InterNACHI Wind Mitigation study materials
InterNACHI Wind Mitigation study resources

InterNACHI Wind Mitigation cheat sheet

InterNACHI Wind Mitigation · Keep the key ideas within reach.

Quick reference

Introduction

  • Wind mitigation inspection documents features that reduce wind damage for insurance premium credits; it is not a home inspection or code compliance check.

  • The inspection form used in Florida is the Uniform Mitigation Verification Inspection Form (OIR-B1-1802); other states may use different forms.

  • Inspectors must be qualified per state requirements; in Florida, licensed home inspectors, contractors, engineers, and architects may perform them.

  • The report must be signed and dated by the inspector, with photos verifying key features; falsifying information is fraud.

  • Mitigation features include roof covering, roof deck attachment, roof-to-wall connection, roof geometry, secondary water resistance, and opening protection.

  • Inspections are typically requested by homeowners seeking insurance discounts; the insurer sets the credit amounts.

  • Inspectors must not recommend repairs or suggest upgrades; only report existing conditions.

  • The form has sections for building code, roof age, permit information, and inspector credentials.

Quick reference

Buildings and wind

  • Wind pressure on a building increases with the square of wind speed: dynamic pressure q = 0.00256 × V² (psf, V in mph).

  • Wind loads are both inward (pressure on windward walls) and outward (suction on leeward walls and roof).

  • Roofs experience uplift due to negative pressure; corners and edges have higher suction than the field.

  • Openings in the envelope allow internal pressurization, which can double the net uplift on roofs.

  • Continuous load path from roof to foundation is critical; weak links (e.g., toe-nailed connections) fail first.

  • Wind-driven rain can penetrate gaps and cause water damage even if the structure survives.

  • Debris impact can breach glazing or walls, leading to pressurization and progressive failure.

  • Terrain and exposure category affect wind speed; open terrain (Exposure C) has higher winds than suburban (B).

Quick reference

Building envelope influences and damage

  • Gable end walls are vulnerable to wind; if not braced, they can collapse inward or outward.

  • Soffits and fascia can be lifted by wind, allowing water intrusion and loss of roof edge support.

  • Wall openings (windows, doors) that fail create internal pressure and increase roof uplift.

  • Roof overhangs create uplift; large overhangs are more susceptible.

  • Exterior cladding (siding, stucco) can be torn off, exposing sheathing and allowing water entry.

  • Continuous load path from roof to foundation must be maintained; envelope breaches can break it.

  • Damage often starts at edges, corners, and penetrations; these areas need special attention.

  • Water intrusion through envelope breaches can cause mold and structural deterioration.

Quick reference

Windows, doors and gable end wall construction

  • Opening protection includes impact-rated glazing, shutters, panels, or reinforced doors; all openings must be protected to qualify for the highest credit.

  • Gable end walls must be braced to resist wind; look for diagonal bracing, sheathing, or continuous load path.

  • Garage doors are large openings; they must be rated for wind pressure and have proper track and reinforcement.

  • Entry doors should have three hinges and a deadbolt; impact-rated doors have labels indicating rating.

  • Windows must have labels or markings indicating impact rating or approved shutter systems.

  • Gable end wall construction: check for continuous sheathing, proper nailing, and connection to wall below.

  • Non-rated openings can be protected by shutters; shutters must be tested and labeled.

  • Verify that protection covers all openings, including skylights and gable vents.

Quick reference

Getting started and roof covering

  • Start inspection by verifying address, taking overall photos, and documenting roof covering type and age.

  • Roof covering types: asphalt shingles, metal, tile, concrete, or membrane; each has different wind resistance.

  • Look for roof covering product approval or evaluation report; it indicates wind speed rating.

  • Record roof covering condition: missing, cracked, or deteriorated shingles may not qualify for credit.

  • Roof age and permit date affect eligibility; older roofs may not qualify for certain credits.

  • Take photos of roof covering from ground and close-ups; include labels if available.

  • Document roof geometry (hip, gable, flat) and secondary water resistance (SWR) if present.

  • Verify roof covering meets current code if required by form; otherwise report as is.

Quick reference

Roof deck attachment

  • Roof deck attachment refers to how plywood/OSB sheathing is fastened to roof framing.

  • Common attachment methods: 8d nails at 6" o.c., 8d nails at 12" o.c., staples, or screws.

  • Enhanced attachment (e.g., 8d nails at 6" o.c. or ring shank nails) may qualify for better credit.

  • Verify nail size and spacing by observing from attic; measure spacing and nail diameter.

  • Look for nail penetration through sheathing; under-driven or over-driven nails reduce capacity.

  • Deck attachment must be documented with photos showing nail spacing and type.

  • If sheathing is not visible, use a probe or remove a small section with permission.

  • Roof deck attachment is a key factor in wind uplift resistance; weak attachment leads to loss of roof sheathing.

Quick reference

Roof-to-wall attachment

  • Roof-to-wall connection transfers uplift from roof to walls; common types: toe nails, clips, straps, or structural screws.

  • Toe nails (nails driven at an angle through rafter into wall) are weakest and often fail.

  • Clips (metal connectors) provide better connection; straps that wrap over rafter and down wall are stronger.

  • Double straps (both sides of rafter) provide highest credit.

  • Inspect from attic: look for straps, clips, or nails; measure strap thickness and nail count.

  • Verify connection at all rafters/trusses; missing connectors reduce overall performance.

  • Document with photos showing connector type and placement.

  • Roof-to-wall attachment is critical for continuous load path; failure can lead to roof uplift and wall collapse.

Quick reference

Roof geometry

  • Roof geometry types: hip, gable, flat, and combinations; hip roofs perform better in wind.

  • Hip roof has slopes on all sides; reduces uplift and is often credited.

  • Gable roof has two sloping sides and vertical gable ends; more vulnerable to wind uplift.

  • Flat roof has low slope; wind performance depends on edge detailing.

  • Roof geometry is determined by visual inspection from ground or attic; measure slope if needed.

  • Document roof shape with photos and sketch if necessary.

  • Hip roofs may qualify for better credits; verify that all sides are sloped.

  • Complex roofs with multiple gables and valleys may have higher wind loads; note any irregularities.

Quick reference

Secondary water resistance

  • Secondary water resistance (SWR) is a layer under roof covering that prevents water intrusion if shingles fail.

  • Common SWR materials: self-adhered modified bitumen membrane, peel-and-stick underlayment.

  • SWR must cover entire roof deck, including valleys and edges, to qualify.

  • Verify SWR by lifting shingles or inspecting from attic at eaves; look for membrane.

  • SWR is often required in high-wind areas; check building code for requirements.

  • Document SWR with photos showing material and coverage.

  • SWR can reduce water damage but does not improve wind uplift resistance.

  • If SWR is not present, report as none; do not assume based on roof age.

Quick reference

Opening protection

  • Opening protection includes impact-rated windows/doors, shutters, or panels that protect against debris.

  • All openings (windows, doors, skylights, gable vents) must be protected to qualify for the highest credit.

  • Impact-rated glazing has a label indicating compliance with ASTM E1886/E1996 or Florida Building Code.

  • Shutters must be tested and labeled; verify they cover the entire opening and are properly anchored.

  • Garage doors require reinforcement or impact rating; check for label or rating.

  • Document each opening with photos showing protection type and label.

  • If some openings are unprotected, credit may be reduced; note which are protected.

  • Opening protection prevents internal pressurization and debris intrusion, reducing damage.

Quick reference

Photographs required, suggested protocols and documentation

  • Required photos: front of house, address verification, roof covering, roof deck attachment, roof-to-wall connection, SWR, opening protection, and labels.

  • Each photo should be dated and labeled with location and description.

  • Take wide-angle and close-up photos to show context and detail.

  • For roof-to-wall, photograph at least three different locations; show connector type and nail count.

  • For roof deck attachment, photograph nail spacing and type; use a ruler for scale.

  • For opening protection, photograph each opening and label; include manufacturer label.

  • Document any limitations (e.g., areas not accessible) and note them in report.

  • Keep photos organized and attach to inspection form; retain copies for records.