InterNACHI Wind Mitigation flashcards
InterNACHI Wind Mitigation · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Wind mitigation inspection
- An inspection that documents wind-resistant features of a building for insurance premium discounts. It is not a home inspection and does not assess code compliance.
- OIR-B1-1802 form
- The Florida Uniform Mitigation Verification Inspection Form used to report wind mitigation features. Other states may use different forms.
- Dynamic pressure formula
- q = 0.00256 × V², where q is dynamic pressure in psf and V is wind speed in mph. This shows pressure increases with the square of wind speed.
- Internal pressurization
- When wind enters through an opening, it increases internal pressure, which can double net uplift on roofs and lead to failure.
- Continuous load path
- A chain of connections from roof to foundation that transfers wind loads safely. Weak links, such as toe-nailed connections, are common failure points.
- Gable end wall vulnerability
- Gable end walls are prone to collapse under wind if not properly braced. Look for diagonal bracing or continuous sheathing to confirm reinforcement.
- Soffit and fascia damage
- Wind can lift soffits and fascia, allowing water intrusion and loss of roof edge support. These are common envelope failure points.
- Envelope breach consequences
- Breaches in walls or roof allow wind and rain inside, causing internal pressurization, water damage, and potential structural failure.
- Impact-rated glazing label
- Windows and doors with impact-rated glazing have a permanent label indicating compliance with ASTM E1886/E1996 or Florida Building Code.
- Garage door wind rating
- Garage doors must be rated for wind pressure and may need reinforcement. Check for a label indicating wind speed rating.
- Gable end wall bracing
- Gable end walls must be braced to resist wind. Look for diagonal bracing, continuous sheathing, or a structural connection to the wall below.
- Roof covering product approval
- Roof coverings should have a product approval or evaluation report indicating wind speed rating. This document supports mitigation credit.
- Roof covering condition
- Missing, cracked, or deteriorated shingles may not qualify for wind mitigation credit. Document condition with photos.
- Roof age and permit
- Roof age and permit date affect eligibility for certain credits. Older roofs may not qualify; verify permit information if available.
- Roof deck attachment methods
- Common methods include 8d nails at 6" or 12" on center, staples, or screws. Enhanced attachment with closer spacing or ring shank nails may qualify for better credit.
- Nail spacing measurement
- Measure nail spacing in the attic with a ruler. Typical spacing is 6" or 12" on center; document with photos showing scale.
- Nail penetration issues
- Under-driven or over-driven nails reduce holding capacity. Verify that nails penetrate through sheathing and are not angled.
- Toe-nailed roof connection
- Nails driven at an angle through rafter into wall are the weakest roof-to-wall connection and often fail in high winds.
- Roof-to-wall straps
- Metal straps that wrap over the rafter and down the wall provide a stronger connection than clips or toe nails. Double straps offer highest credit.
- Roof-to-wall inspection
- Inspect from attic for straps, clips, or nails at each rafter. Verify connector type, thickness, and nail count; document with photos.
- Hip roof advantage
- Hip roofs slope on all sides, reducing uplift and often qualifying for better wind mitigation credits compared to gable roofs.
- Gable roof vulnerability
- Gable roofs have two sloping sides and vertical gable ends, making them more susceptible to wind uplift and gable end collapse.
- Roof geometry documentation
- Document roof shape (hip, gable, flat) with photos and sketch. Verify all sides are sloped for hip roof credit.
- Secondary water resistance material
- A layer under roof covering, such as self-adhered modified bitumen membrane, that prevents water intrusion if shingles fail.
- SWR coverage requirement
- Secondary water resistance must cover the entire roof deck, including valleys and edges, to qualify for credit.
- SWR verification method
- Verify SWR by lifting shingles at eaves or inspecting from attic. Look for membrane; document with photos showing material and coverage.
- Opening protection types
- Impact-rated windows/doors, shutters, or panels that protect against debris. All openings must be protected for highest credit.
- Shutter labeling requirement
- Shutters must be tested and labeled, and must cover the entire opening. Verify proper anchorage and label.
- Opening protection documentation
- Photograph each opening with protection and label. Note any unprotected openings, which may reduce credit.
- Required inspection photos
- Photos must include front of house, address, roof covering, deck attachment, roof-to-wall connection, SWR, and opening protection, each dated and labeled.
- Photo labeling protocol
- Each photo should be labeled with location and description. Take wide-angle and close-up shots to show context and detail.
- Documenting limitations
- Note any areas not accessible and explain why in the report. This maintains transparency and accuracy.