WBCHSE HS Vocational Construction study materials
WBCHSE HS Vocational Construction study resources

WBCHSE HS Vocational Construction flashcards

WBCHSE HS Vocational Construction · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Modular brick size
A modular brick measures 190 × 90 × 90 mm, giving a nominal size of 200 × 100 × 100 mm after a 10 mm mortar joint.
Initial setting time of OPC
The time from adding water until the cement paste begins to lose plasticity; for ordinary Portland cement it must be at least 30 minutes.
Water-cement ratio
The ratio of mass of water to mass of cement in a mix. Lower ratios give higher strength and durability; typical RCC value is about 0.5.
Slump test
A workability test using a standard cone; the vertical settlement of the concrete is measured in mm. It does not measure strength.
Curing period for OPC
Concrete made with ordinary Portland cement must be kept moist for at least 7 days to allow hydration and develop design strength.
Cover to reinforcement
The clear distance from the outer concrete surface to the nearest steel bar; typically 25–30 mm for slabs and 40 mm for columns.
English bond
A brick bond with alternating courses of headers and stretchers. It is the strongest bond and is used for load-bearing walls.
Flemish bond
A bond in which each course contains alternating headers and stretchers. It gives a better appearance than English bond but is slightly weaker.
Queen closer
A brick cut lengthwise into two halves to complete a bond; it is placed next to the quoin header to make the course even.
Rat-trap bond
A hollow brick bond in which bricks are laid on edge, saving about 25% of bricks and improving thermal insulation of the wall.
Plumb bob use
A pointed weight hung on a string to check verticality of walls, columns, and formwork; it indicates deviation from true vertical.
Spirit level use
A tool with a bubble in a curved vial used to check whether a surface is horizontal or vertical; bubble centred means level.
Needle vibrator
A poker-type internal vibrator inserted into concrete to remove air voids; used for beams, columns, and thick sections.
Personal protective equipment
Safety gear worn on site, including helmet, safety shoes, goggles, gloves, and harness, to protect against injury.
Scale 1:100
One unit on the drawing represents 100 units on the ground; a 10 m wall is drawn 100 mm long on paper.
Hidden line
A dashed line on a drawing showing an edge or object not visible in the current view, such as a concealed beam or pipe.
Centre line
A chain line (long dash, short dash) marking the axis of symmetry of an object, such as the centre of a door or column.
Section drawing
A drawing showing a vertical cut through a building, revealing floor levels, foundation depth, and internal heights.
Mortise-and-tenon joint
A strong carpentry joint where a projecting tenon on one member fits into a rectangular mortise cut in the other member.
Seasoning of timber
Controlled drying of timber to reduce moisture content, preventing warping, shrinkage, and fungal decay before use.
Plywood construction
An odd number of thin wood veneers glued together with the grain of adjacent layers at right angles to each other.
Dovetail joint
An interlocking joint with fan-shaped pins and tails, used for drawer corners because it resists pulling apart.
Gully trap
A sanitary fitting at the junction of a house drain and the public sewer, with a water seal to prevent foul gases entering.
MCB
A miniature circuit breaker that automatically trips and interrupts the circuit on overload or short circuit, protecting wiring and equipment.
Earthing
Connecting the metal body of an electrical appliance to the ground so that fault current flows safely to earth, preventing shock.
Self-cleansing velocity
The minimum flow velocity in a drain, about 0.6 m/s, that keeps solid matter moving and prevents silt deposition in the pipe.
Detailed estimate
An item-wise estimate prepared from measured quantities and current rates, including abstract of cost, for accurate project budgeting.
Centre line method
A quantity method using the total centre-line length of walls multiplied by breadth and depth; half breadth is deducted at junctions.
Rate analysis
The process of determining the unit rate of an item from material, labour, plant, overhead, and profit components.
Critical path
The longest path through a CPM network; activities on it have zero float, and any delay extends the project duration.
Break-even point
The sales volume at which total revenue equals total cost; calculated as fixed cost divided by contribution per unit.
Udyam registration
The online registration for micro, small, and medium enterprises in India, giving access to government schemes and credit support.