Materials

  • Conductor ampacity depends on insulation temperature rating, ambient temperature, and number of current-carrying conductors bundled together.

  • NM-B cable is permitted in dry interior locations but not in wet locations, embedded in masonry, or where subject to physical damage.

  • Rigid metal conduit provides a equipment grounding path and physical protection; EMT requires listed fittings and cannot be used where severe corrosion exists.

  • Box fill is calculated by counting each conductor, each device yoke, and each equipment grounding conductor per the applicable volume allowance table.

  • Cable and raceway support intervals and securing distances are specified per wiring method; support must be within a set distance of boxes.

  • Conductor color coding: grounded conductor white or gray, equipment grounding conductor green or bare, ungrounded conductors other than white, gray, or green.

  • Aluminum conductors require terminals listed for aluminum; small-gauge aluminum branch conductors are restricted in many applications.

  • Conduit fill limits keep total conductor cross-sectional area to a percentage of conduit interior area based on the number of conductors.

Quick reference

Installation and Maintenance

  • Terminations must be torqued to the manufacturer's specified value; loose lugs are a leading cause of overheating and failure.

  • Receptacles in wet or damp locations require listed covers and GFCI protection where specified.

  • Motor overload protection is sized to the motor's service factor and nameplate current, not the branch-circuit overcurrent device.

  • Panelboard working clearance requires a minimum depth of 36 inches in front of the equipment, with width and height per the code table.

  • Bending radius of a raceway must not be less than the minimum specified multiple of the conduit diameter; kinks reduce ampacity and damage insulation.

  • Periodic thermographic inspection identifies loose connections and unbalanced loading before failure.

  • Maintenance records should log test results, torque values, and replacement parts to support future troubleshooting and compliance audits.

Quick reference

Electrical Systems and Equipment

  • A transformer's kVA rating is independent of voltage ratio; primary and secondary currents are set by the kVA and the respective voltage.

  • Motor nameplate data includes voltage, full-load amps, service factor, insulation class, and duty rating; all affect protection sizing.

  • A contactor switches load current but provides no overload protection; an overload relay provides protection but does not switch the load.

  • Star-delta starting reduces starting current to one-third of direct-on-line starting but reduces starting torque correspondingly.

  • VFDs control motor speed by varying frequency and voltage; they can induce shaft currents and require attention to cable shielding and grounding.

  • UPS systems are rated in VA and kW; the kW rating reflects the real power the inverter can supply at a given power factor.

  • Switchgear interrupting rating must equal or exceed the available fault current at the point of installation.

Quick reference

Testing, Troubleshooting, and Diagnostics

  • Insulation resistance testing applies a DC voltage and measures resistance; readings below the manufacturer's minimum indicate moisture, contamination, or degradation.

  • Continuity testing must be performed on a de-energized circuit; a live circuit will damage the meter and endanger the tester.

  • A clamp meter measures current by sensing the magnetic field; it must encircle only the conductor of interest, not both supply and return.

  • Voltage drop testing under load reveals high-resistance connections that a no-load voltage reading will miss.

  • Phase rotation meters confirm correct sequence before connecting three-phase motors; reversed rotation can damage driven equipment.

  • Earth ground resistance is measured with a fall-of-potential or clamp-on method; a single rod often exceeds target resistance and may require multiple rods.

  • Intermittent faults are best isolated by monitoring and logging while the equipment operates under normal load conditions.

Quick reference

Regulations and Standards

  • The National Electrical Code (NFPA 70) is the model code adopted with local amendments; the adopted edition governs the installation.

  • NFPA 70E addresses electrical safety in the workplace, including arc flash and shock risk assessment.

  • IEEE C2 (National Electrical Safety Code) governs utility supply lines and communications, not customer premises wiring.

  • Listed and labeled equipment must be installed per its listing and the manufacturer's instructions; field modification may void the listing.

  • Permits and inspections are required for most new work and alterations; concealed work must be inspected before covering.

  • Working clearance, box fill, and conductor ampacity tables are code requirements, not recommendations; violations create liability.

  • Local authorities having jurisdiction may adopt stricter amendments than the model code; always verify the locally enforced edition.

Quick reference

Professional Practice and Documentation

  • As-built drawings must reflect actual installed conditions, including routing changes, added circuits, and revised panel schedules.

  • Panel schedules record circuit number, breaker rating, conductor size, and load description; they must be updated whenever circuits change.

  • A method statement describes the sequence of work, isolation points, and hold points before energization.

  • Test certificates should record instrument identification, calibration date, ambient conditions, and measured values.

  • Permit-to-work systems require sign-off at isolation, work completion, and restoration of supply.

  • Change orders document scope changes, cost impact, and approval before the work proceeds.

  • Handover documentation includes drawings, test results, equipment manuals, and warranties; incomplete records delay acceptance.