Drawing, Setting Out and Levelling tests reading plans, elevations and sections, using scales, transferring dimensions to ground, establishing a datum and checking levels with a dumpy level or total station.

Core rules

  • A plan is a horizontal view; an elevation is a vertical face; a section is a cut view. Check the stated scale before scaling any dimension.
  • Set out from a fixed benchmark or datum, not from a temporary peg that may move.
  • For a rectangular building, check both diagonals; equal diagonals confirm square corners.
  • The 3-4-5 method gives a right angle: 3 m one way, 4 m the other, and 5 m diagonally.
  • With a dumpy level, take a backsight on a known benchmark, calculate height of instrument, then take foresights; reduce levels by height-of-instrument or rise-and-fall.

Worked example

Set out a 6 m × 8 m rectangle. The diagonal is √(6² + 8²) = √100 = 10 m. Mark one corner, measure 6 m along one axis and 8 m along the other, then adjust the pegs until both diagonals read 10.00 m. This is the 3-4-5 triangle multiplied by 2. Check the diagonals again after fixing the profiles.

Traps that cost marks

Checking only one diagonal, measuring from a moving peg, or misreading the staff by one metre are common. Do not scale a drawing when a written dimension is given; written dimensions govern.

Key points

  • Equal diagonals confirm a square rectangle.
  • 3-4-5 gives a right angle; 6-8-10 is the same triangle doubled.
  • Set out from a stable benchmark, not a temporary peg.
  • Height of instrument = reduced level of benchmark + backsight.
  • Written dimensions override scaled measurements.