- Limit state design
- Related: Load factor, Serviceability limit state, Factor of safety
A design method that checks a structure against defined conditions of failure, such as collapse or excessive deflection, using factored loads and factored resistances to keep the probability of failure acceptably low.
- Load factor
- Related: Limit state design, Load combination
A multiplier applied to nominal loads to account for uncertainty and variability, producing the design load used in limit state checks. Values differ by load type and combination.
- Serviceability limit state
- Related: Limit state design, Deflection
A condition in which a structure remains safe but becomes unfit for use because of deflection, vibration, or cracking. Checked against unfactored loads rather than collapse criteria.
- Factor of safety
- Related: Limit state design, Allowable stress design
The ratio of a material's or system's capacity to the load or stress actually applied. A value above one indicates reserve strength; the margin covers uncertainty in loads and properties.
- Stress-strain curve
- Related: Yield strength, Young's modulus, Ductility
A plot of applied stress against resulting strain for a material under load. Its slope gives stiffness, its peak gives strength, and its shape reveals ductility or brittleness.
- Yield strength
- Related: Stress-strain curve, Ductility
The stress at which a material begins to deform permanently, marking the end of elastic behavior. Commonly reported as a 0.2 percent offset value for metals without a sharp yield point.
- Young's modulus
- Related: Stress-strain curve, Deflection
The ratio of stress to strain within the elastic range of a material, expressing its stiffness. A higher value means less deformation for a given applied stress.
- Ductility
- Related: Yield strength, Stress-strain curve
The ability of a material to undergo large plastic deformation before fracturing. Ductile behavior provides warning before failure and allows redistribution of internal forces.
- Bending moment
- Related: Shear force, Section modulus, Deflection
The internal rotational effect produced in a beam by loads acting at a distance from a section. It causes one face to be in tension and the opposite face in compression.
- Shear force
- Related: Bending moment, Shear stress
The internal force acting parallel to a cross section of a member, tending to slide one part past the adjacent part. It varies along a beam according to the applied loads.
- Section modulus
- Related: Bending moment, Second moment of area
A geometric property of a cross section equal to its second moment of area divided by the distance to the extreme fiber. Used to convert bending moment into maximum bending stress.
- Second moment of area
- Related: Section modulus, Deflection
A geometric measure of how a cross section's area is distributed about an axis, governing its resistance to bending. Often called moment of inertia in structural work.
- Deflection
- Related: Serviceability limit state, Young's modulus
The displacement of a structural member from its unloaded position under load. Excessive deflection can crack finishes, pond water, or impair serviceability even when strength is adequate.
- Concrete slump test
- Related: Workability, Concrete cube test
A field test in which freshly mixed concrete is placed in a standard cone, the cone removed, and the drop in height measured as an indicator of workability and consistency.
- Concrete cube test
- Related: Concrete slump test, Characteristic strength
A laboratory compression test on cured concrete specimens, usually cubes or cylinders, to verify that the hardened mix achieves its specified characteristic strength at a stated age.
- Characteristic strength
- Related: Concrete cube test, Limit state design
The strength value below which a defined small percentage of test results is expected to fall, used as the basis for structural design values before partial factors are applied.
- Workability
- Related: Concrete slump test, Segregation
The ease with which fresh concrete or mortar can be mixed, placed, compacted, and finished without segregation. It is influenced by water content, aggregate grading, and admixtures.
- Segregation
- Related: Workability, Compaction
The separation of coarse aggregate from mortar or paste in a concrete mix, often caused by over-wet mixes, excessive drop heights, or poor handling during placement.
- Compaction
- Related: Segregation, Proctor test
The process of removing entrapped air from freshly placed concrete or soil by vibration or mechanical effort, increasing density, strength, and impermeability.
- Proctor test
- Related: Compaction, Field density test
A laboratory procedure that determines the maximum dry density of a soil and the moisture content at which it occurs, providing a benchmark for field compaction control.
- Field density test
- Related: Proctor test, Compaction
An in-situ measurement of compacted soil density, often by sand replacement or nuclear methods, compared with laboratory reference values to confirm that specified compaction has been achieved.
- Bill of quantities
- Related: Quantity takeoff, Measurement standard, Variation order
A priced or unpriced schedule listing work items with descriptions and measured quantities, prepared from drawings and specifications so that tenderers price the same scope consistently.
- Quantity takeoff
- Related: Bill of quantities, Measurement standard
The process of measuring and listing the quantities of materials and work from drawings and specifications, forming the basis of estimates, bills of quantities, and material ordering.
- Measurement standard
- Related: Bill of quantities, Quantity takeoff
A published set of rules governing how work is described and measured for quantities, including what is included or excluded and how deductions are treated.
- Scale drawing
- Related: Orthographic projection, Setting out
A drawing in which all dimensions are reduced or enlarged by a constant ratio, stated on the sheet, so that real sizes can be derived by measuring and converting.
- Orthographic projection
- Related: Scale drawing, Section drawing
A method of representing a three-dimensional object by separate two-dimensional views projected onto perpendicular planes, typically plans, elevations, and sections.
- Section drawing
- Related: Orthographic projection, Detail drawing
A view showing an object as if cut by a plane, revealing internal construction, layer build-up, and hidden detail that exterior views cannot show.
- Setting out
- Related: Benchmark, Total station, Scale drawing
The field operation of transferring positions, levels, and dimensions from design drawings to the ground using survey instruments, pegs, and reference lines before construction begins.
- Benchmark
- Related: Setting out, Leveling
A fixed point of known elevation or coordinates used as a reference for leveling and setting out. Temporary benchmarks are established on site and protected from disturbance.
- Leveling
- Related: Benchmark, Total station
The surveying operation of determining the relative heights of points, usually by reading a graduated staff through a leveling instrument set on a stable tripod.
- Total station
- Related: Setting out, Leveling
An electronic surveying instrument combining an angle-measuring theodolite with an electronic distance meter and onboard computer, used for coordinate measurement and setting out.
- Critical path
- Related: Float, Gantt chart, Program evaluation and review technique
The longest sequence of dependent activities through a project network, determining the shortest possible project duration. Any delay on it delays completion unless compressed.
- Float
- Related: Critical path, Gantt chart
The amount of time an activity can be delayed without delaying the project or a successor. Activities on the critical path have zero total float.
- Gantt chart
- Related: Critical path, Float
A bar chart displaying activities against a calendar time axis, showing start and finish dates, durations, and often progress, dependencies, and milestones.
- Variation order
- Related: Bill of quantities, Retention
A formal written instruction authorizing a change to the scope, quality, or timing of contracted work, with valuation of cost and time effects under the contract.
- Retention
- Related: Variation order, Interim payment certificate
A percentage withheld from interim payments under a construction contract and released at stated stages, providing the client security for defects and non-completion.
- Interim payment certificate
- Related: Retention, Variation order
A document issued periodically by the contract administrator certifying the amount due to the contractor for work executed, less retentions and previous payments.
- Method statement
- Related: Risk assessment, Permit to work, Inspection and test plan
A written description of how a construction activity will be carried out, including sequence, plant, labor, temporary works, and controls, often required before high-risk work starts.
- Risk assessment
- Related: Method statement, Hierarchy of controls, Permit to work
A structured process of identifying hazards, evaluating the likelihood and severity of harm, and recording controls to reduce risk to an acceptable level.
- Hierarchy of controls
- Related: Risk assessment, Permit to work
A ranked order of risk-reduction measures, from eliminating the hazard and substituting it, through engineering and administrative controls, to personal protective equipment last.
- Permit to work
- Related: Risk assessment, Method statement, Lockout-tagout
A formal documented authorization controlling high-risk activities, confirming that specified precautions are in place before work starts and that the area is safe on completion.
- Lockout-tagout
- Related: Permit to work, Risk assessment
A procedure for isolating energy sources and fitting locks and tags so equipment cannot be re-energized while maintenance or repair is in progress.
- Inspection and test plan
- Related: Method statement, Non-conformance report, Hold point
A project document listing the inspections and tests to be performed, the acceptance criteria, the responsible parties, and the hold points requiring sign-off before work proceeds.
- Hold point
- Related: Inspection and test plan, Non-conformance report
A stage in a process where work must not continue until a specified inspection or approval has been completed and recorded by the authorized party.
- Non-conformance report
- Related: Inspection and test plan, Hold point
A record describing work or material that fails to meet specified requirements, including the nature of the failure, disposition, and corrective action taken.