PSB LBO study materials
PSB LBO study resources

PSB LBO study plan

PSB LBO · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Building Codes and Regulatory Administration & Administration, Legal Authority, and Ethics

  • Map the code-administration workflow from permit application through certificate of occupancy, writing out each step and which party owns it

  • Distinguish the roles of the building official, plans examiner, and inspector, and state which decisions each is empowered to make

  • Outline the legal basis for code adoption, amendments, and local enforcement authority in your jurisdiction

  • Identify the appeal and variance process, including who hears appeals and the timelines involved

  • List the ethical duties of a code official, including conflicts of interest, ex parte contact, and confidentiality

Your checkpoint

A one-page flowchart of the permit-to-occupancy process annotated with the authority, appeal route, and ethical checkpoint at each stage

Week 2

Building Codes and Regulatory Administration & Plan Review and Permit Processing

  • Trace how a code change enters through the model-code cycle and reaches local adoption

  • Compare the administrative provisions of the code with the plan-review submittal requirements for a commercial project

  • Practice classifying a submittal as complete or deficient against a written checklist

  • Draft the sequence of review disciplines (architectural, structural, fire, accessibility) and what triggers each

  • Explain how deferred submittals and phased permits are handled administratively

Your checkpoint

A completed plan-review checklist applied to a hypothetical tenant-improvement submittal, with at least five deficiencies flagged and justified by code section

Week 3

Plan Review and Permit Processing & Structural and Fire/Life-Safety Provisions

  • Read structural drawings well enough to verify that design criteria, occupancy category, and risk category are stated and consistent

  • Check that fire-resistance ratings shown on plans match the required separations for the occupancy and construction type

  • Verify that fire-protection system submittals include the required design documents and hydraulic calculations

  • Identify common plan-review errors in egress width, travel distance, and shaft enclosure details

  • Practice writing a correction notice that cites the code section and states the required fix

Your checkpoint

Three written correction notices on structural or fire/life-safety deficiencies, each with a code citation and a specific remedy

Week 4

Structural and Fire/Life-Safety Provisions & Occupancy Classification and Construction Types

  • Assign occupancy classifications to a mixed-use building and resolve the separated versus nonseparated occupancy question

  • Determine the allowable height and area for a given construction type, applying sprinkler and frontage increases

  • Verify that structural fire protection, opening protectives, and penetration firestopping match the assembly ratings

  • Distinguish the five construction types by their structural elements and required fire resistance

  • Explain the difference between an occupancy change and a change of use, and what each triggers

Your checkpoint

A height-and-area compliance worksheet for one mixed-use building showing base allowances, each increase applied, and the final permitted values

Week 5

Means of Egress and Accessibility Requirements & Inspection Procedures and Field Enforcement

  • Calculate occupant load, required egress width, and number of exits for several occupancy types

  • Verify exit access travel distance, common path, and dead-end limits against the plan

  • Check accessibility provisions for accessible routes, turning space, and fixture clearances

  • Sequence a rough-in inspection so that framing, firestopping, and MEP rough-ins are verified before concealment

  • Draft field notes that document a code violation with location, condition, and code section

Your checkpoint

A field-inspection packet: one completed rough-in inspection record plus an egress and accessibility compliance summary for a single floor plan

Week 6

Inspection Procedures and Field Enforcement & Existing Buildings, Maintenance, and Unsafe Structures

  • Plan a final inspection sequence covering fire-resistance, egress, alarms, and accessibility before occupancy

  • Determine when an existing building triggers repair, alteration, or change-of-occupancy provisions rather than new-construction requirements

  • Identify the criteria for declaring a structure unsafe and the procedural steps that follow

  • Distinguish maintenance obligations from alteration permits for existing occupancies

  • Practice documenting a stop-work or unsafe-structure notice with the required findings

Your checkpoint

Two written enforcement documents: a final inspection deficiency list and a draft unsafe-structure notice with findings and abatement timeline

Week 7

Building Codes and Regulatory Administration & Plan Review and Permit Processing & Structural and Fire/Life-Safety Provisions & Occupancy Classification and Construction Types

  • Work timed scenario sets that combine administration, plan review, and structural provisions

  • Diagnose recurring errors from earlier weeks and rewrite the underlying rule in your own words

  • Rehearse citing code sections from memory for the provisions you missed most often

  • Build a personal list of the twenty provisions you are least confident about

  • Verify each weak provision against the code text and correct any misconceptions

Your checkpoint

A corrected weak-provision list of twenty items, each with the accurate rule, its citation, and a one-line memory hook

Week 8

Means of Egress and Accessibility Requirements & Administration, Legal Authority, and Ethics & Existing Buildings, Maintenance, and Unsafe Structures

  • Run two full-length timed practice exams under exam conditions and record section-level scores

  • Review every missed item to the level of the governing rule, not just the correct answer

  • Rehearse ethics and legal-authority scenarios involving appeals, conflicts, and inspection authority

  • Confirm logistics: exam format, permitted references, identification, and timing

  • Finalize a one-page summary sheet of the highest-yield provisions across all eight domains

Your checkpoint

A scored practice-exam log with section breakdowns, a remediation note for each missed domain, and a finished one-page high-yield summary sheet

Milestones

Week 2: Can walk through the full permit and plan-review process from memory, naming the authority and appeal route at each step, and can classify a submittal as complete or deficient without notes

Week 4: Can assign occupancy classifications and determine allowable height and area for a mixed-use building, correctly applying sprinkler and frontage increases, and can produce three code-cited correction notices

Week 6: Can calculate occupant load, egress width, and exit count, verify accessibility clearances, and write a defensible field violation notice and unsafe-structure finding

Week 8: Scores at or above 80 percent on two full-length timed practice exams, with no single domain below 70 percent, and has a completed high-yield summary sheet