ITI/NCVT Mason Building Constructor (AITT Theory) study materials
ITI/NCVT Mason Building Constructor (AITT Theory) study resources

ITI/NCVT Mason Building Constructor (AITT Theory) study plan

ITI/NCVT Mason Building Constructor (AITT Theory) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Masonry Bonds, Brick and Block Work & Materials, Tools and Equipment for Masonry

  • Distinguish English, Flemish, stretcher, header and rat-trap bonds by sketching the elevation of a one-brick wall in each and labelling every brick type.

  • Calculate the number of bricks and the mortar volume needed for a 3 m × 3 m half-brick wall in stretcher bond, allowing 10 mm joints and 5% wastage.

  • Identify and state the correct use of at least ten masonry hand tools and five masonry equipment items, matching each to the task it performs.

  • Explain how brick dimensions, frog position, compressive strength class and water absorption affect the choice of bond and mortar.

Your checkpoint

A hand-drawn bond sheet with five labelled bond elevations plus a one-page brick-and-mortar quantity calculation showing all steps.

Week 2

Masonry Bonds, Brick and Block Work & Mortar, Concrete and Plastering

  • Lay out and describe the sequence for constructing a one-brick corner in English bond, including queen closer placement and line-and-level checks.

  • Compare 1:3, 1:4 and 1:6 cement-sand mortar mixes and justify which to use for load-bearing brickwork, plastering and pointing.

  • Compute the dry-material requirement for 1 m³ of 1:6 cement mortar, including the bulking allowance for sand.

  • Describe the correct procedure for mixing mortar by machine and by hand, and state the working life of a cement mortar mix.

  • Explain blockwork practice: block dimensions, hollow versus solid units, mortar joint thickness and the need for movement joints.

Your checkpoint

A written method statement for building a one-brick English bond corner with a companion mortar mix calculation for 1 m³.

Week 3

Drawing, Setting Out and Levelling & Foundations, Walls and Structural Elements

  • Convert a simple plan and section drawing into setting-out lines for a rectangular room, stating the 3-4-5 method for a right angle.

  • Describe how to transfer a datum level using a water level and a dumpy level, and record readings in a level book.

  • Distinguish shallow and deep foundations and state the soil and load conditions that decide between them.

  • Explain the purpose and construction of a damp-proof course, damp-proof membrane and a plinth in a load-bearing wall.

  • Identify the causes of settlement cracks versus structural cracks in masonry walls from their pattern and location.

Your checkpoint

A setting-out and levelling exercise sheet: a sketched plan with centre lines, a completed level-book table and a short justification of the chosen foundation type.

Week 4

Trade Safety, Health and Environment & Maintenance, Repair and Waterproofing

  • List the personal protective equipment required for mixing, cutting, scaffolding and demolition work, and state the hazard each item controls.

  • Explain safe erection, inspection and use of a mason's scaffold, including guard rails, toe boards and the maximum working platform loading.

  • Describe first-aid and emergency response steps for silica dust exposure, cement burns, eye injury and a fall from height.

  • Diagnose five common building defects - rising damp, efflorescence, plaster debonding, cracked render and leaking roof flashing - and specify a repair method for each.

  • Describe the correct application of a waterproofing treatment to a wet area, including surface preparation, coat sequence and curing.

Your checkpoint

A safety and repair reference card covering PPE, scaffold checks, four emergency responses and five defect-remedy pairs.

Week 5

Mortar, Concrete and Plastering & Flooring, Tiling and Finishing

  • Specify concrete grades for a foundation, a slab and a lintel, and state the water-cement ratio and slump appropriate to each.

  • Describe batching, placing, compacting, curing and formwork removal for a small concrete slab, including curing duration.

  • Explain plastering sequence for an internal wall: preparation, mortar choice, thickness, dubbing out, floating and finishing.

  • Compare ceramic, vitrified and natural stone tiles and state the adhesive and bedding appropriate to each surface.

  • Describe laying a cement concrete floor and a tile floor, including screed level, joint width, grouting and checking for hollow spots.

Your checkpoint

A two-part specification sheet: one concrete slab specification and one floor-tiling specification, each with materials, sequence and quality checks.

Week 6

Arches, Lintels, Stairs and Roofing & Materials, Tools and Equipment for Masonry

  • Classify arches by shape and material, and label the voussoir, keystone, springing line, skewback and abutment on a sketch.

  • Explain how centering is erected, struck and reused for a semicircular brick arch, and state the minimum striking time.

  • Describe the construction of a reinforced concrete lintel and a brick lintel, including bearing length and when each is chosen.

  • Calculate riser and tread for a straight flight given the floor-to-floor height, applying the 2R + T rule.

  • Describe a simple pitched roof in brick masonry construction: wall plate, purlin, rafter, ridge and gable coping.

Your checkpoint

An annotated arch and stair drawing set with one worked stair calculation and a labelled roof section.

Week 7

Estimation, Measurement and Costing & Employability Skills and Workplace Practice

  • Take off quantities from a simple plan for brickwork, plaster, concrete and tiling, and present them in a measurement sheet.

  • Prepare a rate analysis for 1 m³ of brickwork in cement mortar, including labour, material and wastage.

  • Explain the difference between centre-line, long-wall-and-short-wall and crossing methods of estimation and choose the right one for a given plan.

  • Describe workplace communication, reporting and record-keeping duties of a mason on a site, including tool-box talks and material indents.

  • Explain teamwork, punctuality, safe housekeeping and the reporting chain for a hazard or near miss.

Your checkpoint

A complete estimate for a single-room structure: measurement sheet, rate analysis and abstract of cost, plus a one-page site-conduct note.

Week 8

Masonry Bonds, Brick and Block Work & Mortar, Concrete and Plastering & Estimation, Measurement and Costing

  • Complete a timed mixed-topic question set covering bonds, mortar and estimation, and score at least 70%.

  • Re-derive the weakest three calculations from earlier weeks without notes to confirm retention.

  • Summarise each of the eleven domains in five bullet points of the facts most likely to be tested.

  • Review every flagged error from weeks 1–7 and restate the correct method in one sentence each.

Your checkpoint

A timed mock-test score sheet with a corrected-error log and an eleven-domain revision summary.

Milestones

Week 2: Can sketch five brick bonds and a one-brick corner, and calculate bricks, mortar and dry materials for a given wall without referring to notes.

Week 4: Can state PPE for four masonry operations, list scaffold inspection points, and name a repair method for five common defects.

Week 6: Can label an arch fully, calculate stair risers and treads from a floor height, and justify a lintel choice.

Week 8: Scores at least 70% on the timed mixed-topic set and has a written correction for every error made across the plan.