PSB LBO · Get comfortable with the vocabulary.

Occupancy Classification

The process of assigning a building or portion of it to a use group based on the character of the activities expected inside, which then governs allowable height, area, fire protection, and egress requirements.

Related: Use Group, Construction Type, Mixed Occupancy
Use Group

A named category of occupancy, such as assembly, business, educational, factory, hazardous, institutional, mercantile, residential, storage, or utility, into which a building is placed for code application.

Related: Occupancy Classification, Mixed Occupancy, Incidental Use
Construction Type

A classification of building construction based on the fire resistance of structural elements, ranging from noncombustible protected types through combustible types, which limits permitted height and floor area.

Related: Fire-Resistance Rating, Type I Construction, Type V Construction
Type I Construction

The most fire-resistive construction class, in which structural members are noncombustible and protected to high hourly ratings, permitting the greatest building heights and areas.

Related: Construction Type, Fire-Resistance Rating, High-Rise Building
Type V Construction

The least restrictive construction class, allowing combustible structural elements such as wood frame, and therefore subject to the tightest limits on height, area, and required separation.

Related: Construction Type, Fireblocking, Allowable Area
Mixed Occupancy

A building containing two or more distinct use groups, which must be separated by rated fire barriers or evaluated as a single occupancy using the most restrictive requirements.

Related: Use Group, Incidental Use, Occupancy Separation
Incidental Use

A subordinate space, such as a boiler room, storage room, or laboratory, whose use is ancillary to the main occupancy and may require separation or sprinkler protection under specific criteria.

Related: Mixed Occupancy, Occupancy Separation, Hazardous Materials
Allowable Area

The maximum floor area permitted for a building or story, determined from the base tabular area adjusted for frontage, sprinkler protection, and occupancy separation.

Related: Construction Type, Frontage Increase, Area Separation Wall
Frontage Increase

An allowance that increases permitted building area when a structure abuts open public ways or yards on one or more sides, giving firefighting access and reducing exposure risk.

Related: Allowable Area, Area Separation Wall
Area Separation Wall

A fire-resistance-rated wall that divides a building into separate area compartments, allowing each side to be treated independently for allowable area and sometimes for construction type.

Related: Allowable Area, Fire Barrier, Fire Wall
Fire-Resistance Rating

The period, in hours or fractions of an hour, that a building element resists fire exposure under standardized test conditions, expressed in the code as a required or provided rating.

Related: Fire Barrier, Fire Wall, Opening Protectives
Fire Wall

A wall with sufficient structural stability under fire conditions to allow collapse of construction on either side without collapse of the wall, used to create separate buildings.

Related: Area Separation Wall, Fire Barrier, Fire-Resistance Rating
Fire Barrier

A fire-resistance-rated wall or floor assembly that restricts the spread of fire and is continuous from the floor slab to the underside of the floor or roof above.

Related: Fire Wall, Fire-Resistance Rating, Smoke Barrier
Opening Protectives

Fire-rated assemblies such as doors, windows, shutters, and fire dampers that protect openings in rated walls and floors and must carry a rating appropriate to the assembly.

Related: Fire-Resistance Rating, Fire Door, Fire Damper
Means of Egress

A continuous and unobstructed path of travel from any point in a building to a public way, composed of the exit access, the exit, and the exit discharge.

Related: Exit Access, Exit Discharge, Travel Distance
Exit Access

The portion of the means of egress that leads from the occupied space to an exit, including aisles, corridors, and the intervening rooms and spaces.

Related: Means of Egress, Travel Distance, Common Path of Egress Travel
Exit Discharge

The portion of the means of egress between the termination of an exit and a public way, such as an exterior exit door leading to a yard or sidewalk.

Related: Means of Egress, Exit Access, Public Way
Travel Distance

The measured length along the natural path of travel from the most remote point in a space to an exit, limited by occupancy and whether the building is sprinklered.

Related: Exit Access, Common Path of Egress Travel, Means of Egress
Common Path of Egress Travel

The portion of exit access travel that occupants must traverse before reaching a point where two distinct egress paths become available, limited to control dead-end exposure.

Related: Travel Distance, Exit Access, Dead-End Corridor
Dead-End Corridor

A corridor segment with only one direction of escape, permitted only within limited lengths because occupants could be trapped if fire blocks the single path.

Related: Common Path of Egress Travel, Exit Access
Egress Width

The clear capacity of an exit component, measured in inches and calculated per occupant, ensuring doors, stairs, and corridors can serve the occupant load assigned to them.

Related: Occupant Load, Means of Egress, Exit Sign
Occupant Load

The total number of persons that a space or story is designed to hold, computed from floor area divided by an occupant load factor or from fixed seating counts.

Related: Egress Width, Means of Egress, Assembly Occupancy
Accessible Route

A continuous, unobstructed path connecting accessible elements and spaces within a site or building that complies with dimensional, slope, and surface requirements for people with disabilities.

Related: Accessible Means of Egress, Clear Floor Space, Reach Range
Accessible Means of Egress

A continuous path of travel to the public way that can be used by persons with disabilities, including accessible routes, areas of refuge, and compliant stairs or ramps where permitted.

Related: Accessible Route, Area of Refuge, Means of Egress
Area of Refuge

A designated space, often a stair landing or rated room, where persons unable to use stairs can wait for assistance during an emergency evacuation.

Related: Accessible Means of Egress, Accessible Route
Permit Application

The formal submittal, including plans, specifications, and supporting data, by which an applicant requests authority to construct, alter, or change the use of a building.

Related: Plan Review, Permit Issuance, Construction Documents
Plan Review

The technical examination of construction documents by code staff to verify compliance with applicable codes and ordinances before a permit is issued.

Related: Permit Application, Construction Documents, Plan Reviewer
Construction Documents

The drawings, specifications, calculations, and other submittals that describe the proposed work in sufficient detail for the code official to determine compliance.

Related: Plan Review, Permit Application
Permit Issuance

The official act of approving an application and releasing a permit, which authorizes the applicant to begin the permitted work subject to stated conditions.

Related: Permit Application, Certificate of Occupancy
Certificate of Occupancy

A document issued after final inspection confirming that a building or space complies with code and may lawfully be occupied for its stated use.

Related: Final Inspection, Permit Issuance, Change of Use
Change of Use

A change in how a building or space is occupied that may trigger new code requirements, such as added egress, fire protection, or accessibility upgrades.

Related: Certificate of Occupancy, Existing Building, Occupancy Classification
Inspection

An on-site verification by the code official that work matches approved plans and code requirements at defined stages, such as foundation, framing, and final completion.

Related: Final Inspection, Stop Work Order, Field Enforcement
Final Inspection

The concluding inspection that confirms all permitted work is complete and compliant, allowing issuance of a certificate of occupancy or closeout of the permit.

Related: Inspection, Certificate of Occupancy
Stop Work Order

A written directive halting work that is proceeding without a permit, contrary to approved plans, or in an unsafe manner until the violation is corrected.

Related: Inspection, Notice of Violation, Unsafe Structure
Notice of Violation

A formal written notice to a property owner or responsible party identifying a code violation and specifying required corrective action and a compliance deadline.

Related: Stop Work Order, Unsafe Structure, Abatement
Unsafe Structure

A building or portion that is structurally deficient, a fire hazard, or otherwise dangerous to life or safety, authorizing the code official to order repair, vacating, or demolition.

Related: Abatement, Notice of Violation, Existing Building
Abatement

The process of eliminating a violation or unsafe condition, whether by the owner's corrective work or by the jurisdiction acting after notice and legal authority.

Related: Unsafe Structure, Notice of Violation
Existing Building

A structure already erected and lawfully occupied before the current code edition, subject to separate provisions governing repairs, alterations, additions, and changes of use.

Related: Change of Use, Unsafe Structure, Maintenance Requirement
Maintenance Requirement

The ongoing duty to keep a building's fire protection, egress, structural, and life-safety systems in good repair and functioning as originally approved throughout occupancy.

Related: Existing Building, Certificate of Occupancy
Due Process

The constitutional protection requiring fair notice, an opportunity to be heard, and reasoned decisions before a government body restricts property rights or imposes penalties.

Related: Appeal, Notice of Violation, Code Official Authority
Appeal

A formal request for review of a code official's decision by an administrative board or court, which must be filed within the time and manner set by statute or ordinance.

Related: Due Process, Board of Appeals, Variance
Variance

An authorized deviation from a strict code requirement granted when literal enforcement would cause practical difficulty, provided the intent and safety of the code are preserved.

Related: Appeal, Board of Appeals, Due Process
Code Official Authority

The statutory power granted to the building official to interpret and enforce the code, issue permits, conduct inspections, and order correction of violations.

Related: Due Process, Stop Work Order, Appeal
Ethical Conflict of Interest

A situation in which a reviewer's or inspector's personal, financial, or other interest could improperly influence official decisions, requiring disclosure and recusal.

Related: Code Official Authority, Due Process