Iron, Biofilm and a Venturi on the Suction Line

RBSE SS Voc Micro-Irrigation Tec · Put your knowledge to work in context.

All case studies

Iron, Biofilm and a Venturi on the Suction Line

A 2 ha mango orchard near Ahmedabad is fed by a borewell. Water analysis shows pH 7.9, TDS 900 mg/L, hardness 300 mg/L as CaCO₃, ferrous iron 2.4 mg/L and fine sand that settles in the filter bowl. The system has a 5 HP submersible, a single 120-mesh screen filter, and a venturi injector plumbed into the pump suction line. After one season the farmer reports four things: the screen needs cleaning every second day and the gauge across it climbs from 0.2 to 0.9 bar within three days; a brown slime coats the inside of the laterals; measured emitter discharge has fallen about 35%; and several laterals in block 3 have no flow at all. He fertigates weekly with 19-19-19 and switches the pump off immediately after injecting. He asks whether a larger screen filter will solve the problem.

1. Explain why a bigger screen filter will not fix this, and specify the filtration train and injection layout you would install.

Read the worked answer

A screen filter is a surface filter with small dirt-holding capacity. It can catch sand grains, but dissolved ferrous iron passes straight through, oxidises on contact with air inside laterals and filters, and forms a floc that blinds the screen and cements onto emitter walls. Making the screen bigger only lengthens the interval between cleanings; it does not remove the iron. The 0.9 bar rise in three days is a symptom of floc loading, and the brown slime plus 35% discharge loss confirms biofilm/iron deposition, not sand.

Specify:

  1. Media (sand) filter as the primary filter, sized for the system flow, with a screen or disc filter downstream as a safety filter.
  2. Oxidation ahead of the media filter (chlorination or aeration with a contact/retention volume) so dissolved iron becomes filterable floc.
  3. Injector moved to the discharge side, downstream of the filters, with a check valve, vacuum relief and backflow prevention, and at least 15–30 m of mainline before the first lateral so the fertiliser mixes before it reaches emitters.
  4. A flush valve at the end of each sub-main.

Injecting on the suction side risks corrosion and erratic dosing and must be corrected first.

2. Give a rehabilitation and treatment programme for the existing system, and say how you would verify that it worked.

Read the worked answer

Sequence matters - treat, then flush, then measure.

  1. Mechanical first: open lateral and sub-main ends and flush at high velocity (target 0.3–0.5 m/s at the lateral end) until the water runs clear; clean the filter and check the sand bed for channelling.
  2. Chlorination to oxidise iron and kill biofilm. Use a shock dose per label/extension guidance (commonly cited in the 50–100 mg/L range held for a few hours) with the system full, then flush every lateral until the chlorine smell is gone. Continuous low-dose (1–2 mg/L) during irrigation is the maintenance option where injections are reliable.
  3. Acidification to dissolve carbonate and iron deposits, targeting roughly pH 4 in the treated water for 30–60 minutes, then flush. Acid and chlorine must never be mixed or injected together.
  4. Block 3 separately: if laterals remain dead after treatment, they are probably beyond recovery - cut open one emitter to confirm and replace only those laterals.

Verification: measure emitter discharge at head, middle and tail of the same lateral before and after (a graduated cylinder and a stopwatch are enough); record the clean-filter ΔP; re-check after two weeks. If discharge returns to within about 10% of nominal and ΔP stays under 0.5 bar, the programme worked.

3. List the safety and operating rules you would insist on for the acid and chlorine programme, and one change to the farmer's fertigation practice.

Read the worked answer

Safety rules:

  • Store acid and chlorine separately, in labelled, closed containers, never in unmarked bottles near the pump.
  • Full PPE: chemical goggles/face shield, acid-resistant gloves, apron, boots; eyewash water at the site.
  • Always add acid to water, never water to acid.
  • Never mix acid and chlorine - it releases chlorine gas. Flush the injection line between products.
  • Inject chemicals downstream of the filters with a check valve and vacuum breaker, and post warning signs at the head.
  • Nobody irrigates or works on the lines while chemicals are in the system; the field is flushed before workers re-enter.

Practice change: the farmer currently stops the pump right after injecting fertiliser, leaving concentrate sitting in the main and laterals. He should finish injection, then run clean water for 20–30 minutes (enough to clear the longest lateral), and only then stop. Fertigation should also be scheduled early in the set, not at the very end, so the nutrient is pushed into the root zone rather than left in the pipe.