PSB LBO · Put your knowledge to work in context.

All case studies

Code Edition Vesting at Permit Application

On June 28, 2024, a developer submits a permit application for a 6-story, 75,000-square-foot hotel (Type IIIB) to the City of Riverton. The city adopted the 2021 IBC effective July 1, 2024, with a 180-day transition period: projects with a "complete" application submitted before July 1 may use the 2018 IBC. The application includes architectural drawings but omits structural calculations and the geotechnical report required by the city's completeness checklist. The plans examiner marks the application incomplete. The developer argues that the application was submitted before the deadline and should vest under the 2018 code, and asks to submit the missing items after July 1. The city has a written policy defining a complete application as one that includes every item on the checklist. No state statute addresses vesting. The building official must decide whether to accept the application as vested and how to document the decision.

1. What factors should the building official weigh in deciding whether the application is complete for vesting under the 2018 code?

Read the worked answer

The building official should start with the text of the adopting ordinance, which conditions vesting on a "complete" application. Because the city has a written policy defining completeness by a checklist, the official should ask whether that policy is reasonable, published, and consistently applied. Completeness is not the same as submittal: an application missing structural calculations and a geotechnical report cannot be reviewed for structural or geotechnical code compliance, so those are material omissions. The official should also consider reliance and fairness: if the city has routinely accepted incomplete applications as complete, the developer may have a stronger estoppel argument. But a single inconsistent practice does not override a written policy. The official should examine whether the missing items were clearly listed on the checklist and whether the applicant had notice. Finally, the official should consider the purpose of the transition period: to give projects already in the pipeline a stable code edition, not to allow developers to reserve an old code by filing placeholder documents. On balance, the application is likely incomplete, but the official should make written findings rather than rely on a verbal denial.

2. If the building official determines the application is incomplete, what options and legal risks exist?

Read the worked answer

The building official can reject the application as incomplete, issue a written deficiency notice listing each missing item, and explain that no vesting occurs until the application is complete. A second option is to accept the application for intake but not for vesting, giving the applicant a cure period; however, that risks confusion and a later claim that the city treated the application as complete. A third option is to allow the applicant to withdraw and resubmit under the 2021 code. The main legal risk is an appeal or lawsuit alleging that the city applied its completeness policy arbitrarily or inconsistently. The city can reduce that risk by showing the checklist was provided, the missing items were material, and the same policy has been applied to other applicants. There is also a due-process risk if the applicant is not given a written decision and a clear appeal path. The official should avoid informal assurances that the project will vest, because such statements can support an estoppel claim. The safest course is a written determination with findings, a statement of appeal rights, and a clear explanation that vesting is tied to completeness, not mere submittal.

3. How should the building official document the decision to withstand appeal?

Read the worked answer

The building official should prepare a written determination that identifies the ordinance and the city's completeness policy, the date and time the application was received, the checklist items that were missing, and the date the applicant was notified. The determination should include copies of the checklist, the submitted drawings, and any correspondence showing the applicant knew the structural and geotechnical items were required. It should state that completeness is a factual determination based on the checklist, not a discretionary judgment about whether the project is likely to comply. The official should also document how similar applications have been treated, to rebut any claim of inconsistent treatment. If the applicant argues that the missing items were not required at submittal, the official should cite the specific checklist provision and any prior practice. The determination should advise the applicant of the appeal deadline and the body to which an appeal may be taken. Finally, the official should keep the record in the permit file and avoid later oral modifications. A clear, contemporaneous record is the best defense against an appeal or a claim that the city waived its completeness requirement.