InterNACHI Wind Mitigation study materials
InterNACHI Wind Mitigation study resources

InterNACHI Wind Mitigation study plan

InterNACHI Wind Mitigation · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Introduction; buildings and wind & Building envelope influences and damage

  • Define the purpose of a wind mitigation inspection and distinguish it from a general home inspection, listing at least four differences in writing.

  • Explain how hurricane straps, continuous load path, and roof geometry interact to resist uplift, using a labeled hand-drawn diagram of the load path from roof to foundation.

  • Describe wind zone and design-pressure concepts well enough to state why the same house can be rated differently in different jurisdictions.

  • Identify at least six building envelope components (roof covering, deck, soffit, gable end, windows, doors) and write one sentence on how each fails under wind and rain intrusion.

  • Build a one-page glossary of at least 15 terms used across the course (uplift, load path, secondary water resistance, opening protection, mean roof height, and similar).

Your checkpoint

A two-page handwritten or typed summary with a labeled load-path diagram and a 15-term glossary, self-checked against the course modules for domain 1 and 2.

Week 2

Windows, doors and gable end wall construction & Roof deck attachment

  • Compare window and door assemblies by glazing type, frame material, and anchorage, and record which attributes affect opening protection credit.

  • Explain gable end wall bracing and the difference between a braced and unbraced gable, sketching both.

  • Identify the roof deck attachment types in the course (6d, 8d, and similar nail schedules, spacing, and panel thickness) and state the inspection evidence for each.

  • Practice measuring nail spacing and edge distance on a photo or sample panel and record the values in a field-note format.

  • List the conditions that force a lower deck attachment rating, such as missed nails, overdriven nails, or widely spaced panels.

Your checkpoint

A completed deck attachment decision table with at least five rows mapping observed nail type, spacing, and panel thickness to a rating, plus two gable sketches.

Week 3

Roof-to-wall attachment & Getting started and roof covering

  • Distinguish toe-nail, clip, single-wrap strap, double-wrap strap, and anchor-bolt roof-to-wall connections and state the visual evidence for each.

  • Explain how to verify strap embedment and the number of nails per strap without removing finished surfaces.

  • Sequence a roof inspection from the ground to the attic, listing the safety checks performed at each step.

  • Classify at least four roof covering types and describe how covering condition influences the inspection report.

  • Draft the opening questions you would ask a homeowner before arriving on site, including roof age, prior permits, and any known repairs.

Your checkpoint

A one-page roof-to-wall connection identification guide with a sketch of each connection type and the evidence needed to credit it.

Week 4

Roof geometry & Secondary water resistance

  • Define roof geometry categories used in wind mitigation ratings and compute mean roof height for a simple hip and gable example.

  • Explain how hip roof percentage is calculated and practice the calculation on two worked examples.

  • Identify secondary water resistance systems and the installation evidence required to credit them, including taped or sealed deck joints.

  • Explain why secondary water resistance matters when the primary covering is breached and describe the limits of that protection.

  • Write a short paragraph explaining roof geometry and secondary water resistance to a homeowner in plain language.

Your checkpoint

Two worked geometry calculations with mean roof height and hip percentage shown, plus a homeowner-facing explanation of secondary water resistance of at least 150 words.

Week 5

Opening protection & Photographs required, suggested protocols and documentation

  • Classify opening protection levels for windows, doors, and garage doors and state the evidence required for each level.

  • Describe how to verify product approval markings, impact ratings, and shutter hardware during an inspection.

  • List the photographs required for each inspection section and the angle, distance, and scale reference each photo needs.

  • Draft a photo shot list organized by inspection sequence, from address verification through attic connection close-ups.

  • Identify common documentation errors, such as missing scale references or unlabeled photos, and describe how to avoid them.

Your checkpoint

A complete photo shot list with at least 20 numbered shots, each with subject, distance, and required scale reference, plus an opening protection evidence checklist.

Week 6

Roof deck attachment & Roof-to-wall attachment & Opening protection

  • Re-run the deck attachment, roof-to-wall, and opening protection decision tables from memory and correct any errors against the course.

  • Practice a full mock inspection walkthrough on a real or photographed house, recording evidence for all three domains.

  • Time yourself documenting each connection type and identify where your evidence collection is slowest.

  • Write the report sections for deck attachment, roof-to-wall, and opening protection for the mock inspection.

  • List the three most common reasons a rating is downgraded and the evidence that prevents each downgrade.

Your checkpoint

A complete mock inspection report covering deck attachment, roof-to-wall connection, and opening protection, with at least 15 supporting photos or photo descriptions.

Week 7

Roof geometry & Secondary water resistance & Photographs required, suggested protocols and documentation

  • Re-run the roof geometry and secondary water resistance calculations and write the report sections from your mock inspection.

  • Assemble the full mock report across all ten domains and check it against the course documentation standards.

  • Peer-review or self-review the report for missing photos, unsupported ratings, and unclear language.

  • Rewrite any report section that lacks a cited photo or measurement.

  • Build a one-page pre-departure and on-site checklist covering safety, tools, and documentation.

Your checkpoint

A fully assembled mock inspection report covering all ten domains with a self-review log listing every correction made.

Week 8

Introduction; buildings and wind & Building envelope influences and damage & Windows, doors and gable end wall construction & Getting started and roof covering & Roof deck attachment & Roof-to-wall attachment & Roof geometry & Secondary water resistance & Opening protection & Photographs required, suggested protocols and documentation

  • Take a timed practice exam or self-quiz across all domains and record the score by domain.

  • Re-study the two weakest domains until you can explain each rating decision without notes.

  • Recite the evidence requirements for every rating category from memory in under 15 minutes.

  • Review the glossary and decision tables and update any entry that proved wrong during practice.

  • Write a final one-page personal reference sheet you would take to a job site.

Your checkpoint

A scored practice exam with a per-domain breakdown, a remediation log for the two weakest domains, and a final one-page field reference sheet.

Milestones

Week 2: You can identify deck attachment type and nail spacing from a photograph and justify the rating in writing without consulting notes.

Week 4: You can compute mean roof height and hip roof percentage for a new example correctly on the first attempt and explain secondary water resistance to a layperson.

Week 6: Your mock inspection report covers deck attachment, roof-to-wall, and opening protection with at least 15 supporting photos or descriptions and no unsupported ratings.

Week 8: You score at least 80 percent on a full-length practice exam, with no domain below 70 percent, and can recite the evidence requirements for every rating category from memory.