- Static head pressure
- Pressure at a point due to the height of water above it. One metre of head equals about 9.81 kPa, so a 10 m head gives roughly 98 kPa.
- Confined space entry test
- Before entering a manhole, test for oxygen between 19.5 and 23.5 percent, and for hydrogen sulphide and methane. Use a standby person and harness.
- Nominal bore
- The standard size label for a pipe, such as 15, 20, 25 or 32 mm. It is close to, but not exactly, the internal diameter and fixes the thread size.
- CPVC versus uPVC
- CPVC withstands hot water up to about 93 degrees Celsius and is solvent-cemented. uPVC is for cold water and drainage only, limited to about 60 degrees.
- Ductile iron pipe use
- A strong, cement-lined pipe used for buried water mains. Joints are push-on or flanged, and it resists external loading and corrosion better than thin-wall pipe.
- Pipe wrench use limit
- A pipe wrench grips threaded steel pipe with serrated jaws. It must not be used on chrome-plated fittings or plastic, which it crushes and marks; use a strap wrench there.
- Pipe cutter technique
- A wheel cutter scores metal pipe and severs it. Tighten the wheel about a quarter turn per revolution and ream the burr afterwards to keep the bore clear.
- BSP taper thread
- Standard pipe thread with about a 55 degree angle and 1 in 16 taper. The taper makes the joint tighten and seal as it is screwed together.
- Union fitting purpose
- A fitting with three parts that lets a pipe run be disconnected without cutting. It is placed near valves and fixtures so maintenance is possible.
- Y-branch versus tee
- On drainage stacks a 45 degree Y-branch gives smoother flow and fewer blockages. A tee is used mainly for vent connections where flow is not the issue.
- Solvent cement procedure
- Cut square, deburr, clean with primer, apply cement to both surfaces, insert with a quarter turn, hold 30 seconds, and wait 24 hours before pressure testing.
- PTFE tape direction
- Wind two to three turns clockwise on a right-hand thread, in the direction the fitting turns, so making up the joint tightens the tape instead of unwinding it.
- Hydrostatic pressure test
- Fill the installation, expel air, pressurise to 1.5 times working pressure, and hold for at least one hour. A gauge drop with no visible leak means trapped air or a leak.
- Trap water seal
- The depth of water held in a fixture trap that blocks sewer gas. It must be 50 to 75 mm and the trap must have an accessible cleaning cap.
- One-pipe drainage system
- A system where soil and waste water from all fixtures discharge into a single stack. Each fixture has its own trap and vent connection to protect the seal.
- Inspection chamber spacing
- An access chamber placed at every change of direction, at junctions, and at intervals not exceeding about 15 metres on straight drain runs for rodding.
- Overhead tank capacity rule
- Allow about 100 to 150 litres per person per day for domestic use, and size the tank to hold at least one day of demand for the occupants.
- Air gap on tank inlet
- The float valve inlet must discharge above the overflow level with a clear gap, so backflow cannot contaminate the supply if pressure is lost.
- Fixture unit method
- A way to size supply pipes. Each fixture is given units, such as 3 for a WC and 1 for a basin, and the total sets the pipe size.
- Meter leak test
- Close all outlets, note the water meter reading, wait 15 to 30 minutes, then re-read. Any movement shows an undetected leak or a passing float valve.
- Acoustic leak detection
- Finding a hidden leak by listening with a stick or ground microphone for the loudest noise. It works best at night when background noise is lowest.
- Running WC diagnosis
- A pan that keeps running usually has a perished flush valve washer or a faulty ball cock. A dye test in the cistern shows water passing into the pan.
- Centre-line measurement rule
- Plumbing pipe work is measured along the centre line of the pipe, including fittings, but the pipe length inside a fitting is not measured separately.
- Rate analysis for pipe work
- Pipe cost per metre plus fittings apportioned per metre plus labour plus wastage plus overhead and profit. This gives the rate entered in the bill of quantities.
- Retention money
- A percentage, usually 5 to 10, held back from each bill and released after the defect liability period, commonly 6 to 12 months after completion.
- Break-even job count
- Fixed monthly costs divided by the difference between average job price and variable cost per job. The result is the number of jobs needed each month to break even.
- GST registration threshold
- In most Indian states a service provider must register for GST once annual turnover exceeds 20 lakh rupees. Registration is needed to issue tax invoices.
- Job card contents
- A record of site address, scope, materials issued, labour hours and customer signature. It is the main evidence for billing and for settling disputes.
- Reaming after cutting
- Removing the internal burr left by a pipe cutter. The reamer is turned clockwise with light pressure; the burr would otherwise raise flow resistance and trap sediment.
- Cutting list purpose
- A prepared list of all pipe lengths grouped by identical size, made before fabrication to reduce waste. Each piece is marked to match the drawing.
- Wash basin connection set
- Includes a 15 mm supply with stop cock, a 32 mm waste pipe, a P-trap with 50 mm seal, and a connection to the floor trap.
- Workshop pre-start safety check
- Inspect tool handles for cracks, confirm the grinder guard is fitted, check the fire extinguisher is charged, and clear the work area of trip hazards before starting.