WBCHSE HS Vocational Construction study materials
WBCHSE HS Vocational Construction study resources

WBCHSE HS Vocational Construction key terms

WBCHSE HS Vocational Construction · Get comfortable with the vocabulary.

Bulk density

The mass of a material divided by its total volume including the voids inside it, expressed in kg per cubic metre. Used to judge the weight and porosity of aggregates, bricks and timber.

Related: Porosity, Specific gravity of materials
Porosity

The fraction of a material's volume occupied by open or closed pores. Higher porosity usually means more water absorption, lower strength and poorer resistance to frost in bricks and stones.

Related: Water absorption, Bulk density
Water absorption

The amount of water a material takes in when soaked, expressed as a percentage of its dry mass. It indicates durability and suitability of bricks, tiles and stones for exposed work.

Related: Porosity, Efflorescence
Efflorescence

A whitish powdery deposit of soluble salts that appears on the surface of masonry when water evaporates from it. It is unsightly and shows that dampness and salt-bearing materials are present.

Related: Water absorption, Damp proof course
Grading of aggregate

The distribution of particle sizes in a sample of sand, gravel or crushed stone. Well-graded aggregate packs densely, needs less cement paste and gives stronger, more workable concrete.

Related: Fineness modulus, Bulking of sand
Fineness modulus

A single number obtained by adding the cumulative percentages retained on a standard set of sieves and dividing by 100. It compares the coarseness of different sand samples.

Related: Grading of aggregate, Bulking of sand
Bulking of sand

The increase in the volume of moist sand caused by films of water pushing the grains apart. It matters because batching sand by volume when damp leads to short measurement of sand in mortar or concrete.

Related: Grading of aggregate, Mortar mix ratio
Workability

How easily fresh concrete or mortar can be mixed, placed, compacted and finished without segregation. It is commonly assessed by the slump test on site.

Related: Slump test, Water-cement ratio
Water-cement ratio

The mass of water divided by the mass of cement in a concrete mix. Lowering it raises strength and durability but reduces workability, so it is the key control on concrete quality.

Related: Workability, Curing
Slump test

A site test in which fresh concrete is placed in a standard cone, the cone is lifted, and the drop of the concrete is measured. It gives a quick indication of workability and consistency.

Related: Workability, Concrete cube test
Concrete cube test

A laboratory test in which standard cubes are cured and crushed in a compression machine at 7 and 28 days. The crushing stress shows whether the concrete has reached its specified grade strength.

Related: Slump test, Curing
Curing

Keeping concrete or mortar moist and at a suitable temperature after placing so that cement hydration continues. Proper curing for the specified period develops strength, reduces shrinkage cracks and improves durability.

Related: Water-cement ratio, Concrete cube test
Nominal mix

A concrete or mortar mix stated as fixed proportions of cement, fine aggregate and coarse aggregate, such as 1:2:4. It is used for ordinary small works where strength is not tested by design.

Related: Mortar mix ratio, Water-cement ratio
Mortar mix ratio

The stated proportion of cement or lime to sand in a mortar, such as 1:6. Richer mixes give stronger, less permeable joints; leaner mixes are cheaper but weaker.

Related: Nominal mix, English bond
Reinforcement cover

The thickness of concrete between the outer surface of the steel bar and the nearest concrete face. Adequate cover protects steel from corrosion and fire and ensures bond with concrete.

Related: Development length, Formwork
Development length

The length of bar embedment needed to transfer the force in a reinforcing bar safely into the surrounding concrete without the bar pulling out. It depends on bar diameter, grade and concrete strength.

Related: Reinforcement cover, Lap length
Lap length

The overlapping length provided where two reinforcing bars are joined end to end so force passes from one bar to the other. It is specified as a multiple of bar diameter for each concrete grade.

Related: Development length, Bar bending schedule
Formwork

The temporary moulds of timber, plywood or steel that hold fresh concrete in shape until it hardens. Formwork must be strong, rigid, tight against grout loss and easy to strike.

Related: Reinforcement cover, Shuttering
English bond

A brick masonry bond made of alternating courses of stretchers and headers. It is strong and has no continuous vertical joints through the wall, though it needs more facing bricks.

Related: Flemish bond, Queen closer
Flemish bond

A brick bond in which each course contains alternating headers and stretchers. It gives a neat appearance on both faces of a half-brick wall but is weaker than English bond.

Related: English bond, Queen closer
Queen closer

A brick cut lengthwise into two equal halves, used at the end of a header course or beside a quoin to break the vertical joint. It helps bond the corner and keep the courses true.

Related: English bond, Flemish bond
Quoin

The external corner of a wall, usually built with specially chosen or shaped bricks to give strength and a clean edge. Quoins are set out first and act as guides for the rest of the wall.

Related: English bond, Plumb bob
Plumb bob

A small weight hung on a string to give a true vertical line. It is used to check that walls, columns and formwork are vertical and not leaning.

Related: Spirit level, Quoin
Spirit level

A tool with sealed glass vials containing liquid and an air bubble, used to check whether a surface is horizontal or vertical. The bubble centres between the marks when the surface is true.

Related: Plumb bob, Line and pins
Line and pins

A nylon or cotton line stretched between two pins or nails along the face of a wall. It keeps successive courses at a constant height and line during brick or block laying.

Related: Spirit level, English bond
Mason's square

A rigid right-angled tool used to check and set out 90-degree corners in masonry, carpentry and tiling. It is also used to test whether cut ends are square.

Related: Plumb bob, Try square
Try square

A woodworking tool with a fixed blade set at 90 degrees to a stock, used to mark and test square ends and right angles on timber. The stock is held against the reference face.

Related: Mason's square, Mortise and tenon joint
Mortise and tenon joint

A joint in which a projecting tongue (tenon) on one member fits into a matching rectangular hole (mortise) in another. It resists pulling apart and is common in door frames and furniture.

Related: Try square, Halving joint
Halving joint

A carpentry joint made by removing half the thickness from each of two overlapping members so that their faces finish flush. It is used in framing and is often pinned or glued.

Related: Mortise and tenon joint, Seasoning of timber
Seasoning of timber

Controlled drying of timber to reduce its moisture content before use. Properly seasoned wood is lighter, stronger, more stable and less likely to shrink, warp or decay in service.

Related: Halving joint, Bulk density
Scale

The fixed ratio between a distance on a drawing and the real distance it represents, such as 1:100. It lets a drawing show a building or component at a convenient size on paper.

Related: Plan, Elevation
Plan

A drawing showing a building or object as seen from above, cut at a stated level, with walls, openings and fittings in their true relative positions. It is the main drawing used for setting out and estimating.

Related: Elevation, Section
Elevation

A drawing showing the external face of a building or one side of an object, without perspective, giving heights and levels. Elevations show doors, windows, finishes and roof lines.

Related: Plan, Section
Section

A drawing that shows a building or object as if cut by an imaginary vertical plane, revealing internal construction such as floor levels, foundations and roof structure. Cut surfaces are hatched.

Related: Plan, Elevation
Bar bending schedule

A table listing each type of reinforcing bar with its mark, diameter, shape, length, number and total weight. It guides cutting and bending at site and supports steel quantity estimation.

Related: Lap length, Development length
Trap

A plumbing fitting that holds a water seal to stop sewer gases entering a building while allowing waste water to pass. Every fixture except some direct-outlet ones needs a trap.

Related: Vent pipe, Inspection chamber
Vent pipe

A pipe connected to the drainage system that admits air and releases gases above roof level, protecting trap seals from siphonage. It keeps the system at atmospheric pressure.

Related: Trap, Inspection chamber
Inspection chamber

An access point in a drainage run, with a removable cover, where pipes can be inspected, rodded and cleaned. It is placed at changes of direction, junctions and intervals along the drain.

Related: Trap, Vent pipe
Damp proof course

A continuous impervious layer built into a wall near ground level to stop moisture rising by capillary action. It is usually bituminous felt, polythene or a cement-rich mortar layer.

Related: Efflorescence, Water absorption
Earthing

Connecting exposed metal parts of an electrical installation to the general mass of earth through a low-resistance path. It makes protective devices operate and limits shock risk during a fault.

Related: Miniature circuit breaker, Residual current device
Miniature circuit breaker

An automatic switch in a distribution board that trips and breaks the circuit when current exceeds its rating or a short circuit occurs. It can be reset after the fault is cleared.

Related: Earthing, Residual current device
Residual current device

A protective device that trips when it detects a small imbalance between live and neutral currents, indicating leakage to earth. It gives added protection against electric shock.

Related: Earthing, Miniature circuit breaker
Centre line method

An estimating method in which the total length of walls is measured along their centre lines and multiplied by width and depth. It is quick for long walls of the same thickness but needs care at junctions.

Related: Long wall short wall method, Abstract of cost
Long wall short wall method

An estimating method in which walls running in one direction are measured as long walls and cross walls as short walls, adjusting lengths at junctions. It suits buildings with walls of differing thickness.

Related: Centre line method, Abstract of cost
Abstract of cost

A summary sheet that lists each item of work with its quantity, unit rate and amount, then totals the cost. It is prepared from the detailed measurement sheet and supports the tender or estimate.

Related: Centre line method, Contingency
Contingency

A provisional sum included in an estimate to cover unforeseen items or price changes during construction. It is usually a small percentage of the estimated cost and is spent only with approval.

Related: Abstract of cost, Bill of quantities
Bill of quantities

A priced document listing measured items of work with descriptions, quantities and rates, forming part of a contract. Contractors price each item and the total becomes the tendered amount.

Related: Abstract of cost, Contingency
Critical path

The longest sequence of dependent activities through a project network, which fixes the shortest possible project duration. Any delay on it delays completion unless the plan is changed.

Related: Gantt chart, Float
Gantt chart

A bar chart that shows project activities against a calendar, with bars giving start, duration and finish. It is simple to read and useful for progress monitoring and resource planning.

Related: Critical path, Float
Float

The amount of time an activity can be delayed without delaying the project finish or the next activity. Activities on the critical path have zero float.

Related: Critical path, Gantt chart
Safety helmet

A hard hat worn on site to protect the head from falling objects and knocks. It must be worn in designated areas, fit correctly and be replaced after a heavy impact or when damaged.

Related: Personal protective equipment, Scaffold
Personal protective equipment

Items worn by a worker to reduce risk of injury, such as helmet, safety shoes, goggles, gloves, ear protection and high-visibility clothing. It is the last line of defence after hazards are controlled.

Related: Safety helmet, Scaffold
Scaffold

A temporary working platform with supports, standards, ledgers and boards that lets workers reach heights safely. It must be stable, tied to the structure, and fitted with guard rails and toe boards.

Related: Safety helmet, Personal protective equipment
Entrepreneurship

The process of identifying an opportunity, arranging resources and taking calculated risk to start and run a business. In construction it commonly means setting up as a contractor or specialist firm.

Related: Tender, Working capital
Working capital

The money a business needs for day-to-day running, calculated as current assets minus current liabilities. Contractors need enough of it to pay wages and materials before payments are received.

Related: Entrepreneurship, Tender
Tender

A formal offer by a contractor to carry out specified work at stated rates within a stated time and conditions. It is prepared from tender documents and submitted before the closing date.

Related: Bill of quantities, Working capital