RBSE SS Voc Plumbing study materials
RBSE SS Voc Plumbing study resources

RBSE SS Voc Plumbing study plan

RBSE SS Voc Plumbing · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Water Supply Systems and Pipe Fitting & Sanitary Fixtures, Drainage and Sewerage Systems

  • Identify and name the components of a direct and an indirect cold-water supply system from a schematic, including storage tank, float valve, distribution pipe, and vent.

  • Compare the properties and joining methods of GI, copper, CPVC, and PPR pipes, and select the right pipe for three given domestic scenarios.

  • Calculate pipe sizes for a simple two-bathroom house using fixture unit values and a provided sizing table.

  • Explain the purpose of an air gap, a vent pipe, and a trap in a drainage system and sketch each in cross-section.

Your checkpoint

A hand-drawn A3 schematic of a two-storey house showing cold-water supply and drainage layout, with a labelled pipe schedule and a one-page sizing calculation.

Week 2

Sanitary Fixtures, Drainage and Sewerage Systems & Water Supply Systems and Pipe Fitting

  • Design a single-stack drainage system for a three-storey building, positioning soil, waste, vent, and anti-siphon pipes correctly.

  • Size a horizontal branch and a main drain using gradient and discharge unit tables.

  • Describe the correct installation sequence for a WC, wash basin, and floor trap, including trap seal depth and fall.

  • Diagnose three common drainage faults (trap siphonage, blocked vent, backfall) from a written description and propose a correction.

Your checkpoint

A written drainage design report (2 pages) with a riser diagram, pipe sizes, gradients, and a fault-diagnosis table for three cases.

Week 3

Plumbing Tools, Materials and Safety Practices & Practical / Workshop Skills Assessment

  • Select and safely use the correct hand tool for cutting, bending, and joining copper, GI, and plastic pipe, and state one safety precaution per tool.

  • Demonstrate the procedure for measuring, cutting, deburring, and soldering a copper elbow joint to a watertight standard.

  • List the personal protective equipment required for five workshop tasks and justify each item.

  • Identify five unsafe workshop practices from a written scenario and state the corrective action for each.

Your checkpoint

A workshop task sheet with a labelled photo or sketch of two completed joints (one soldered, one threaded), a tool-selection table, and a signed safety checklist.

Week 4

Plumbing Drawings, Estimating and Costing & Plumbing Tools, Materials and Safety Practices

  • Read and interpret a plumbing floor plan and riser diagram, extracting pipe sizes, fixture locations, and invert levels.

  • Prepare a material take-off (bill of quantities) for a bathroom from a given drawing, including pipes, fittings, fixtures, and consumables.

  • Calculate the cost of a small plumbing installation using current local rates for labour, materials, and overheads.

  • Apply scale conversion to measure pipe runs from a 1:50 drawing and verify against a written schedule.

Your checkpoint

A priced bill of quantities and cost estimate for a single bathroom, with a drawing take-off sheet and a 10% contingency line.

Week 5

Maintenance, Repair and Leak Detection & Plumbing Code, Environmental and Occupational Health Requirements

  • Describe the procedure for pressure-testing a new water supply installation and state the pass criteria.

  • Locate a hidden leak using at least three methods (acoustic, dye test, meter test, thermal) and explain when each is appropriate.

  • Repair a leaking compression fitting, a soldered joint, and a tap washer, and state the tools and materials needed for each.

  • Identify the code requirements for trap seals, venting, and pipe support spacing from a provided code extract and apply them to a sample layout.

Your checkpoint

A leak-investigation and repair log for two simulated faults, including method chosen, steps taken, test result, and the relevant code clause cited.

Week 6

Plumbing Code, Environmental and Occupational Health Requirements & Maintenance, Repair and Leak Detection

  • Explain the health and environmental requirements for handling lead, asbestos cement, and solvent cements, and state the disposal route for each.

  • Describe the requirements for backflow prevention and cross-connection control in a domestic supply and identify two devices used.

  • Outline the employer and worker duties under occupational health and safety legislation for confined-space entry and working at height.

  • Carry out a risk assessment for a repair job in a occupied house and record five hazards with controls.

Your checkpoint

A completed risk assessment and method statement for a repair in an occupied dwelling, plus a one-page summary of code clauses applied.

Week 7

Practical / Workshop Skills Assessment & Plumbing Drawings, Estimating and Costing

  • Assemble a small pipework rig to a given isometric drawing, maintaining correct levels, gradients, and support spacing.

  • Pressure-test the completed rig and record the test pressure, duration, and any remedial action.

  • Prepare an as-built sketch of the rig and compare material used against the original estimate.

  • Complete a practical job card recording time taken, tools used, and safety checks performed.

Your checkpoint

A completed and pressure-tested pipework rig with an as-built sketch and a variance report against the estimate (within ±10%).

Week 8

Water Supply Systems and Pipe Fitting & Sanitary Fixtures, Drainage and Sewerage Systems & Maintenance, Repair and Leak Detection & Plumbing Code, Environmental and Occupational Health Requirements

  • Answer 60 mixed practice questions across all domains under timed conditions and score at least 75%.

  • Review every incorrect answer and write a one-line reason and the correct fact for each.

  • Recite the key code limits (trap seal depth, vent distance, support spacing, test pressure) from memory.

  • Re-demonstrate one weak practical skill identified in week 7 and record the improvement.

Your checkpoint

A timed mock exam score sheet with a corrected-answer log and a personal weak-topic list for final revision.

Milestones

Week 2: Can size a branch and main drain and sketch a single-stack drainage system without reference notes, scoring at least 8/10 on a self-made quiz.

Week 4: Can produce a priced bill of quantities from a drawing with no missed major item and a total within 15% of a model answer.

Week 6: Can state the code requirements for trap seals, venting, backflow, and support spacing from memory and apply them correctly to a sample layout.

Week 8: Scores at least 75% on the timed mixed mock exam and has a written remediation plan for every topic below 70%.