First-angle projection
A projection method in which the object is placed between the observer and the plane of projection, so the top view appears below the front view.
Representative fraction (RF)
The ratio of drawing length to actual length, written as 1:50 or 1:100; it defines the scale used to prepare the drawing.
Ellipse eccentricity
The ratio of the distance from a point on the conic to the focus divided by its distance to the directrix; for an ellipse it is less than one.
Nominal brick size
A modular brick with actual size 190 × 90 × 90 mm, giving a nominal size of 200 × 100 × 100 mm after adding 10 mm mortar joints.
English bond
A brick bond with alternating courses of headers and stretchers; it is the strongest bond and is used for walls carrying heavy loads.
Damp-proof course
A layer of impervious material, usually 40–50 mm thick, laid at plinth level to stop moisture rising through the wall by capillary action.
Height of instrument method
A levelling method in which the reduced level of the line of collimation is found by adding the backsight to the benchmark level, then subtracting staff readings.
Rise and fall method
A levelling reduction method in which the difference between consecutive staff readings gives a rise or fall, checked by ΣBS − ΣFS = ΣRise − ΣFall.
Two-peg test
A field test for a level in which readings on two pegs at equal distances reveal the collimation error, which is then corrected by adjusting the cross-hair.
Section modulus
The ratio of the moment of inertia about the neutral axis to the distance to the extreme fibre, so bending stress equals bending moment divided by section modulus.
Euler buckling load
The critical axial load at which a slender column buckles, equal to π²EI divided by the square of the effective length.
Poisson's ratio
The ratio of lateral strain to longitudinal strain in a loaded member; it is about 0.3 for steel and about 0.2 for concrete.
Water–cement ratio
The mass of water divided by the mass of cement in a concrete mix; a lower ratio increases strength and durability but reduces workability.
Characteristic strength
The strength of concrete below which not more than 5% of test results fall; M20 concrete has a 28-day cube strength of 20 N/mm².
Development length
The embedded length of a reinforcing bar needed to develop its design stress in the concrete without the bar pulling out.
Lami's theorem
For three coplanar concurrent forces in equilibrium, each force divided by the sine of the angle opposite it is constant.
Parallel-axis theorem
The moment of inertia about any axis equals the moment of inertia about a parallel centroidal axis plus the area times the square of the distance between the axes.
Angle of friction
The angle whose tangent equals the coefficient of friction between two surfaces; the resultant reaction is inclined at this angle to the normal.
Centre-line method
A quantity surveying method that multiplies the total centre-line length of walls by width and depth for each item, suited to walls of uniform thickness.
Prismoidal rule
A volume formula using end areas and intermediate areas: V = h/3[(A1 + An) + 4(sum of even areas) + 2(sum of odd areas)].
Contingency allowance
A provision of about 3–5% of the estimated cost added to a detailed estimate to cover unforeseen items and price variations.
Per capita demand
The average quantity of water used per person per day; about 135 litres per head per day is taken for domestic supply in Indian towns.
Chlorine demand
The difference between the chlorine dose applied and the residual chlorine left after the contact period; it measures the chlorine consumed by impurities.
Self-cleansing velocity
The minimum flow velocity in a sewer, about 0.6–0.75 m/s, that prevents solids from settling and keeps the drain free from deposits.
Superelevation
The inward transverse slope given to a road curve, calculated as V²/(127R), to counteract centrifugal force; the maximum is 7% on plain terrain.
Stopping sight distance
The distance a driver needs to stop a vehicle after seeing an obstruction, equal to the lag distance plus the braking distance.
CBR value
The California Bearing Ratio, the ratio of the load required to penetrate a soil sample to that for standard crushed stone, used to design flexible pavement thickness.
Critical path
The longest path through a project network; its activities have zero total float and determine the minimum project duration.
Total float
The time by which an activity can be delayed without delaying the project completion; it equals latest start minus earliest start.
Cost slope
The additional cost per unit of time saved when an activity is crashed, computed as crash cost minus normal cost divided by normal time minus crash time.
Excavation shoring
Temporary support such as timber or sheet piling provided to the sides of a deep trench to prevent soil collapse and protect workers.
Object snap (OSNAP)
A CAD drafting aid that locks the cursor to precise geometric points such as endpoints, midpoints, centres, and intersections of existing objects.