ITI/NCVT Sheet Metal Worker (AITT Theory) study plan
ITI/NCVT Sheet Metal Worker (AITT Theory) · Give each week a clear focus.
8 weeks · About 7 hours per week
Marking, Measuring and Layout Development & Pattern Development and Surface Layout
Derive the true lengths of inclined lines by the triangulation method and rotate/auxiliary-view method, working through at least ten solved layout problems from first principles
Develop a full parallel-line pattern for a cylinder cut by an inclined plane, a square-to-round transition, and a right cone, checking each against a hand-drawn development
Compute bend allowance and setback from neutral-axis radius, thickness and bend angle, and convert flat-pattern lengths into marked blank sizes for five worked parts
Lay out a radial-line development for a truncated cone and verify the included angle of the development arithmetically
Build a one-page formula sheet covering circumference, mean diameter, seam allowance, bend allowance and stretchout factors
Your checkpoint
A bound set of ten hand-drawn developments (parallel-line, radial-line and triangulation) with calculated true lengths and a verified formula sheet
Cutting, Shearing and Hand Forming Operations & Bending, Folding, Rolling and Press Operations
Select the correct snips type (straight, aviation left/right, compound) for a given cut path and justify the choice in writing
Cut straight, curved and internal profiles in 0.8 mm and 1.2 mm mild steel sheet to within 1 mm of a scribed line
Set up and operate a hand shear or treadle shear with correct blade clearance for the sheet thickness, and state the clearance rule
Form 90-degree flanges, a wired edge, a lap seam and a simple rolled cylinder by hand, checking squareness and diameter
Identify the causes of buckling, cracking and distorted edges during hand forming and list one remedy for each
Your checkpoint
Three finished practice pieces (a flanged tray, a wired-edge pan and a rolled cylinder) measured against a tolerance checklist with self-scored defects
Engineering Drawing, Sketching and Reading of Sheet Metal Drawings & Materials and Hand Tools for Sheet Metal Work
Read a third-angle and first-angle sheet metal drawing and correctly identify plan, elevation, end view and the projection symbol used
Interpret dimensioning, tolerances, surface finish symbols, weld symbols and a bill of materials on two sample drawings
Sketch an orthographic set (three views) and an isometric view of a simple duct fitting to scale
Classify common sheet metals (mild steel, galvanised iron, stainless, aluminium, copper, brass) by composition, coating and typical workshop use
Match each hand tool (scriber, dividers, trammel, prick punch, ball-peen hammer, stakes, groover, seaming pliers) to its purpose and state one care or safety rule
Your checkpoint
A sketch portfolio of three correctly projected part drawings plus a completed material-and-tool selection table for eight components
Edges, Seams, Joints and Fastening & Welding, Brazing, Soldering and Riveting for Sheet Metal
Name and sketch at least eight edge and seam types (lap, grooved, double, Pittsburgh lock, standing seam, wired, riveted, dovetail) and state where each is used
Form a grooved seam and a Pittsburgh lock by hand and test each for pull-apart strength
Select rivet type, diameter and pitch for a given joint and calculate the number of rivets required for a specified seam length
Describe the correct procedure, flux and filler for soft soldering a galvanised lap joint, and list the cleaning steps before and after
Distinguish where soldering, brazing and fusion welding are appropriate for sheet metal joints, including heat-distortion risk
Your checkpoint
A tested sample board of four formed seams and two riveted joints, each labelled with its type, application and a one-line strength observation
Trade Safety, Occupational Health and Environment & Machines, Equipment and Power Tools
Identify the hazards of shearing, bending, rolling and pressing operations and state the guarding and interlocks required at each machine
Demonstrate correct lockout/tagout sequence and safe blade-gap setting on a press brake or shear in a simulated walkthrough
Select the correct PPE for cutting, grinding, welding and solvent handling, and explain why each item is required
Describe safe manual handling limits and correct lifting technique for sheet stacks, and state the workshop housekeeping and waste-segregation rules
Explain the function and safe operating limits of the roll former, press brake, nibbler, power shears and portable grinder, including capacity and throat-depth checks
Your checkpoint
A written machine-by-machine safe-operating checklist for five machines plus a hazard-and-control table for the ten highest-risk tasks in the trade
Pattern Development and Surface Layout & Marking, Measuring and Layout Development
Develop an oblique or transition piece (square-to-round or rectangular-to-round) by triangulation, calculating every true length without reference to a worked answer
Mark out a full-size development on sheet including seam allowance, bend lines, centre lines and cut lines, and cut it to tolerance
Use a height gauge, combination set, dividers and trammel points to transfer dimensions accurately to a workpiece
Check a marked-out blank for squareness using the 3-4-5 method and diagonal comparison, and record the deviation
Diagnose and correct three common layout errors (wrong stretchout, reversed development, omitted seam allowance) by re-deriving the correct figure
Your checkpoint
One full-size transition-piece development marked out and cut, with a written true-length calculation sheet and a squareness record
Estimation, Costing and Material Calculation & Employability Skills and Basic Computer Literacy
Calculate the blank size, number of parts per standard sheet and scrap percentage for three nested layouts
Estimate material, consumable, labour and overhead cost for a small fabricated job and quote a selling price with a stated margin
Draft a short professional email and a simple job record using a spreadsheet, including a formula for total material cost
Explain the employability expectations of the trade: punctuality, reporting, teamwork, and safe escalation of a hazard to a supervisor
Interpret a basic drawing file or PDF, save and name files to a workshop convention, and describe safe and lawful use of shop-floor computers
Your checkpoint
A one-page cost estimate and quotation for a specified sheet metal job, supported by a spreadsheet showing material, labour and margin
Trade Safety, Occupational Health and Environment & Engineering Drawing, Sketching and Reading of Sheet Metal Drawings & Materials and Hand Tools for Sheet Metal Work & Marking, Measuring and Layout Development & Cutting, Shearing and Hand Forming Operations & Edges, Seams, Joints and Fastening & Bending, Folding, Rolling and Press Operations & Pattern Development and Surface Layout & Welding, Brazing, Soldering and Riveting for Sheet Metal & Machines, Equipment and Power Tools & Estimation, Costing and Material Calculation & Employability Skills and Basic Computer Literacy
Complete two full-length timed mock papers under exam conditions and score each domain separately
Re-study only the two weakest domains identified by the mock scores and re-test those domains
Recite from memory the key formulas (bend allowance, stretchout, rivet pitch, development angles) and key safety rules without notes
Review all flagged or uncertain items from weeks 1 to 7 and resolve each to a confident answer
Build a final one-page revision card summarising the highest-yield facts across all twelve domains
Your checkpoint
Two scored mock papers with a domain-by-domain error log and a completed one-page revision card
Milestones
Week 2: Cut and form the three practice pieces within stated tolerances and score at least 80 percent on a self-made 20-question quiz covering layout, cutting and forming
Week 4: Name and sketch all eight seam types from memory, and correctly calculate rivet count and pitch for two given seam lengths without notes
Week 6: Produce the full-size transition development with all true lengths calculated independently and squareness within 1 mm across the diagonals
Week 8: Score at least 70 percent on both timed mock papers, with no domain below 50 percent, and hold a completed error log and revision card