Junior Engineer · Keep the key ideas within reach.

Quick reference

Engineering Fundamentals and Applied Mathematics

  • Unit conversions: 1 kip = 4.448 kN; 1 ksi = 6.895 MPa; 1 ft = 0.3048 m; 1 in = 25.4 mm; 1 psi = 6.895 kPa.

  • Quadratic formula for ax² + bx + c = 0: x = [-b ± √(b² − 4ac)] / (2a); discriminant b² − 4ac < 0 means no real root.

  • Right-triangle relations: sin θ = opposite/hypotenuse, cos θ = adjacent/hypotenuse, tan θ = opposite/adjacent; law of cosines c² = a² + b² − 2ab·cos C.

  • Statics equilibrium for a planar body: ΣFx = 0, ΣFy = 0, ΣM = 0; a three-force body in equilibrium has concurrent or parallel lines of action.

  • Resultant of two perpendicular vectors: R = √(Fx² + Fy²), direction θ = arctan(Fy/Fx) measured from the x-axis.

  • Centroid of a rectangle is at mid-height and mid-width; for a triangle it lies one-third of the height above the base.

  • Moment of inertia of a rectangle about its centroidal axis: I = b·h³/12; parallel-axis theorem I = I_c + A·d².

  • Flow continuity: Q = A·v; for incompressible flow through a pipe, A₁v₁ = A₂v₂, so halving area doubles velocity.

  • Slope and area relationships: the integral of a load diagram gives shear, and the integral of shear gives moment; slope of the moment diagram equals shear.

Quick reference

Materials, Mechanics, and Structural Behavior

  • Axial stress σ = P/A; axial strain ε = ΔL/L; Hooke's law σ = E·ε applies below the proportional limit.

  • Elastic elongation of a bar: ΔL = P·L/(A·E); stiffness rises with area and modulus and falls with length.

  • Poisson's ratio ν = −lateral strain / axial strain, typically 0.25–0.35 for metals and about 0.15–0.20 for concrete.

  • Bending stress σ = M·c/I, where c is distance from the neutral axis to the extreme fiber; section modulus S = I/c gives σ = M/S.

  • Shear stress in a beam: τ = V·Q/(I·t), maximum at the neutral axis for a rectangular section and zero at the extreme fibers.

  • Deflection limits are serviceability criteria, commonly L/360 for floors under live load and L/240 or L/180 for roofs, set by the governing code.

  • Concrete compressive strength is specified by 28-day cylinder strength f'c; tensile strength is roughly 8–12% of f'c, so steel reinforcement carries tension.

  • Thermal strain ε = α·ΔT; restrained thermal movement generates stress σ = E·α·ΔT, so expansion joints prevent cracking.

  • Ductility is measured by elongation at rupture; a ductile failure gives warning deformation, whereas a brittle failure occurs with little strain.

Quick reference

Engineering Drawings, Specifications, and Quantity Takeoff

  • Drawing set order of precedence is normally stated in the contract: typically specifications govern over drawings, and large-scale detail drawings govern over small-scale plans.

  • A scale of 1:100 means one drawing unit equals 100 real units; a 25 mm dimension on a 1:100 plan represents 2,500 mm on site.

  • Line conventions: continuous thick lines for visible edges, dashed lines for hidden edges, chain lines for centerlines and section cut lines.

  • A section view is identified by a cutting-plane line with arrows showing the direction of view and letters matching the section title.

  • Quantity takeoff measures net dimensions from the drawings, then applies waste or overlap allowances separately; concrete is measured in cubic meters, formwork in square meters of contact area.

  • Rebar weight: mass = length × area × density; for a round bar, kg/m = d²/162 with d in mm (e.g., 16 mm bar ≈ 1.58 kg/m).

  • Specification divisions follow a master format grouping (e.g., concrete, masonry, metals, thermal and moisture protection); the specification governs quality, the drawing governs geometry.

  • A bill of quantities is a measured schedule of work items with units and quantities; a schedule of values allocates the contract sum to work items for progress payment.

Quick reference

Construction Methods, Equipment, and Site Operations

  • Concrete placement: free fall should not exceed about 1.5 m without a tremie or drop pipe to avoid segregation; vibration is by poker vibrator at regular spacing.

  • Formwork stripping: sides of beams and columns may be removed after concrete hardens enough to resist damage; soffits of slabs and beams require the concrete to reach a specified strength, commonly 70% of f'c.

  • Excavation support: sloping, benching, shoring, or shielding is selected by soil type and depth; spoil and equipment must be kept back from the crest.

  • Compaction equipment matches soil: smooth drum rollers for granular subgrade, sheepsfoot rollers for cohesive soils, plate compactors for trenches and confined areas.

  • Crane capacity falls as radius and boom length increase; the load chart must be checked for the actual radius, and capacity deductions apply for jib, hook block, and rigging.

  • Earthwork volume by the average end area method: V = L·(A₁ + A₂)/2; the prismoidal formula adds mid-section correction V = L·(A₁ + 4A_m + A₂)/6.

  • Asphalt compaction must begin while the mix is within the rolling temperature range; breakdown rolling follows the paver closely, then intermediate and finish rolling.

  • Dewatering by sump pumps suits shallow granular excavation; wellpoints lower the water table by roughly 4–6 m per stage.

Quick reference

Surveying, Layout, and Field Measurement

  • Leveling: elevation difference = backsight − foresight; height of instrument = known elevation + backsight; new elevation = HI − foresight.

  • Arithmetic check of a level run: Σ backsight − Σ foresight = last elevation − first elevation.

  • A closed traverse should satisfy Σ interior angles = (n − 2) × 180°; the misclosure is distributed equally among the angles.

  • Latitude = distance × cos(bearing), departure = distance × sin(bearing); a closed traverse requires Σ latitude = 0 and Σ departure = 0.

  • Slope correction to a measured distance: C = −h²/(2L), where h is the elevation difference and L the measured slope distance.

  • Temperature correction for a steel tape: C = L·α·(T − T₀), with α ≈ 1.16 × 10⁻⁵ per °C for steel.

  • Total station coordinates: ΔN = d·cos(azimuth), ΔE = d·sin(azimuth); azimuth is measured clockwise from north, bearings are measured from north or south within a quadrant.

  • A 3-4-5 triangle (or multiples) sets a right angle in the field; the diagonal check confirms a rectangular layout before setting out.

Quick reference

Health, Safety, and Environmental Controls

  • Hierarchy of controls, most to least effective: elimination, substitution, engineering controls, administrative controls, personal protective equipment.

  • Fall protection is generally required at heights of 1.8 m (6 ft) or more in general industry practice; guardrails, nets, or personal fall-arrest systems are acceptable controls.

  • Excavations 1.5 m (5 ft) or deeper require a protective system unless the excavation is entirely in stable rock; a competent person must inspect daily and after rain.

  • Ladder use: the 4:1 rule sets the base one unit out for every four units of height; ladders must extend about 1 m above the landing.

  • Scaffold guardrails are typically at 1.0 m and 0.5 m above the platform with toe boards; the scaffold must be designed and erected by qualified persons.

  • Electrical safety: ground-fault circuit interrupter protection is required for temporary receptacles; lockout/tagout isolates energy before maintenance.

  • Hazardous noise exposure commonly triggers a hearing conservation program at an 8-hour average of 85 dBA; controls follow the hierarchy.

  • Environmental controls: silt fences and sediment basins intercept runoff, and concrete washout must be contained away from drains and watercourses.

  • Incident rate = (number of recordable incidents × 200,000) / total hours worked; 200,000 equals 100 workers at 40 hours for 50 weeks.

Quick reference

Project Planning, Scheduling, and Cost Control

  • Critical path is the longest-duration path through the network; it determines project duration and has zero total float.

  • Total float = late start − early start = late finish − early finish; free float is the delay possible without delaying any successor.

  • Forward pass computes early start and finish (ES + duration = EF); backward pass computes late finish and start (LF − duration = LS).

  • Crashing shortens duration by adding resources to critical activities; it is effective only on the critical path and raises direct cost.

  • Earned value: CV = EV − AC, SV = EV − PV, CPI = EV/AC, SPI = EV/PV; CPI below 1.0 means cost overrun.

  • Estimate at completion: EAC = BAC/CPI when the current cost performance is expected to continue; EAC = AC + (BAC − EV) when remaining work proceeds at budgeted rate.

  • Percent complete by cost = earned value / budget at completion; physical percent complete should be measured by installed quantities, not elapsed time.

  • A Gantt bar chart shows timing but not logic dependencies; a network diagram (CPM) shows dependencies and float.

  • S-curve plots cumulative cost or progress against time; the gap between planned and actual curves shows schedule variance.

Quick reference

Contracts, Ethics, and Professional Practice

  • A valid contract requires offer, acceptance, consideration, capacity, and legality; a counteroffer rejects the original offer.

  • Design-bid-build separates design and construction; design-build gives one entity responsibility for both; construction management is a delivery method, not a contract type.

  • Standard contract documents include the agreement, general and supplementary conditions, specifications, drawings, and addenda; addenda issued before bid opening become part of the contract.

  • Liquidated damages must be a genuine pre-estimate of loss, not a penalty; they are stated per day of delay in the contract.

  • A change order is a written, signed modification to scope, price, or time; a field instruction or construction change directive may precede it.

  • Retainage is a percentage held from progress payments until acceptance; it is released per the contract, often partly at substantial completion.

  • Professional ethics: engineers sign and seal only work they prepared or directly supervised, disclose conflicts of interest, and report unsafe conditions to the responsible authority.

  • Substantial completion is the stage when the work is usable for its intended purpose, triggering warranty start and release of part of retainage; final completion follows punch-list closeout.

  • Bid protest and dispute paths usually run through the contract's dispute clause: negotiation, then mediation or arbitration, then litigation, as specified.

Quick reference

Quality Control, Testing, and Inspection

  • Concrete slump test (ASTM C143) measures workability; slump is measured as the drop of the cone-shaped sample after removal of the mold.

  • Concrete compressive strength is tested on cylinders (ASTM C39); standard 150 × 300 mm cylinders are cured and tested at 7 and 28 days.

  • Acceptance of concrete strength commonly requires the average of three consecutive tests to equal or exceed f'c, with no single test below f'c − 3.5 MPa.

  • Soil compaction is verified by field density (sand cone, nuclear gauge) compared with laboratory maximum dry density from a Proctor test; the ratio is relative compaction.

  • Standard Proctor uses lower energy than Modified Proctor; Modified Proctor yields a higher maximum dry density at a lower optimum moisture content.

  • Asphalt density acceptance compares field density to laboratory Marshall or gyratory density; typical required relative density is 92–96% of the laboratory value.

  • Steel weld inspection: visual inspection first, then nondestructive methods such as ultrasonic, radiographic, magnetic particle, or dye penetrant depending on joint type.

  • Rebar placement is checked against cover and spacing tolerances before concrete placement; a pre-pour inspection checklist is signed off before release.

  • Test reports must record sample location, date, specimen identification, test method, and result; nonconformance triggers a documented corrective action.