Week 1

Fundamentals of Irrigation and Soil-Water-Plant Relationships & Drip Irrigation Design, Installation and Operation

  • Explain soil-water-plant relationships (field capacity, permanent wilting point, available water, MAD, ETc, Kc) in your own words and compute a sample irrigation depth from given soil and crop data

  • Calculate crop water requirement and irrigation interval for at least three crop/soil combinations using ETo and Kc values you look up and cite

  • Identify and label every component of a drip system (head unit, main, submain, laterals, emitters, valves, filters, injection unit) from a written description

  • Compute emitter discharge, application rate, and wetted percentage for a sample lateral layout, showing each step

  • Build a one-page formula sheet covering depth, volume, application rate, and irrigation interval, and solve five practice problems using it

Your checkpoint

A worked problem set (minimum 10 solved numericals with units) covering irrigation depth, ETc, irrigation interval, and drip application rate, plus a one-page formula sheet

Week 2

Drip Irrigation Design, Installation and Operation

  • Design a complete drip layout for a 1-hectare orchard block: choose emitter spacing and discharge, size laterals, submains, and main, and state pipe diameters with justification

  • Calculate total system flow rate, operating pressure requirement, and friction losses through laterals and main using standard head-loss methods

  • Select and size a filter (screen/sand/disc) and a fertigation tank for the designed system, with reasoning tied to water quality assumptions

  • Prepare a bill of quantities and a simple cost estimate for the designed drip system

  • List at least eight commissioning and installation checks (flushing, pressure testing, emitter uniformity test) and explain why each matters

Your checkpoint

A full drip irrigation design report for the 1-hectare block: layout sketch, hydraulic calculations, equipment selection, bill of quantities, and commissioning checklist

Week 3

Micro-Irrigation Systems: Types, Components and Layout & Sprinkler Irrigation Design, Installation and Operation

  • Compare drip, micro-sprinkler, and mini-sprinkler systems on wetted pattern, application rate, clogging risk, energy need, and suitable crops, and match each to five given field scenarios

  • Design a sprinkler layout for a sample field: select nozzle size and spacing, compute application rate and precipitation uniformity, and check against soil intake rate

  • Calculate sprinkler system head and pump duty requirements including elevation, friction, and operating pressure

  • Identify causes of poor uniformity in sprinkler systems (wind, spacing, pressure variation) and state a corrective measure for each

  • Explain layout considerations for both surface and subsurface drip, including depth of placement and salinity concerns

Your checkpoint

A comparison table of drip versus sprinkler options for five field scenarios plus a complete sprinkler design calculation for one sample field

Week 4

Pump Sets, Filtration, Fertigation and Automation & Maintenance, Troubleshooting and Repair of Micro-Irrigation Systems

  • Match pump type (centrifugal, submersible, monoblock) to given water source and head/flow requirements, and read a pump performance curve to select an operating point

  • Diagnose ten written fault scenarios (low pressure, uneven discharge, emitter clogging, filter backwash failure, pump cavitation) and state the likely cause, a test to confirm it, and the repair step

  • Describe a preventive maintenance schedule for filters, emitters, valves, and pumps across a season, with frequency and action for each item

  • Explain fertigation safety and sequencing steps, including injection placement, flushing, and backflow prevention

  • Outline the main components of an automation setup (controller, solenoid valves, sensors) and describe one simple programming scenario

Your checkpoint

A troubleshooting guide of at least 10 fault scenarios (symptom, cause, confirmation test, fix) plus a one-page seasonal preventive maintenance calendar

Week 5

Water Source, Water Quality and Environmental Considerations & Entrepreneurship, Costing, Government Schemes and Customer Service

  • Interpret a water quality test report (pH, EC, hardness, iron, suspended solids) and state its implications for emitter clogging and treatment choice

  • Explain how irrigation scheduling and leaching fraction address salinity buildup, and compute a leaching requirement for a sample case

  • List environmental safeguards for micro-irrigation (preventing runoff, safe chemical handling, disposal of flushed water) and describe one practice for each

  • Prepare a costing sheet for a small drip system covering capital cost, annual operating cost, and simple payback against conventional irrigation

  • Summarize (in your own words, without quoting scheme documents) the categories of government support typically available for micro-irrigation and the documents a farmer usually needs to apply

Your checkpoint

A water quality interpretation note with treatment recommendation and leaching calculation, plus a one-page cost-and-payback sheet for a small drip system

Week 6

Maintenance, Troubleshooting and Repair of Micro-Irrigation Systems & Occupational Safety, Health and Workplace Practices

  • Perform a written emitter uniformity evaluation from given flow measurements and decide whether the system needs cleaning, replacement, or redesign

  • Describe the procedure to locate and repair a leaking lateral, a broken emitter, and a failed valve, step by step

  • List the main occupational hazards in micro-irrigation work (electrical, chemical during fertigation, slips, lifting, confined spaces) and the control measure for each

  • Explain safe handling, storage, and first-aid basics for fertigation chemicals and chlorine treatment

  • State the personal protective equipment required for at least five field tasks and justify each item

Your checkpoint

A field safety and repair procedure sheet covering uniformity evaluation, three repair procedures, and a hazard-control table with PPE requirements

Week 7

Entrepreneurship, Costing, Government Schemes and Customer Service & Practical Skills, Field Demonstration and Project Work & Fundamentals of Irrigation and Soil-Water-Plant Relationships

  • Draft a customer service script for a farmer enquiry about system selection, covering needs assessment, honest limitations, and follow-up

  • Prepare a short field demonstration plan for a micro-irrigation component (filter cleaning, emitter flow check, or fertigation setup) with steps, materials, and safety notes

  • Revisit weak areas from weeks 1-6 by re-solving missed numerical problems and re-explaining concepts aloud

  • Explain how to record and present project work: measurements, observations, calculations, and conclusions in a simple report format

  • Practice explaining one technical concept to a non-technical customer in under two minutes

Your checkpoint

A field demonstration plan and a customer service script, plus a short project report template with one filled-in example

Week 8

Fundamentals of Irrigation and Soil-Water-Plant Relationships & Micro-Irrigation Systems: Types, Components and Layout & Drip Irrigation Design, Installation and Operation & Sprinkler Irrigation Design, Installation and Operation & Pump Sets, Filtration, Fertigation and Automation & Maintenance, Troubleshooting and Repair of Micro-Irrigation Systems & Water Source, Water Quality and Environmental Considerations & Entrepreneurship, Costing, Government Schemes and Customer Service & Occupational Safety, Health and Workplace Practices & Practical Skills, Field Demonstration and Project Work

  • Complete two full-length timed practice tests under exam conditions and score each by domain

  • Review every missed question and write a corrected explanation for each, identifying the underlying concept gap

  • Re-derive the ten most important formulas from memory and check them against your formula sheet

  • Recite the key facts for each domain (component functions, maintenance intervals, safety controls, scheme categories) in a rapid self-quiz

  • Finalize a one-page pre-exam summary sheet limited to facts you have personally verified

Your checkpoint

Two scored practice tests with a written error log and a final one-page summary sheet

Milestones

Week 2: You can independently design a drip system for a 1-hectare block end to end, with hydraulic calculations and a bill of quantities, without referring to a worked example

Week 4: You can diagnose any of ten common micro-irrigation faults from a written symptom description and state the cause, confirmation test, and repair, and you score at least 70% on a self-made quiz covering domains 1-6

Week 6: You can evaluate emitter uniformity from flow data, decide on a corrective action, and list the hazard controls and PPE for five field tasks without notes

Week 8: You score at least 75% on both timed practice tests, with no domain scoring below 60%, and your error log shows every missed item has a written corrected explanation