- Floor Area Ratio
- Total above-grade gross floor area divided by plot area. Zoning tables cap this ratio per zone, and it is checked independently of building coverage.
- Building coverage ratio
- The building footprint area divided by the plot area, expressed as a percentage. It is limited separately from floor area ratio.
- Ramp slope limit
- Accessible ramps are limited to a running slope of 1:12, with level landings at least every 9 metres of run and at every change of direction.
- Stair riser-tread rule
- Comfortable stairs keep risers near 17–18 cm and treads near 28–30 cm, with twice the riser plus the tread falling between 60 and 64 cm.
- Seismic base shear
- The total design lateral force at the base equals the seismic coefficient multiplied by the effective seismic weight of the structure.
- Concrete cover purpose
- Cover protects reinforcement from corrosion and fire and ensures bond. Minimum values depend on exposure class and member type, and increase for foundations cast against soil.
- Strong-column weak-beam
- A design hierarchy in which beam hinges form before column hinges, so the frame keeps its vertical load path during a severe earthquake.
- One-way versus two-way slab
- A slab spanning mainly in one direction has a long-to-short side ratio of about two or more; below that, load travels in both directions.
- Cement Type V
- A cement with high sulfate resistance, used where soil or groundwater carries high sulfate concentrations. Type II gives only moderate resistance.
- Water-cement ratio
- The mass of water divided by the mass of cement in a mix. Lowering it raises strength and lowers permeability, but workability must be maintained by admixture.
- Concrete curing period
- Moist curing for at least seven days with normal cement, or about three days with high-early-strength cement, prevents strength loss and shrinkage cracking.
- Thermal conductivity lambda
- A material property in watts per metre-kelvin describing heat flow through unit thickness per unit temperature difference. Lower values insulate better.
- Waterproofing lap direction
- Sheet membranes are laid so each upper sheet overlaps the lower one in the direction of water flow, keeping water on the surface rather than driving it into the lap.
- U-value definition
- The overall heat transfer coefficient of an assembly, equal to the reciprocal of total thermal resistance including surface films. Lower U means a better envelope.
- Heating load components
- Transmission losses through the envelope plus the load for heating cold infiltrating and ventilating air. Solar and internal gains are subtracted for cooling load.
- Vent stack function
- A vertical pipe connected to drain branches that admits air behind the flowing waste, preventing trap seal siphonage and sewer gas entry.
- Demand factor
- The ratio of maximum demand to total connected load. It is used to size electrical service equipment smaller than the sum of all connected loads.
- Critical path
- The longest duration chain of dependent activities through the project network. Its total float is zero, so any delay on it delays completion.
- Total float formula
- Total float equals late start minus early start, or late finish minus early finish. It is the time an activity can slip without delaying the project.
- Cost performance index
- Earned value divided by actual cost. A value below one indicates the work completed has cost more than its budgeted value.
- Hold point inspection
- A stage where work must stop until the supervisor inspects and signs off. Covering work before a hold point removes the chance to verify it.
- Occupant load factor
- A code table value giving floor area per person for each use. It converts area into persons, which then sizes exits, stairs, and doors.
- Means of egress components
- The continuous path from any occupied point through exit access, the exit itself, and exit discharge to a public way, kept clear and protected.
- Occupancy certificate
- An authority document confirming the completed building matches approved drawings and may be legally occupied. Issued after final inspection, not before.
- Lump-sum contract
- A fixed price for a fully defined scope. The contractor carries quantity and price risk, so unclear scope makes this form dispute-prone.
- Retention money
- A percentage withheld from progress payments as security for defects, released at the contractually defined stage after the defects liability period.
- Liquidated damages
- A pre-agreed sum per day of late completion. It must be a genuine forecast of the client's loss to be enforceable rather than a penalty.
- Variation order
- A written instruction changing scope, priced at contract rates or an agreed new rate, and assessed for time impact before the work proceeds.
- Excavation shoring threshold
- Trenches deeper than about 1.2 metres require sloping or shoring unless the ground is stable rock, and must be re-inspected after rain.
- Fall protection at edges
- Guardrails, covers, or personal fall arrest are required at open floor edges, roof edges, and openings, with covers secured against displacement.
- Rebar unit weight formula
- Weight per metre of a round bar equals the diameter in millimetres squared divided by 162, giving kilograms per metre.
- Unit rate build-up
- The per-unit price assembled from labour, material, plant, overhead, and profit. Productivity assumptions in the build-up drive estimate accuracy.