WBCHSE HS Vocational Plumbing study materials
WBCHSE HS Vocational Plumbing study resources

WBCHSE HS Vocational Plumbing cheat sheet

WBCHSE HS Vocational Plumbing · Keep the key ideas within reach.

Quick reference

Trade Fundamentals and Safety

  • Plumbing is the trade of installing, maintaining and repairing pipes, fittings and fixtures that convey water, gas and wastes; it is governed in India by the National Building Code and IS 1200 measurement rules.

  • Water flows by gravity from higher to lower head; 1 m of static head equals about 9.81 kPa, and a 10 m head produces roughly 98 kPa (about 1 kg/cm²) at the outlet.

  • Flow rate through a pipe follows Q = A × V; a 15 mm nominal bore pipe at 1.5 m/s carries roughly 0.26 L/s, so pipe sizing must be checked against fixture demand, not assumed.

  • Personal protective equipment for plumbing work: safety helmet, goggles, gloves, steel-toe boots, ear plugs when cutting with a grinder, and a dust mask when chasing walls or cutting AC sheet.

  • Before any excavation, confirm the location of underground electric cables and gas lines; hand-dig within 1 m of marked services, and shore trenches deeper than 1.5 m.

  • Electrical safety: use 230 V hand tools only through an RCCB/ELCB of 30 mA sensitivity; portable tools on wet floors require 110 V site supply or double insulation.

  • Confined-space entry into a manhole or sump requires gas testing for oxygen (19.5–23.5%), hydrogen sulphide and methane, plus a standby person and a retrieval harness.

  • Soldering and gas-cutting require a fire watch; keep a dry-powder extinguisher within 5 m and never use water on live electrical or burning solvent-based adhesives.

  • First aid for a blowlamp burn: cool with clean running water for at least 10 minutes, do not burst blisters, and cover with a sterile non-stick dressing before referral.

Quick reference

Plumbing Materials

  • GI (galvanised iron) pipe is specified by nominal bore (15, 20, 25, 32, 40, 50 mm and above) and by 'medium' or 'heavy' class wall thickness; it is joined by threaded sockets and is used for exposed cold-water lines.

  • PVC-U pipe is for cold water and drainage only; its service temperature limit is about 60 °C, so it is not used on hot-water lines.

  • CPVC handles hot water up to about 93 °C at rated pressure and is joined with solvent cement; it must not be threaded.

  • uPVC SWR (soil, waste, rain) pipe is used for above-ground drainage; fittings are named by angle - 87.5°, 45°, 22.5° bends - because 90° bends are made as 87.5° to preserve the socket wall.

  • Copper tube is graded by wall thickness (Type L, M, K in imperial practice) and joined by capillary solder fittings, compression fittings or press fittings; it is used for hot water and medical gas lines.

  • Asbestos-cement and lead pipes are legacy materials; they are not installed new and must be handled as hazardous waste when removed.

  • Ductile iron (DI) pipe with cement lining is used for underground water mains because of its strength and corrosion resistance; joints are push-on (Tyton) or flanged.

  • Rubber ring (push-fit) joints on SWR pipe rely on a lubricated EPDM gasket, allow thermal movement, and must be inserted to the marked depth line on the spigot.

  • Material selection rule: match the pipe to the medium, temperature and pressure - GI for exposed cold water, CPVC for hot water, uPVC for drainage, DI for buried mains.

Quick reference

Tools and Equipment

  • A pipe wrench grips by serrated jaws that bite harder as torque increases; it is used on threaded pipe and fittings, never on chrome-plated or plastic fittings.

  • A chain wrench or strap wrench is used on polished pipe and large plastic fittings where jaw marks are unacceptable.

  • A pipe vice holds pipe for cutting and threading; the pipe should be clamped close to the cut and rotated to bring the cut line near the jaws.

  • A wheel-type pipe cutter scores and severs metal pipe; the cutter wheel is tightened a quarter-turn per revolution to avoid burring and wheel damage.

  • A ratchet die stock with BSPT dies cuts external threads; standard pipe threads are 1:16 taper (about 55° thread angle) so the joint tightens and seals as it is made up.

  • A threading die must be lubricated with cutting oil, and the stock reversed a half-turn periodically to break chips.

  • A flaring tool makes 45° flares for copper tube flare fittings; a swaging tool expands tube ends for soldered slip joints.

  • A plumb bob and spirit level (600 mm for general work, 1 m for long runs) check verticality and fall; drainage falls are typically 1:40 to 1:80 for 100 mm pipe.

  • A pressure testing pump with a calibrated gauge is used to hydrostatically test installations; a manometer or U-tube measures low pressures and drain-line gradients.

Quick reference

Pipe Fitting

  • BSP thread sizes: 15 mm (1/2") pipe carries a thread of about 20.9 mm outside diameter; 20 mm (3/4") about 26.4 mm; 25 mm (1") about 33.2 mm.

  • Thread engagement rule: 15 mm pipe takes roughly 8–10 full threads, and fittings should leave 2–3 threads exposed after make-up.

  • A union allows a pipe run to be dismantled without cutting; it is installed at the fixture connection or at a valve for maintenance access.

  • An eccentric reducer is installed flat-side-up on horizontal runs to avoid air pockets, and flat-side-down where condensate or sediment must drain.

  • A Y-branch (45°) is preferred over a tee on drainage stacks to promote smooth flow and reduce blockage; tees are used for vent connections.

  • Pipe support spacing: GI pipe up to 25 mm is supported at about 2.0–2.5 m intervals, larger sizes at 3 m; supports must not be spaced so far that the pipe sags and holds water.

  • Allowance for thermal expansion of pipe is about 0.012 mm per metre per °C for steel; a 10 m steel run heated 50 °C expands roughly 6 mm, requiring an expansion loop or offset.

  • Bending rule: the minimum bend radius for copper tube is about 3–4 times the outside diameter when annealed, and much larger when hard-drawn.

  • When joining dissimilar metals, use a dielectric union or isolating bush to prevent galvanic corrosion between copper and GI.

Quick reference

Jointing and Installation

  • Solvent cement jointing of uPVC/CPVC: cut square, deburr, clean with primer, apply cement to both surfaces, insert with a quarter-turn, hold 30 seconds and allow 24 hours before pressure testing.

  • Screwed GI joints are sealed with PTFE tape (2–3 turns in the direction of thread) or jointing compound; tape is wound clockwise on a right-hand thread so it is not unwound during make-up.

  • Soldered copper capillary joints need clean, fluxed surfaces, a heat source applied away from the fitting mouth, and solder drawn in by capillary action until a fillet appears.

  • Compression fittings seal by an olive (ferrule) crushed onto the tube; they must be tightened about 1–1.5 turns past finger-tight and are not reusable indefinitely.

  • Flanged joints use a gasket matched to the medium (rubber, CAF, spiral wound) and bolts tightened in a cross pattern in stages to avoid uneven gasket loading.

  • Drainage pipe installation requires a continuous fall in the direction of flow, with 100 mm pipe laid at about 1:60 to 1:80 and 50 mm branch waste at about 1:40.

  • Hydrostatic test: fill the installation, expel air, pressurise to 1.5 times working pressure (or as specified) and hold for at least 1 hour; a drop in gauge with no visible leak indicates trapped air or a leak.

  • Every fixture trap must have a water seal of 50–75 mm, and the trap must be accessible through a screwed cap for cleaning.

  • Vertical stacks must be carried up full bore as a vent above the highest fixture connection and terminated with a cowl or wire mesh at least 0.6 m above the roof.

Quick reference

Sanitary Fixtures and Drainage Systems

  • A water closet requires a flush volume of about 6 L in modern dual-flush cisterns (full flush 6 L, reduced flush 3 L); older single-flush cisterns use 9–10 L.

  • Wash basin, sink and urinal waste pipes are 32–50 mm; a WC soil connection is 100 mm; a floor trap is 50–75 mm with a 50 mm seal.

  • The soil stack carries WC discharge, the waste stack carries sink and basin discharge, and the vent stack equalises pressure; a combined system uses one stack for both.

  • Two-pipe drainage systems separate soil and waste water; a one-pipe system collects both in one stack with each fixture individually trapped and vented.

  • Drainage gradients: 50 mm pipe 1:40, 75 mm 1:60, 100 mm 1:80, 150 mm 1:100 - steeper than this causes liquid to run ahead of solids.

  • A gully trap receives waste from kitchen and bathroom and includes a water seal; it must be placed outside the building and connected to the drain through a inspection chamber.

  • An inspection chamber is provided at every change of direction, at junctions, and at intervals not exceeding about 15 m on straight runs for access and rodding.

  • A manhole is required at the connection to the public sewer and at intervals of about 30 m on straight runs; it has steps and a cover rated for the traffic load above.

  • Anti-siphonage: a vent pipe or an air admittance valve prevents trap seals being siphoned by pressure fluctuations in the stack.

Quick reference

Water Supply Systems and Storage

  • A direct (upfeed) system supplies fixtures from the mains pressure; an indirect (downfeed) system pumps to an overhead tank and distributes by gravity.

  • Overhead tank capacity rule of thumb: 100–150 L per person per day for domestic use; the tank should hold at least one day's demand and be sized to the number of occupants.

  • Tank outlet must be at least 50 mm above the tank floor and fitted with a strainer; the tank needs an overflow, a washout, a vent and a lockable cover.

  • A float valve (ball cock) controls filling; its inlet should discharge above the overflow level with an air gap to prevent backflow.

  • Static head at a fixture equals the vertical height from the tank water level to the fixture outlet; 1 m of head gives about 9.81 kPa, and 10 m gives about 98 kPa.

  • Minimum residual pressure at a fixture is typically 20–30 kPa; excessive pressure above about 500 kPa requires a pressure-reducing valve.

  • Water demand for a dwelling is estimated from fixture units: a WC about 3 fixture units, a wash basin 1, a sink 2, a shower 2 - total fixture units size the supply pipe.

  • A sump and booster pump set is used where mains pressure is inadequate; the pump must be protected by a dry-run cut-out and a non-return valve on the suction line.

  • Storage tanks must be cleaned and disinfected periodically; chlorination at about 1–2 mg/L free chlorine with 30 minutes contact time is a common disinfection dose.

Quick reference

Maintenance, Repair and Leak Detection

  • A visible leak is located by isolating sections with valves; a pressure gauge on an isolated section that loses pressure indicates a leak within that section.

  • A concealed leak in a wall or floor often shows as damp patches, paint blistering, a jump in the water meter with all taps closed, or sound transmitted through the pipe.

  • Acoustic leak detection uses a listening stick or electronic ground microphone to find the loudest leak noise; it works best at night when background noise is low.

  • A water meter test: close all outlets, note the meter reading, wait 15–30 minutes, and re-read - any movement indicates an undetected leak or a passing float valve.

  • Frozen or burst pipe repair sequence: shut off supply, drain the section, cut out the damaged part, and fit a slip coupling or repair clamp with new gaskets.

  • A leaking threaded joint is repaired by dismantling, cleaning old tape or compound, re-taping with 2–3 turns of PTFE and remaking; over-tightening splits sockets.

  • A running WC is usually a perished flush valve washer or a faulty ball cock; a dye test in the cistern shows whether water passes into the pan.

  • A blocked drain is cleared with a plunger for a local trap, a drain snake or rod for a branch, and a high-pressure jetter for a main; jetting pressure for uPVC should not exceed about 100 bar.

  • Preventive maintenance schedule: inspect tanks and clean every 6 months, test backflow devices annually, exercise isolating valves every 6 months, and check exposed pipe supports yearly.

Quick reference

Estimating, Costing and Documentation

  • Measurement of plumbing work follows IS 1200 (Part 19 for water supply, drainage and sanitary fittings); pipe lengths are measured along the centre line of the pipe, including fittings but excluding the pipe inside the fitting.

  • Pipe work is measured in running metres by nominal bore, and fittings are counted separately by type and size; deductions are made for openings above the specified area.

  • A rate analysis for a pipe run = cost of pipe per metre + cost of fittings apportioned per metre + labour + wastage + contractor's overhead and profit.

  • Wastage allowance in estimates is typically 2–5% on pipe and 5–10% on fittings and consumables such as solvent cement and PTFE tape.

  • Labour output for GI pipe work is roughly 6–10 m per plumber per day for exposed runs; concealed and chase work is slower and must be priced higher.

  • A bill of quantities (BOQ) lists item description, unit, quantity and rate; the tender is compared on total amount, but rates must be checked for unbalanced pricing.

  • A bar bending schedule is not used in plumbing; instead a pipe schedule lists size, material, length, fittings and support spacing for each run.

  • Variation orders must be recorded in writing with quantity, rate and approval before the work is executed, otherwise the contractor may not be paid.

  • Retention money is typically 5–10% of each bill and is released after the defect liability period, usually 6–12 months after completion.

Quick reference

Entrepreneurship and Employability Skills

  • A plumbing contractor must register for GST if annual turnover exceeds the threshold (₹20 lakh for services in most states), and must hold a trade licence and, where required, a PWD or municipal contractor registration.

  • A simple break-even calculation: fixed monthly costs ÷ (average job price − variable cost per job) = number of jobs needed per month to break even.

  • A quotation must state scope, materials with brand and grade, rate, taxes, payment terms, warranty period and exclusions; verbal estimates are not enforceable.

  • Working capital for a plumbing business covers wages, material purchases and tools before payment is received; 30–60 days of operating cost is a common minimum.

  • Statutory obligations for a small contractor include EPF and ESI for eligible employees, labour licence where required, and payment of minimum wages.

  • A job card or work order records site address, scope, materials issued, labour hours and customer signature; it is the primary evidence for billing and disputes.

  • Customer-handling rule: confirm the complaint, quote before starting, protect the work area, test after repair, and leave a written bill with a warranty note.

  • Employability skills valued in plumbing: reading drawings and specifications, measuring accurately, safe work habits, teamwork, and clear spoken and written communication with clients.

  • Digital tools used by plumbing enterprises include WhatsApp for job scheduling, UPI for collection, and simple spreadsheet or app-based billing for GST invoices.

Quick reference

Practical Workshop and Project Work

  • Workshop sequence for a threaded joint: measure and mark, cut with a pipe cutter, ream the burr, clamp in a vice, cut threads with a die stock, test-fit the fitting, apply PTFE tape and make up.

  • Reaming after cutting removes the internal burr that would otherwise raise flow resistance and trap sediment; the reamer is turned clockwise with light pressure.

  • A cutting list is prepared before fabrication, grouping identical lengths to minimise waste; each piece is marked with its position number to match the drawing.

  • A simple project such as a wash-basin connection includes: supply pipe with stop cock, 15 mm connection to the tap, 32 mm waste pipe, P-trap with 50 mm seal, and connection to the floor trap.

  • Testing after fabrication: blank off open ends, fill with water, apply test pressure, inspect all joints, and record the test on a signed test certificate.

  • Isometric drawings of plumbing installations use standard symbols: circle with cross for a floor trap, square for a tank, dashed line for concealed pipe, and arrow for flow direction.

  • Workshop safety check before starting: inspect tool handles for cracks, check that the grinder guard is in place, confirm the fire extinguisher is charged, and clear the work area of trip hazards.

  • Final inspection checklist: pipe alignment and level, support spacing, correct fall on drainage, trap seals present, all joints leak-free, and identification of valves and tanks.