Iran Nezam Mechanical Supervision Exam study materials
Iran Nezam Mechanical Supervision Exam study resources

Iran Nezam Mechanical Supervision Exam study plan

Iran Nezam Mechanical Supervision Exam · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Building Mechanical Systems and HVAC Design

  • Map the full Domain 1 topic tree (load-to-terminal: psychrometrics, duct sizing, air distribution, hydronic piping, terminal units, ventilation) and rank each subtopic by exam weight and personal weakness

  • Solve at least 20 psychrometric problems by hand on the chart: locate state points, compute sensible and latent splits, coil ADP, bypass factor and apparatus dew point

  • Derive and apply equal-friction and velocity-reduction duct sizing methods to three branch layouts, verifying total pressure drop with a simple friction chart

  • Explain in writing the difference between constant air volume and variable air volume systems, including how terminal boxes, static pressure reset and minimum ventilation are controlled

Your checkpoint

A one-page psychrometric cheat sheet plus a solved set of 20 psychrometric and duct-sizing problems with final answers checked

Week 2

Building Mechanical Systems and HVAC Design & Refrigeration and Air Conditioning Equipment

  • Compare chilled-water, direct-expansion, and air-cooled versus water-cooled plant configurations on efficiency, first cost and maintenance, writing a 10-line justification for each

  • Select and size terminal units (fan coils, VAV boxes, chilled beams) for two sample zones using sensible and latent capacities from manufacturer-style data you construct yourself

  • Trace the refrigeration cycle for a vapor-compression chiller: compute evaporator and condenser loads, COP, compressor power and approach temperatures

  • Draft a commissioning checklist for an air-handling unit covering airflow balance, coil performance, filter pressure drop and controls sequence verification

Your checkpoint

A two-zone equipment selection table with calculated capacities, COP values and a one-page AHU commissioning checklist

Week 3

Heating and Cooling Load Calculations and Energy Efficiency

  • Compute heating and cooling design loads by the transfer-function or CLTD/CLF approach for a simple office zone, showing every input assumption

  • Separate envelope, internal, infiltration and ventilation loads and quantify the share each contributes to peak cooling load

  • Apply Mabhas 19 thermal transmittance limits to check a wall and roof assembly, and list which U-values fail

  • Evaluate three energy-efficiency measures (economizer, heat recovery, LED and occupancy controls) and estimate annual energy savings for each

Your checkpoint

A complete load calculation worksheet for one zone with a load-component breakdown chart and a short ECM savings comparison

Week 4

Sanitary and Plumbing Systems, Water Supply and Drainage

  • Size cold and hot water supply pipes for a multi-story building using fixture units, and verify residual pressure at the topmost fixture

  • Design a drainage stack and vent system for a sample building, checking trap arm lengths, stack capacity and vent sizing against Mabhas 16

  • Compute domestic hot water demand and size a storage tank and heater for a residential block, including recirculation return sizing

  • Identify cross-connection risks and specify backflow prevention devices for three building scenarios

Your checkpoint

A riser diagram for water supply and drainage of a four-story building with pipe sizes, fixture-unit tallies and pressure checks annotated

Week 5

Fire Protection and Life Safety Systems (Mechanical Aspects) & Fuel Gas, LPG and Combustion Systems

  • Determine required fire-resistance ratings and compartmentation for mechanical shafts, and specify fire and smoke damper locations on a schematic

  • Design a smoke control strategy (pressurization or exhaust) for a stairwell or corridor, computing required airflow from door-opening and leakage criteria

  • Size a natural gas piping system for a boiler room using the longest-run method and verify against Mabhas 17 pressure-drop limits

  • List combustion air, flue, ventilation and gas leak detection requirements for a basement boiler room and check a sample layout against them

Your checkpoint

A marked-up schematic showing damper locations, smoke-control airflow calculation and a gas pipe sizing table with pressure-drop verification

Week 6

Building Regulations, National Building Code (Mabhas 14, 16, 17, 22) and Standards & Refrigeration and Air Conditioning Equipment

  • Summarize the scope of Mabhas 14, 16, 17 and 22 into a comparison table: what each governs, key mandatory clauses and common inspection triggers

  • Extract every numerical limit (U-values, ventilation rates, pipe velocities, clearances, pressure drops) from the four Mabhas sections into a single reference sheet

  • Explain refrigerant classification, safety groups and charge limits, and choose an acceptable refrigerant for a given occupancy

  • Compare absorption, centrifugal and screw chillers on part-load performance and maintenance, and state when each is preferred

Your checkpoint

A single numerical-limits reference sheet covering all four Mabhas plus a refrigerant selection decision table

Week 7

Supervision Duties, Engineering Ethics and Professional Responsibility & Construction Management, Contracts and Quantity Surveying for Mechanical Works

  • Write the supervision workflow for a mechanical project from shop-drawing review through testing and handover, listing documents the supervisor must sign at each stage

  • Analyze five ethics scenarios (conflict of interest, pressure to approve non-compliant work, falsified test reports, gifts from contractors, reporting unsafe gas work) and state the correct action with reasoning

  • Prepare a bill of quantities for a ductwork and piping package using a measurement method, including wastage and unit-rate buildup

  • Review a sample contract clause set and flag the clauses that shift risk to the supervisor, explaining the practical consequence of each

Your checkpoint

A supervision and handover checklist with sign-off points, plus a worked BOQ for a duct and pipe package with unit rates

Week 8

Building Mechanical Systems and HVAC Design & Heating and Cooling Load Calculations and Energy Efficiency & Sanitary and Plumbing Systems, Water Supply and Drainage & Fire Protection and Life Safety Systems (Mechanical Aspects) & Fuel Gas, LPG and Combustion Systems & Refrigeration and Air Conditioning Equipment & Building Regulations, National Building Code (Mabhas 14, 16, 17, 22) and Standards & Supervision Duties, Engineering Ethics and Professional Responsibility & Construction Management, Contracts and Quantity Surveying for Mechanical Works

  • Complete two full timed mock exams under exam conditions and score each by domain to find residual weak areas

  • Re-drill the 30 most-missed items from earlier weeks until each is solved correctly twice without notes

  • Recite the numerical-limits sheet from memory and reconcile any gaps against the source sections

  • Rehearse the supervision and ethics checklists aloud against three new scenarios to confirm recall under time pressure

Your checkpoint

Two scored mock exams with a domain-by-domain error log and a final one-page revision sheet of the 30 hardest facts

Milestones

Week 2: Can solve a psychrometric state-point problem and a duct sizing problem cold, and can justify an equipment selection with numbers, in under 20 minutes each

Week 4: Can produce a complete load calculation and a water/drainage riser with sizes and pressure checks without consulting notes for the method steps

Week 6: Scores 70% or higher on a self-made 40-question quiz drawn from Domains 4, 5 and 7, and can quote the key numerical limits from memory

Week 8: Scores 75% or higher on both timed mock exams with no domain below 60%, and the 30-item error log is fully closed