InterNACHI Wind Mitigation study materials
InterNACHI Wind Mitigation study resources

InterNACHI Wind Mitigation flashcards

InterNACHI Wind Mitigation · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Wind mitigation inspection
An inspection that documents wind-resistant features of a building for insurance premium discounts. It is not a home inspection and does not assess code compliance.
OIR-B1-1802 form
The Florida Uniform Mitigation Verification Inspection Form used to report wind mitigation features. Other states may use different forms.
Dynamic pressure formula
q = 0.00256 × V², where q is dynamic pressure in psf and V is wind speed in mph. This shows pressure increases with the square of wind speed.
Internal pressurization
When wind enters through an opening, it increases internal pressure, which can double net uplift on roofs and lead to failure.
Continuous load path
A chain of connections from roof to foundation that transfers wind loads safely. Weak links, such as toe-nailed connections, are common failure points.
Gable end wall vulnerability
Gable end walls are prone to collapse under wind if not properly braced. Look for diagonal bracing or continuous sheathing to confirm reinforcement.
Soffit and fascia damage
Wind can lift soffits and fascia, allowing water intrusion and loss of roof edge support. These are common envelope failure points.
Envelope breach consequences
Breaches in walls or roof allow wind and rain inside, causing internal pressurization, water damage, and potential structural failure.
Impact-rated glazing label
Windows and doors with impact-rated glazing have a permanent label indicating compliance with ASTM E1886/E1996 or Florida Building Code.
Garage door wind rating
Garage doors must be rated for wind pressure and may need reinforcement. Check for a label indicating wind speed rating.
Gable end wall bracing
Gable end walls must be braced to resist wind. Look for diagonal bracing, continuous sheathing, or a structural connection to the wall below.
Roof covering product approval
Roof coverings should have a product approval or evaluation report indicating wind speed rating. This document supports mitigation credit.
Roof covering condition
Missing, cracked, or deteriorated shingles may not qualify for wind mitigation credit. Document condition with photos.
Roof age and permit
Roof age and permit date affect eligibility for certain credits. Older roofs may not qualify; verify permit information if available.
Roof deck attachment methods
Common methods include 8d nails at 6" or 12" on center, staples, or screws. Enhanced attachment with closer spacing or ring shank nails may qualify for better credit.
Nail spacing measurement
Measure nail spacing in the attic with a ruler. Typical spacing is 6" or 12" on center; document with photos showing scale.
Nail penetration issues
Under-driven or over-driven nails reduce holding capacity. Verify that nails penetrate through sheathing and are not angled.
Toe-nailed roof connection
Nails driven at an angle through rafter into wall are the weakest roof-to-wall connection and often fail in high winds.
Roof-to-wall straps
Metal straps that wrap over the rafter and down the wall provide a stronger connection than clips or toe nails. Double straps offer highest credit.
Roof-to-wall inspection
Inspect from attic for straps, clips, or nails at each rafter. Verify connector type, thickness, and nail count; document with photos.
Hip roof advantage
Hip roofs slope on all sides, reducing uplift and often qualifying for better wind mitigation credits compared to gable roofs.
Gable roof vulnerability
Gable roofs have two sloping sides and vertical gable ends, making them more susceptible to wind uplift and gable end collapse.
Roof geometry documentation
Document roof shape (hip, gable, flat) with photos and sketch. Verify all sides are sloped for hip roof credit.
Secondary water resistance material
A layer under roof covering, such as self-adhered modified bitumen membrane, that prevents water intrusion if shingles fail.
SWR coverage requirement
Secondary water resistance must cover the entire roof deck, including valleys and edges, to qualify for credit.
SWR verification method
Verify SWR by lifting shingles at eaves or inspecting from attic. Look for membrane; document with photos showing material and coverage.
Opening protection types
Impact-rated windows/doors, shutters, or panels that protect against debris. All openings must be protected for highest credit.
Shutter labeling requirement
Shutters must be tested and labeled, and must cover the entire opening. Verify proper anchorage and label.
Opening protection documentation
Photograph each opening with protection and label. Note any unprotected openings, which may reduce credit.
Required inspection photos
Photos must include front of house, address, roof covering, deck attachment, roof-to-wall connection, SWR, and opening protection, each dated and labeled.
Photo labeling protocol
Each photo should be labeled with location and description. Take wide-angle and close-up shots to show context and detail.
Documenting limitations
Note any areas not accessible and explain why in the report. This maintains transparency and accuracy.