PSB LBO: Plan Review and Permit Processing

PSB LBO · Work through your exam, one topic at a time.

All guide sections

Plan Review and Permit Processing

Intake and completeness

  • The review clock generally starts when an application is complete. Jurisdictions usually must notify the applicant in writing of missing items within a set period, and the clock is suspended until those items arrive.
  • Route the set to every discipline: architectural, structural, mechanical/electrical/plumbing, fire protection, accessibility, and land-use/zoning where applicable. Consolidate comments into one response.
  • Verify that plans are sealed and signed by licensed design professionals competent in that discipline, and that revisions are dated and logged.

What the review must confirm

  • Occupancy classification and construction type, then height and area compliance.
  • Means of egress: occupant load, number and width of exits, travel distance, door hardware.
  • Fire-resistance ratings, opening protectives, and active systems.
  • Accessibility of the route, entrances, and toilet rooms.
  • Structural design basis, loads, and geotechnical assumptions.

Issuance and lifecycle

  • A permit authorizes only the work described in the approved documents; it does not authorize a code violation.
  • Permits expire after a defined period of inactivity. Extensions and renewals are discretionary and must be documented.
  • Work begun without a permit draws a stop-work order, after-the-fact review, and often multiplied fees; the burden sits on the owner.
  • A certificate of occupancy follows a satisfactory final inspection. A temporary certificate may carry conditions and a hard expiration.

Worked example

A complete architectural set arrives without structural calculations. The department must issue a written deficiency notice within its stated period; the review clock stops until calculations are submitted. If the applicant pours footings during that suspension, the work is unpermitted - the permit was never effective.

Traps

  • Confusing plan approval with permission to occupy.
  • Letting a conditional approval function as a code modification.
  • Missing that a revision was never routed back to the fire-protection reviewer.