ITI/NCVT Mason Building Constructor (AITT Theory) flashcards
ITI/NCVT Mason Building Constructor (AITT Theory) · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Safe bearing capacity
- The maximum pressure a soil can carry without unacceptable settlement or shear failure, expressed in kN/m2; good soil is about 150-250 kN/m2, soft clay much less.
- Slump test
- A workability test in which fresh concrete is placed in a standard cone, the cone is lifted and the vertical drop of the concrete is measured in millimetres.
- English bond
- A masonry bond with alternating header and stretcher courses, giving the strongest traditional bond with no continuous vertical joints through the wall.
- Flemish bond
- A bond in which each course alternates a stretcher and a header, producing a decorative face pattern that is weaker than English bond in compression.
- Queen closer
- A brick cut lengthwise into two equal halves, used next to a quoin header to keep the bond pattern correct and avoid a straight vertical joint.
- DPC
- Damp-proof course: a continuous impervious layer at plinth level, at least 150 mm above ground, lapped 100 mm at joints to stop rising damp.
- Reduced level
- The height of a point relative to a datum, found on site as height of instrument minus the staff reading (foresight) taken on that point.
- Height of instrument
- The reduced level of the line of sight of a levelling instrument, calculated as the known reduced level plus the backsight staff reading.
- 3-4-5 method
- A setting-out technique that produces a right angle by forming a triangle with sides in the ratio 3:4:5, or any multiple of those lengths.
- Wall tie
- A metal tie built into both leaves of a cavity wall at about 450 mm vertical and 900 mm horizontal spacing, sloping outward to drain water.
- AAC block
- Autoclaved aerated concrete block of about 550-650 kg/m3 density, laid with 2-3 mm thin-bed adhesive and valued for light weight and insulation.
- Toothing
- The stepped end of a brick wall left for future bonding, formed by leaving one-quarter brick projecting on alternate courses.
- Efflorescence
- A white salt deposit on masonry caused by soluble salts migrating to the surface with water and crystallising as the water evaporates.
- Repointing
- Raking out defective mortar joints to 15-20 mm depth, cleaning and wetting them, then refilling with fresh mortar weaker than the masonry.
- Curing
- Keeping concrete or plaster moist for a set period, at least 7 days for ordinary Portland cement, so that cement hydration continues and strength develops.
- Water-cement ratio
- The mass of water divided by the mass of cement in a mix; typically 0.45-0.55 for concrete, higher ratios reduce strength and durability.
- Mortar grade M
- A high-strength cement mortar of about 1:3 cement to sand by volume, giving roughly 10 N/mm2 cube strength at 28 days.
- Water retentivity
- The ability of mortar to hold its mixing water against suction from absorbent masonry units; low retention causes poor bond and weak joints.
- Rise and going
- The vertical height of a stair step (rise, typically 150-190 mm) and its horizontal depth (going or tread, typically 250-300 mm).
- Rise of an arch
- The vertical distance from the springing line to the crown; a semicircular arch has a rise equal to half its span.
- Lintel bearing
- The length of a lintel that rests on the masonry each side of an opening, normally 100-150 mm, to transfer the wall load safely.
- Plinth area estimate
- A preliminary cost estimate found by multiplying the plinth area of the building by a standard rate per square metre for that class of construction.
- Dry volume factor
- The multiplier of about 1.30-1.33 applied to the wet volume of mortar to allow for bulking of sand and voids between particles.
- Brick count per cubic metre
- About 500 standard modular bricks (190 x 90 x 90 mm) make one cubic metre of brickwork when 10 mm mortar joints are included.
- Fall protection threshold
- Guardrails, nets or harnesses are required for work at heights of 1.8 m or more; a guardrail has a top rail at 1.0 m and a toe board.
- Permit to work
- A written authorisation required before high-risk tasks such as hot work, confined-space entry or work at height, listing hazards and controls.
- Tool-box talk
- A short briefing held before work begins, covering the task sequence, hazards, control measures and any changes since the last briefing.
- Vitrified tile
- A tile with water absorption below 0.5 percent, very dense and frost resistant, requiring a suitable adhesive rather than a thick mortar bed.
- Skirting
- The finishing strip at the base of an internal wall, typically 100-150 mm high, protecting the plaster and covering the floor junction.
- Slenderness ratio
- The effective height or length of a wall divided by its thickness; for unreinforced masonry the limit is about 27.
- Buttress
- An external pier built against a wall, often with a battered face, to resist lateral thrust from roofs, arches or retained earth.
- Seasoning of timber
- Drying timber to a moisture content of about 12-15 percent so that it shrinks and warps before use, not after installation in shuttering or joinery.
- Spirit level
- A tool with a sealed bubble vial, typically 600 mm long, whose bubble centred between the lines shows that a surface is horizontal or vertical.