ITI/NCVT Mason Building Constructor (AITT Theory) study plan
ITI/NCVT Mason Building Constructor (AITT Theory) · Give each week a clear focus.
8 weeks · About 6 hours per week
Masonry Bonds, Brick and Block Work & Materials, Tools and Equipment for Masonry
Distinguish English, Flemish, stretcher, header and rat-trap bonds by sketching the elevation of a one-brick wall in each and labelling every brick type.
Calculate the number of bricks and the mortar volume needed for a 3 m × 3 m half-brick wall in stretcher bond, allowing 10 mm joints and 5% wastage.
Identify and state the correct use of at least ten masonry hand tools and five masonry equipment items, matching each to the task it performs.
Explain how brick dimensions, frog position, compressive strength class and water absorption affect the choice of bond and mortar.
Your checkpoint
A hand-drawn bond sheet with five labelled bond elevations plus a one-page brick-and-mortar quantity calculation showing all steps.
Masonry Bonds, Brick and Block Work & Mortar, Concrete and Plastering
Lay out and describe the sequence for constructing a one-brick corner in English bond, including queen closer placement and line-and-level checks.
Compare 1:3, 1:4 and 1:6 cement-sand mortar mixes and justify which to use for load-bearing brickwork, plastering and pointing.
Compute the dry-material requirement for 1 m³ of 1:6 cement mortar, including the bulking allowance for sand.
Describe the correct procedure for mixing mortar by machine and by hand, and state the working life of a cement mortar mix.
Explain blockwork practice: block dimensions, hollow versus solid units, mortar joint thickness and the need for movement joints.
Your checkpoint
A written method statement for building a one-brick English bond corner with a companion mortar mix calculation for 1 m³.
Drawing, Setting Out and Levelling & Foundations, Walls and Structural Elements
Convert a simple plan and section drawing into setting-out lines for a rectangular room, stating the 3-4-5 method for a right angle.
Describe how to transfer a datum level using a water level and a dumpy level, and record readings in a level book.
Distinguish shallow and deep foundations and state the soil and load conditions that decide between them.
Explain the purpose and construction of a damp-proof course, damp-proof membrane and a plinth in a load-bearing wall.
Identify the causes of settlement cracks versus structural cracks in masonry walls from their pattern and location.
Your checkpoint
A setting-out and levelling exercise sheet: a sketched plan with centre lines, a completed level-book table and a short justification of the chosen foundation type.
Trade Safety, Health and Environment & Maintenance, Repair and Waterproofing
List the personal protective equipment required for mixing, cutting, scaffolding and demolition work, and state the hazard each item controls.
Explain safe erection, inspection and use of a mason's scaffold, including guard rails, toe boards and the maximum working platform loading.
Describe first-aid and emergency response steps for silica dust exposure, cement burns, eye injury and a fall from height.
Diagnose five common building defects - rising damp, efflorescence, plaster debonding, cracked render and leaking roof flashing - and specify a repair method for each.
Describe the correct application of a waterproofing treatment to a wet area, including surface preparation, coat sequence and curing.
Your checkpoint
A safety and repair reference card covering PPE, scaffold checks, four emergency responses and five defect-remedy pairs.
Mortar, Concrete and Plastering & Flooring, Tiling and Finishing
Specify concrete grades for a foundation, a slab and a lintel, and state the water-cement ratio and slump appropriate to each.
Describe batching, placing, compacting, curing and formwork removal for a small concrete slab, including curing duration.
Explain plastering sequence for an internal wall: preparation, mortar choice, thickness, dubbing out, floating and finishing.
Compare ceramic, vitrified and natural stone tiles and state the adhesive and bedding appropriate to each surface.
Describe laying a cement concrete floor and a tile floor, including screed level, joint width, grouting and checking for hollow spots.
Your checkpoint
A two-part specification sheet: one concrete slab specification and one floor-tiling specification, each with materials, sequence and quality checks.
Arches, Lintels, Stairs and Roofing & Materials, Tools and Equipment for Masonry
Classify arches by shape and material, and label the voussoir, keystone, springing line, skewback and abutment on a sketch.
Explain how centering is erected, struck and reused for a semicircular brick arch, and state the minimum striking time.
Describe the construction of a reinforced concrete lintel and a brick lintel, including bearing length and when each is chosen.
Calculate riser and tread for a straight flight given the floor-to-floor height, applying the 2R + T rule.
Describe a simple pitched roof in brick masonry construction: wall plate, purlin, rafter, ridge and gable coping.
Your checkpoint
An annotated arch and stair drawing set with one worked stair calculation and a labelled roof section.
Estimation, Measurement and Costing & Employability Skills and Workplace Practice
Take off quantities from a simple plan for brickwork, plaster, concrete and tiling, and present them in a measurement sheet.
Prepare a rate analysis for 1 m³ of brickwork in cement mortar, including labour, material and wastage.
Explain the difference between centre-line, long-wall-and-short-wall and crossing methods of estimation and choose the right one for a given plan.
Describe workplace communication, reporting and record-keeping duties of a mason on a site, including tool-box talks and material indents.
Explain teamwork, punctuality, safe housekeeping and the reporting chain for a hazard or near miss.
Your checkpoint
A complete estimate for a single-room structure: measurement sheet, rate analysis and abstract of cost, plus a one-page site-conduct note.
Masonry Bonds, Brick and Block Work & Mortar, Concrete and Plastering & Estimation, Measurement and Costing
Complete a timed mixed-topic question set covering bonds, mortar and estimation, and score at least 70%.
Re-derive the weakest three calculations from earlier weeks without notes to confirm retention.
Summarise each of the eleven domains in five bullet points of the facts most likely to be tested.
Review every flagged error from weeks 1–7 and restate the correct method in one sentence each.
Your checkpoint
A timed mock-test score sheet with a corrected-error log and an eleven-domain revision summary.
Milestones
Week 2: Can sketch five brick bonds and a one-brick corner, and calculate bricks, mortar and dry materials for a given wall without referring to notes.
Week 4: Can state PPE for four masonry operations, list scaffold inspection points, and name a repair method for five common defects.
Week 6: Can label an arch fully, calculate stair risers and treads from a floor height, and justify a lintel choice.
Week 8: Scores at least 70% on the timed mixed-topic set and has a written correction for every error made across the plan.