WBCHSE HS Vocational Plumbing study materials
WBCHSE HS Vocational Plumbing study resources

WBCHSE HS Vocational Plumbing study plan

WBCHSE HS Vocational Plumbing · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Pipe Fitting, Jointing and Installation & Plumbing Materials, Tools and Equipment

  • Identify and name at least 12 pipe fittings (elbow, tee, reducer, union, coupling, cap, cross, bushing, nipple, bend, plug, flange) from a mixed box without reference

  • Sketch and label the parts of GI, PVC, CPVC and copper pipe jointing methods in a notebook

  • Demonstrate cutting and reaming a GI pipe square within 2 mm using a pipe cutter and reamer

  • List five PPE items and three workshop safety rules, and state the correct action for a gas leak and an electrical shock in the workshop

Your checkpoint

A labelled fitting-identification chart of 12 fittings plus a signed 1-page safety checklist kept in the workbook

Week 2

Pipe Fitting, Jointing and Installation & Plumbing Materials, Tools and Equipment

  • Thread a 15 mm and 20 mm GI pipe with a die set to produce 10 to 12 threads of correct taper without cross-threading

  • Assemble a leak-free GI joint using thread sealant or teflon tape and test it at line pressure

  • Make solvent-cemented PVC joints on 25 mm pipe with correct application of primer and cement and the specified curing time

  • Select the right tool (pipe wrench, adjustable spanner, hacksaw, file, die set, flaring tool) for five given jobs and justify each choice

Your checkpoint

Two leak-tested practice assemblies (one threaded GI, one solvent-cemented PVC) photographed and described in the workbook with pressure-test results

Week 3

Sanitary Fixtures and Drainage Systems & Pipe Fitting, Jointing and Installation

  • Identify and explain the function of WC pan, wash basin, sink, floor trap, gully trap, P-trap, S-trap, vent pipe and inspection chamber

  • Calculate the correct slope for a 100 mm horizontal drain branch over a given run using the 1:40 to 1:60 guidance and state the reason for the slope

  • Draw a single-line drainage layout for a two-bathroom house showing soil, waste, vent and inspection chamber positions

  • Explain the purpose of water seal, trap seal depth and anti-siphonage ventilation in your own words

Your checkpoint

A hand-drawn single-line drainage layout for a two-bathroom house with all traps, vents and the inspection chamber labelled and slope values written on each branch

Week 4

Water Supply Systems and Storage & Trade Fundamentals and Safety

  • Compare overhead tank, underground sump and direct municipal supply on pressure, contamination risk and cost in a short written table

  • Size a cold-water distribution pipe run for a three-tap house using fixture unit or demand guidance and record the reasoning

  • Install a float valve and an air gap in a model overhead tank setup and verify shut-off at the design level

  • State the recommended free chlorine residual and the standard disinfection procedure for a new storage tank

Your checkpoint

A one-page water supply scheme for a three-tap house with tank capacity calculated in litres, pipe sizes marked and a written disinfection procedure

Week 5

Maintenance, Repair and Leak Detection & Sanitary Fixtures and Drainage Systems

  • Locate and repair a concealed leak in a practice line using a listening stick or visual inspection, documenting the steps taken

  • Replace a leaking tap washer, a float valve and a WC flush siphon mechanism within 20 minutes each

  • Clear a blocked P-trap and a floor trap and explain the difference between a blockage and a venting fault

  • Prepare a preventive maintenance checklist covering monthly, quarterly and annual tasks for a household plumbing system

Your checkpoint

A completed repair log of three real or simulated faults with cause, action taken, time taken and a one-page preventive maintenance checklist

Week 6

Estimating, Costing and Documentation & Entrepreneurship and Employability Skills

  • Measure a small bathroom from a sketch and prepare a material take-off listing pipe lengths, fittings, fixtures and consumables with quantities

  • Price the take-off using current local rates and produce a quotation with labour, material, overhead and a stated margin

  • Draft a simple work order and a completion certificate template with the fields a customer expects

  • Explain in writing how to register a small plumbing service business and list three ways to find the first customers

Your checkpoint

A complete quotation for a bathroom plumbing job with take-off sheet, rates, labour, margin and a matching work order template

Week 7

Practical Workshop and Project Work & Trade Fundamentals and Safety

  • Execute a full small project end to end: layout, cutting, jointing, fixture fixing and pressure testing within the time limit

  • Inspect your own work against a 10-point quality checklist covering alignment, slope, leak tightness, support spacing and finish

  • Demonstrate correct use of hand tools and one power tool with the safety guard in place and describe the residual risk

  • Record the project in a step-by-step log with photographs and a short reflection on what went wrong and how it was corrected

Your checkpoint

A finished practice project (for example a two-tap wash area with a floor trap) plus a 10-point self-inspection sheet and a photo log

Week 8

Pipe Fitting, Jointing and Installation & Sanitary Fixtures and Drainage Systems & Water Supply Systems and Storage

  • Revise the heaviest domains using a personal error log of every mistake made in weeks 1 to 7 and re-solve each one

  • Answer at least 60 mixed practice questions across all nine domains under timed conditions and review every wrong answer

  • Recite the key formulas and rules (slope, tank capacity, trap seal depth, thread count, curing times) from memory

  • Complete one full mock paper and record the score and the two weakest areas for final revision

Your checkpoint

A timed mock paper score sheet plus a final one-page revision card of formulas, rules and the top five recurring mistakes

Milestones

Week 2: Can thread and joint both GI and PVC pipe and produce a leak-free assembly at line pressure without supervision

Week 4: Can draw a complete drainage layout and a water supply scheme for a small house with correct slopes, pipe sizes and tank capacity

Week 6: Can produce a priced quotation and work order for a bathroom job from your own measurements

Week 8: Score at least 60 percent on a timed mixed mock paper and have a written list of the two weakest domains with a revision action for each