WBCHSE HS Vocational Plumbing study plan
WBCHSE HS Vocational Plumbing · Give each week a clear focus.
8 weeks · About 7 hours per week
Pipe Fitting, Jointing and Installation & Plumbing Materials, Tools and Equipment
Identify and name at least 12 pipe fittings (elbow, tee, reducer, union, coupling, cap, cross, bushing, nipple, bend, plug, flange) from a mixed box without reference
Sketch and label the parts of GI, PVC, CPVC and copper pipe jointing methods in a notebook
Demonstrate cutting and reaming a GI pipe square within 2 mm using a pipe cutter and reamer
List five PPE items and three workshop safety rules, and state the correct action for a gas leak and an electrical shock in the workshop
Your checkpoint
A labelled fitting-identification chart of 12 fittings plus a signed 1-page safety checklist kept in the workbook
Pipe Fitting, Jointing and Installation & Plumbing Materials, Tools and Equipment
Thread a 15 mm and 20 mm GI pipe with a die set to produce 10 to 12 threads of correct taper without cross-threading
Assemble a leak-free GI joint using thread sealant or teflon tape and test it at line pressure
Make solvent-cemented PVC joints on 25 mm pipe with correct application of primer and cement and the specified curing time
Select the right tool (pipe wrench, adjustable spanner, hacksaw, file, die set, flaring tool) for five given jobs and justify each choice
Your checkpoint
Two leak-tested practice assemblies (one threaded GI, one solvent-cemented PVC) photographed and described in the workbook with pressure-test results
Sanitary Fixtures and Drainage Systems & Pipe Fitting, Jointing and Installation
Identify and explain the function of WC pan, wash basin, sink, floor trap, gully trap, P-trap, S-trap, vent pipe and inspection chamber
Calculate the correct slope for a 100 mm horizontal drain branch over a given run using the 1:40 to 1:60 guidance and state the reason for the slope
Draw a single-line drainage layout for a two-bathroom house showing soil, waste, vent and inspection chamber positions
Explain the purpose of water seal, trap seal depth and anti-siphonage ventilation in your own words
Your checkpoint
A hand-drawn single-line drainage layout for a two-bathroom house with all traps, vents and the inspection chamber labelled and slope values written on each branch
Water Supply Systems and Storage & Trade Fundamentals and Safety
Compare overhead tank, underground sump and direct municipal supply on pressure, contamination risk and cost in a short written table
Size a cold-water distribution pipe run for a three-tap house using fixture unit or demand guidance and record the reasoning
Install a float valve and an air gap in a model overhead tank setup and verify shut-off at the design level
State the recommended free chlorine residual and the standard disinfection procedure for a new storage tank
Your checkpoint
A one-page water supply scheme for a three-tap house with tank capacity calculated in litres, pipe sizes marked and a written disinfection procedure
Maintenance, Repair and Leak Detection & Sanitary Fixtures and Drainage Systems
Locate and repair a concealed leak in a practice line using a listening stick or visual inspection, documenting the steps taken
Replace a leaking tap washer, a float valve and a WC flush siphon mechanism within 20 minutes each
Clear a blocked P-trap and a floor trap and explain the difference between a blockage and a venting fault
Prepare a preventive maintenance checklist covering monthly, quarterly and annual tasks for a household plumbing system
Your checkpoint
A completed repair log of three real or simulated faults with cause, action taken, time taken and a one-page preventive maintenance checklist
Estimating, Costing and Documentation & Entrepreneurship and Employability Skills
Measure a small bathroom from a sketch and prepare a material take-off listing pipe lengths, fittings, fixtures and consumables with quantities
Price the take-off using current local rates and produce a quotation with labour, material, overhead and a stated margin
Draft a simple work order and a completion certificate template with the fields a customer expects
Explain in writing how to register a small plumbing service business and list three ways to find the first customers
Your checkpoint
A complete quotation for a bathroom plumbing job with take-off sheet, rates, labour, margin and a matching work order template
Practical Workshop and Project Work & Trade Fundamentals and Safety
Execute a full small project end to end: layout, cutting, jointing, fixture fixing and pressure testing within the time limit
Inspect your own work against a 10-point quality checklist covering alignment, slope, leak tightness, support spacing and finish
Demonstrate correct use of hand tools and one power tool with the safety guard in place and describe the residual risk
Record the project in a step-by-step log with photographs and a short reflection on what went wrong and how it was corrected
Your checkpoint
A finished practice project (for example a two-tap wash area with a floor trap) plus a 10-point self-inspection sheet and a photo log
Pipe Fitting, Jointing and Installation & Sanitary Fixtures and Drainage Systems & Water Supply Systems and Storage
Revise the heaviest domains using a personal error log of every mistake made in weeks 1 to 7 and re-solve each one
Answer at least 60 mixed practice questions across all nine domains under timed conditions and review every wrong answer
Recite the key formulas and rules (slope, tank capacity, trap seal depth, thread count, curing times) from memory
Complete one full mock paper and record the score and the two weakest areas for final revision
Your checkpoint
A timed mock paper score sheet plus a final one-page revision card of formulas, rules and the top five recurring mistakes
Milestones
Week 2: Can thread and joint both GI and PVC pipe and produce a leak-free assembly at line pressure without supervision
Week 4: Can draw a complete drainage layout and a water supply scheme for a small house with correct slopes, pipe sizes and tank capacity
Week 6: Can produce a priced quotation and work order for a bathroom job from your own measurements