Trade Safety, Occupational Health and Environment

  • Guillotine shear safety: never place hands within 100 mm of the blade; use a push stick and keep the fixed guard adjusted to within 6 mm of the workpiece.

  • Hand tools: chisels and punches must be mushroom-free; dress the head at 60-70 degrees and discard if the crack extends into the body.

  • Fire classes for sheet metal shops: Class A (paper, wood), Class B (oil, grease), Class C (electrical), Class D (magnesium, aluminium powder). Water is forbidden on B, C and D.

  • Arc welding eye protection: shade 10-13 for SMAW above 100 A; shade 3-4 for gas cutting goggles; shade 5-8 for brazing and light gas welding.

  • Lifting rule: keep the load close to the body, back straight, knees bent; two-person lift above 25 kg per person is the usual shop limit.

  • Compressed air for cleaning must not exceed 2 bar (30 psi) and must carry a chip guard; never clean skin or clothing with air.

  • Hearing: 85 dB(A) for an 8-hour day is the action level; noise doubles with every 3 dB increase, so 88 dB halves the permitted exposure time.

  • Solvent and paint storage: flash point below 23 degrees C means highly flammable; store in a closed metal cabinet, bonded and earthed, away from grinding sparks.

Quick reference

Engineering Drawing

  • First-angle projection (ISO/IS 696): the view placed below the front view is the top view; the view placed on the right of the front view is the left-side view.

  • Third-angle projection (ASME): the top view sits above the front view and the right-side view sits to the right; the symbol shows a truncated cone with the small end toward the observer.

  • Line conventions: continuous thick for visible outlines, short-dashed for hidden edges, chain thin for centre lines and pitch circles, continuous thin for dimension and projection lines.

  • Scale: representative fraction = drawing length / actual length; scale 1:5 means 100 mm on paper equals 500 mm actual.

  • Dimensioning rules: dimensions are given in true size regardless of scale; never dimension a feature twice; avoid dimensioning to hidden lines.

  • Section views: hatching lines at 45 degrees, spacing 2-4 mm; adjacent parts are hatched in opposite directions; shafts and bolts are not sectioned longitudinally.

  • Tolerance notation: 50 H7/g6 means hole basis with hole tolerance H7 and shaft tolerance g6; clearance exists when the shaft upper limit is below the hole lower limit.

  • Geometric symbols: flatness is a parallelogram, perpendicularity is an inverted T, concentricity is two concentric circles, and surface roughness Ra is written with the tick symbol.

Quick reference

Sketching and Reading of Sheet Metal Drawings

  • Developed (flat pattern) views are drawn as continuous thin chain lines or marked 'FLAT PATTERN' and are never dimensioned as if they were formed parts.

  • Bend lines on a flat pattern are shown as chain lines; the bend allowance zone is bounded by the bend tangent lines.

  • Bend direction is read from the note 'BEND UP' or 'BEND DOWN' relative to the visible face; a dashed bend line indicates the bend is away from the viewer.

  • Sheet metal drawings usually specify material, thickness (t), inside bend radius (R) and bend angle; the neutral axis is taken at 0.33 t to 0.5 t from the inside face depending on the R/t ratio.

  • Hems, joggles and offsets are shown with a detail view at 2:1 or larger because the feature is smaller than the sheet thickness scale.

  • Sheet metal drawing callouts: '3 x 1200 x 2400 MS' means 3 mm thick mild steel sheet, 1200 mm wide, 2400 mm long.

  • Rivet and fastener symbols: a solid circle with a cross indicates a rivet on the far side; a filled circle indicates a rivet on the near side.

  • Sketching proportion: use a soft pencil (2B), keep construction lines light, and mark the datum edge first so all dimensions originate from one reference.

Quick reference

Materials and Hand Tools for Sheet Metal Work

  • Mild steel sheet: density 7850 kg/m3, tensile strength 350-450 N/mm2, easily welded and formed; galvanised sheet must not be welded without removing the zinc coating first (zinc fume hazard).

  • Aluminium: density about 2700 kg/m3; 1050 and 1100 grades are soft and highly formable; 2024 and 7075 are strong but crack when bent sharply and need annealing.

  • Copper: density 8900 kg/m3, excellent ductility; anneal at 400-650 degrees C and quench in water; work-hardens rapidly and must be re-annealed between forming stages.

  • Stainless steel 304: work-hardens strongly, low thermal conductivity causes heat build-up; use sharp tools with small clearance and slow cutting speeds.

  • Tinplate: mild steel coated with tin; the coating is measured in g/m2 per side; solder joints must use non-corrosive resin flux.

  • Snips: straight (aviation) snips for straight cuts, curved snips for circles; the colour code is generally left-cut green, right-cut red, straight yellow.

  • Stakes: a hatchet stake for sharp bends, a blowhorn stake for tapering work, a beakhorn stake for curves, a creasing stake for seams.

  • Hammers: a ball-peen hammer for riveting and chipping, a setting hammer for lock seams, a stretching hammer with a crowned face for planishing.

Quick reference

Marking, Measuring and Layout Development

  • Steel rule is read to 0.5 mm; vernier calliper to 0.02 mm; micrometer to 0.01 mm; a try square checks 90 degrees and a bevel protractor reads to 1 minute of arc.

  • Dividers transfer and step off equal distances; trammels are used for radii above about 150 mm; hermaphrodite callipers transfer internal and external sizes.

  • Scribing: use a scriber on bare metal, a fine-pointed pencil on coated or soft metal; a centre punch mark is made before drilling to prevent wander.

  • Allowance rules: add bend allowance at each bend, add 1-2 mm per edge for trimming, and never mark on a surface that will be visible after forming.

  • Circumference development of a cylinder: L = pi x D, where D is the mean diameter (outside diameter minus t for outside dimensions).

  • True length is found by rotating an inclined line to parallel the reference plane; the auxiliary view gives the true shape of an inclined face.

  • Layout datum: choose one straight edge as the reference, mark all dimensions from it, and check the diagonal of a rectangle to confirm squareness.

  • Centre of a circle by chords: draw two chords, bisect each with perpendicular bisectors; the intersection is the centre.

Quick reference

Cutting, Shearing and Hand Forming Operations

  • Guillotine shear clearance is about 5-8% of sheet thickness for mild steel and 3-5% for aluminium; excessive clearance causes burrs and roll-over.

  • Shearing force F = L x t x shear strength; for mild steel take shear strength as about 0.8 of tensile strength (roughly 300 N/mm2).

  • Blade rake angle on a guillotine is 1-3 degrees; the rake reduces peak force but introduces a slight bow in narrow strips.

  • Hand forming: stretching thins the metal and is done with a cross-peen hammer on a sandbag; shrinking thickens it and requires a shrinking hammer or a tuck fork.

  • Bending over a stake: keep the work flat against the stake face, strike with a mallet for soft metals and a hammer for steel, and move the work progressively along the bend line.

  • Cutting a circle by hand: drill a pilot hole, cut with curved snips clockwise, keep the waste side to the left, and file the edge after cutting.

  • Nibbling and filing: file with a smooth-cut file for finishing; draw-file with chalk to prevent pinning; keep the file moving in one direction only.

  • Deburring is mandatory after shearing; a burr left on a cut edge is a cut hazard and a stress raiser in a formed part.

Quick reference

Edges, Seams, Joints and Fastening

  • Wire edge (beaded edge): turn 2-3 mm of the edge, insert a wire of the required diameter, and hammer-roll the metal over the wire to lock it.

  • Single seam: turn each edge in opposite directions by 6-10 mm, interlock, and flatten; a double seam folds the interlocked seam once more for a gas-tight joint.

  • Grooved seam: interlock the turned edges over a mandrel and indent with a grooving tool at 5-10 mm pitch to lock the joint.

  • Lock seam allowance: for a single seam, add 2.5 t to each edge (t = thickness); for a double seam, add about 4 t in total.

  • Pittsburgh lock: a proprietary interlocking seam used for ductwork; the corner is folded and hammered flat to make an air-tight joint.

  • Riveted joint types: lap joint, butt joint with single or double strap; pitch is the centre distance between adjacent rivets and must not exceed 3 d for tight joints.

  • Rivet diameter rule: d = 1.2 x square root of t for sheet metal work, where t is the sheet thickness in mm; the hole is drilled 0.1-0.2 mm larger than the rivet.

  • Self-tapping screws and blind rivets are used where only one side is accessible; blind rivet grip range must cover the total material thickness.

Quick reference

Bending, Folding, Rolling and Press Operations

  • Bend allowance BA = pi x (R + K x t) x A / 180, where A is the bend angle in degrees, R is the inside radius, t the thickness and K the neutral-axis factor (0.33 for R/t < 1, 0.5 for R/t > 3).

  • Bend deduction = 2 x outside setback minus bend allowance; outside setback OSSB = (R + t) x tan(A/2).

  • Minimum bend radius: about 1 t for soft mild steel, 0.5 t for annealed aluminium, 1-2 t for half-hard aluminium, 2-3 t for 304 stainless steel.

  • Springback increases with the R/t ratio and with yield strength; compensate by over-bending 2-8 degrees or by coining the bend.

  • Roll forming: the roll gap equals the sheet thickness; the roll radius must be at least 3 t to avoid cracking; slip rolls are used for cylinders and cones.

  • Press brake: V-die opening should be 6-12 t; the required force per metre is approximately (1.42 x tensile strength x t squared) / V for air bending.

  • Folding: a folding bar and a folder are used for straight edges; the minimum flange length is about 4 t plus the inside radius to prevent the punch from slipping off.

  • Joggle (offset) is formed to allow two sheets to overlap flush; the joggle depth equals the sheet thickness plus 0.2 mm clearance.

Quick reference

Pattern Development and Surface Layout

  • Parallel line development applies to prisms and cylinders: divide the girth into equal parts, project each division to the elevation, and lay out the stretch-out equal to the girth.

  • Radial line development applies to cones and pyramids: find the true slant height, draw an arc of radius equal to the slant height, and set the arc length equal to the base circumference.

  • Triangulation applies to oblique and transition pieces: divide the surface into triangles, find the true length of each side by auxiliary views, and build the pattern triangle by triangle.

  • Cylinder development: stretch-out = pi x D; for a truncated cylinder, project each element length from the elevation to the stretch-out.

  • Cone development: sector angle theta = 360 x R / L, where R is the base radius and L is the slant height; slant height L = square root of (h squared + R squared).

  • Square-to-round transition: divide the round into 12 equal parts, triangulate between the four corners of the square and the 12 points, and add a seam allowance of 10-15 mm.

  • Frustum of a cone: develop the full cone, then subtract the small cone; the pattern is an annular sector whose widths equal the true slant length of the frustum.

  • Pattern allowances: add seam allowance (10-15 mm), notch allowance for corners, and wire-edge allowance of 2.5 d where a wire is to be inserted.

Quick reference

Welding, Brazing, Soldering and Riveting for Sheet Metal

  • SMAW polarity: DCEN (straight polarity) gives deeper penetration and is used for thicker sheet; DCEP (reverse polarity) gives shallower penetration and better cleaning action.

  • Sheet metal arc welding uses low current (60-110 A for 1.5-2 mm sheet) and a short arc; excessive current causes burn-through on thin sheet.

  • GTAW (TIG) with DCEN is preferred for thin stainless steel and aluminium (aluminium needs AC to break the oxide film); use a thoriated tungsten electrode ground to a point.

  • Oxy-acetylene flame types: neutral (1:1 oxygen to acetylene) for steel, oxidising for brass, carburising for aluminium and for case-hardening.

  • Brazing filler melts above 450 degrees C but below the parent metal melting point; use a flux and a capillary gap of 0.05-0.2 mm; silver solder (BCuP, BAg) is common for copper and brass.

  • Soldering: soft solder melts below 450 degrees C (60/40 tin-lead melts at 183 degrees C); use zinc chloride flux for steel, resin flux for electrical work, and never use acid flux on electronics.

  • Riveting: the rivet shank length must equal the total plate thickness plus 1.5 d for a snap head; the hole is drilled, not punched, for tight joints to avoid cracking.

  • Rivet head types: snap (universal) head for general work, countersunk head for flush surfaces, pan head for light sheet; the tail is formed with a rivet set and a snap.

Quick reference

Machines, Equipment and Power Tools

  • Guillotine shear: rated by maximum thickness and length; the hold-down must clamp the sheet before the blade descends; the back gauge sets the cut width.

  • Press brake: tonnage per metre is the limiting factor; the ram stroke, die opening and bend length determine the maximum bendable thickness.

  • Slip roll (pyramid roll): three rolls, the top roll is adjustable for thickness; the minimum rolling diameter is approximately the top roll diameter plus 3 t.

  • Power shears and nibblers: the nibbler cuts at about 1-2 m/min and needs a starting hole of at least the punch diameter; the punch and die clearance is 5-10% of thickness.

  • Hand shear (aviation snip) versus powered: powered tools require the guard in place, the workpiece clamped, and no gloves near rotating parts.

  • Drilling: cutting speed for mild steel with HSS drill is 25-30 m/min; feed 0.05-0.15 mm per revolution; use coolant for deep holes and for stainless steel.

  • Grinding: the tool rest must be set within 2 mm of the wheel and the tongue guard within 2 mm; the wheel must be ring-tested before mounting.

  • Spot welding: current 5-10 kA, electrode force 2-4 kN, weld time 0.1-0.5 s; the electrode tip diameter sets the nugget diameter, typically 4-5 times the square root of t.

Quick reference

Estimation, Costing and Material Calculation

  • Mass of a sheet: mass (kg) = length (m) x width (m) x thickness (mm) x density (kg/m3) / 1000; for mild steel use 7.85 kg per m2 per mm of thickness.

  • Blank size = developed length plus bend allowances plus seam and trimming allowances; add 5-10% wastage for irregular nesting.

  • Costing formula: total cost = material cost + labour cost + machine hour rate x hours + overhead percentage + profit margin.

  • Machine hour rate = (depreciation + power + maintenance + space cost) / annual productive hours.

  • Cutting speed and time: time = length of cut / feed rate; for shearing, add handling time of about 0.5-1 min per cut.

  • Nesting efficiency = total blank area / sheet area x 100%; a good nesting for rectangular blanks is 80-90%.

  • Welding cost estimation: consumable mass = deposit mass x (1 + spatter loss); deposition efficiency is about 60-70% for SMAW and 90-95% for GMAW.

  • Labour costing: direct labour = time taken x hourly rate; add idle time and setup time amortised over the batch quantity.

Quick reference

Employability Skills and Basic Computer Literacy

  • Communication: the 7 Cs are clear, concise, concrete, correct, coherent, complete and courteous; a technical report must state the observation, the measurement and the conclusion.

  • Interview and resume: a resume lists qualification, trade skills, tools handled, safety training and references; a cover letter is one page and specific to the employer.

  • Teamwork and 5S: sort, set in order, shine, standardise and sustain; 5S is the shop-floor housekeeping method used before quality audits.

  • Kaizen and PDCA: Plan-Do-Check-Act is the improvement cycle; Kaizen means continuous small improvement by the work team.

  • Computer basics: a byte is 8 bits; 1 KB = 1024 bytes; 1 MB = 1024 KB; ROM is non-volatile and holds the BIOS, RAM is volatile working memory.

  • Spreadsheet use for estimation: a formula begins with '='; relative references change on copy (A1) while absolute references do not ($A$1); SUM, AVERAGE and ROUND are the common functions.

  • CAD and CNC basics: G-code G00 is rapid positioning, G01 is linear interpolation, G02 and G03 are clockwise and counter-clockwise arcs; M03 starts the spindle clockwise.

  • Email and digital safety: use a strong password, never share OTPs, verify attachments before opening, and keep a backup of trade documents and drawings.