InterNACHI HEA study materials
InterNACHI HEA study resources

InterNACHI HEA study plan

InterNACHI HEA · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Building Science Fundamentals and Heat Transfer

  • Define conduction, convection, and radiation in your own words and give one building-envelope example of each

  • Calculate U-factor from R-value and compute heat flux through a wall assembly for three different insulation levels

  • Explain the three modes of moisture movement (bulk, capillary, vapor diffusion) and rank them by typical magnitude in a wall

  • Draw and label the stack effect, wind effect, and mechanical imbalance on a simple section sketch, noting pressure direction at top and bottom

  • Solve five practice problems converting between R-value, U-factor, and BTU/h·ft²·°F

Your checkpoint

A one-page formula sheet plus 10 worked heat-loss and psychrometric calculations with answers checked

Week 2

Building Science Fundamentals and Heat Transfer & Building Envelope Assessment (Insulation, Air Sealing, Windows and Doors)

  • Describe thermal bridging at studs, plates, and rim joists and estimate the effective R-value penalty for a wood-frame wall

  • Identify the four control layers (water, air, vapor, thermal) and state where each belongs in a cold-climate wall assembly

  • Compare batt, blown-in, rigid foam, and spray foam on installed R-value per inch, air-sealing ability, and moisture risk

  • Locate the condensing plane in a wall given indoor/outdoor temperature and dew point, and explain how a vapor retarder changes it

  • List the common air-leakage paths in a house from attic to foundation and rank them by likely impact

Your checkpoint

Annotated wall-section diagram for one heating-climate and one cooling-climate assembly showing all four control layers and the condensing plane

Week 3

Building Envelope Assessment (Insulation, Air Sealing, Windows and Doors)

  • Evaluate window performance using U-factor, SHGC, VT, and air leakage ratings, and explain which matters in which climate

  • Distinguish window replacement from storm windows, interior panels, and air sealing, and state the cost-effectiveness tradeoffs

  • Diagnose common door and window air-leakage problems (weatherstripping, thresholds, sash locks, framing gaps) and prescribe fixes

  • Explain how to inspect and air-seal an attic plane, rim joist, and cantilever without creating moisture or combustion-air problems

  • Practice describing envelope defects to a client in plain language without overstating savings

Your checkpoint

A 15-item envelope defect checklist with the likely cause and recommended remedy for each item

Week 4

HVAC Systems, Combustion Safety, and Ventilation

  • Trace the combustion appliance zone concept and explain why a blower door or exhaust fan can backdraft a naturally drafting appliance

  • Interpret combustion analyzer readings for O2, CO, CO2, stack temperature, and draft, and identify when readings indicate a problem

  • Explain the difference between spillage, backdrafting, and flame roll-out, and list the conditions that cause each

  • Describe the inspection sequence for a gas furnace, water heater, and vent connector, including draft verification and spillage testing

  • State the roles of CO alarms, UL 2034 listing, and manufacturer instructions in a combustion safety response

Your checkpoint

A written combustion safety procedure with pass/fail thresholds and the required action for each failure condition

Week 5

HVAC Systems, Combustion Safety, and Ventilation & Blower Door and Duct Leakage Testing, Diagnostic Tools

  • Compare exhaust-only, supply-only, balanced, HRV, and ERV ventilation strategies on cost, climate suitability, and pressure effects

  • Size a ventilation system to ASHRAE 62.2 using floor area and bedroom count, and show the calculation

  • Set up a blower door correctly: prepare the house, establish baseline pressure, choose the right range and configuration, and record data

  • Convert CFM50 to ACH50 and estimate natural infiltration using a documented method, stating the assumptions

  • Explain duct leakage testing setup and interpret total, exterior, and to-outside leakage results

Your checkpoint

A completed blower door and duct leakage data sheet with calculations for ACH50, estimated natural infiltration, and a 62.2 ventilation target

Week 6

Blower Door and Duct Leakage Testing, Diagnostic Tools

  • Explain the operating principle and correct use of infrared thermography, including emissivity, reflectivity, and Delta-T requirements

  • Describe when to use a pressure pan, smoke pencil, or theatrical fog to locate leaks, and interpret each result

  • List the limits of blower door testing and explain why a single ACH50 number does not locate or prioritize leaks

  • Identify common sources of diagnostic error (wind, stack effect, temperature drift, gauge calibration, hose placement) and how to control them

  • Practice interpreting a thermogram described in text and state what is and is not provable from it

Your checkpoint

A diagnostic decision table matching eight field symptoms to the tool, test, and interpretation that resolves them

Week 7

Energy Modeling, Utility Bill Analysis, and Prioritizing Improvements

  • Read a utility bill and separate base load from seasonal load, then compute annual consumption and cost per square foot

  • Compare billed consumption against a simple energy model and explain the main sources of divergence

  • Build a prioritized improvement list using savings, cost, payback, and risk, and justify the ranking

  • Explain why measure interaction matters, such as how air sealing changes duct and ventilation performance

  • Identify when modeling uncertainty is too high to promise a specific savings figure

Your checkpoint

A one-page prioritized retrofit plan for a hypothetical house with estimated savings, cost, and payback for each measure

Week 8

Energy Modeling, Utility Bill Analysis, and Prioritizing Improvements & Reporting, Client Communication, Program Standards, and Professional Ethics

  • Structure a written assessment report with scope, methods, findings, limitations, and prioritized recommendations

  • Explain test results and limitations to a client in plain language, including what was not inspected

  • Apply ethical rules on conflicts of interest, disclosure of referral relationships, data handling, and avoiding overstated claims

  • Map your report against common program and standard requirements for documentation and quality assurance

  • Review your weakest two domains and close remaining gaps with targeted practice

Your checkpoint

A complete mock assessment report for a hypothetical home plus a 10-question self-test scored at 80% or better

Milestones

Week 2: Can compute U-factor, heat flux, and effective wall R-value from scratch and explain the condensing plane without notes

Week 4: Can state combustion analyzer thresholds and the correct response to spillage or elevated CO, and score 80% or better on a self-written combustion safety quiz

Week 6: Can convert CFM50 to ACH50, size a 62.2 ventilation target, and explain the limits of a blower door number, all without reference material

Week 8: Mock report is complete and defensible, and the combined self-test score across all six domains is 80% or better