Iran Nezam Mechanical Supervision Exam study plan
Iran Nezam Mechanical Supervision Exam · Give each week a clear focus.
8 weeks · About 7 hours per week
Building Mechanical Systems and HVAC Design
Map the full Domain 1 topic tree (load-to-terminal: psychrometrics, duct sizing, air distribution, hydronic piping, terminal units, ventilation) and rank each subtopic by exam weight and personal weakness
Solve at least 20 psychrometric problems by hand on the chart: locate state points, compute sensible and latent splits, coil ADP, bypass factor and apparatus dew point
Derive and apply equal-friction and velocity-reduction duct sizing methods to three branch layouts, verifying total pressure drop with a simple friction chart
Explain in writing the difference between constant air volume and variable air volume systems, including how terminal boxes, static pressure reset and minimum ventilation are controlled
Your checkpoint
A one-page psychrometric cheat sheet plus a solved set of 20 psychrometric and duct-sizing problems with final answers checked
Building Mechanical Systems and HVAC Design & Refrigeration and Air Conditioning Equipment
Compare chilled-water, direct-expansion, and air-cooled versus water-cooled plant configurations on efficiency, first cost and maintenance, writing a 10-line justification for each
Select and size terminal units (fan coils, VAV boxes, chilled beams) for two sample zones using sensible and latent capacities from manufacturer-style data you construct yourself
Trace the refrigeration cycle for a vapor-compression chiller: compute evaporator and condenser loads, COP, compressor power and approach temperatures
Draft a commissioning checklist for an air-handling unit covering airflow balance, coil performance, filter pressure drop and controls sequence verification
Your checkpoint
A two-zone equipment selection table with calculated capacities, COP values and a one-page AHU commissioning checklist
Heating and Cooling Load Calculations and Energy Efficiency
Compute heating and cooling design loads by the transfer-function or CLTD/CLF approach for a simple office zone, showing every input assumption
Separate envelope, internal, infiltration and ventilation loads and quantify the share each contributes to peak cooling load
Apply Mabhas 19 thermal transmittance limits to check a wall and roof assembly, and list which U-values fail
Evaluate three energy-efficiency measures (economizer, heat recovery, LED and occupancy controls) and estimate annual energy savings for each
Your checkpoint
A complete load calculation worksheet for one zone with a load-component breakdown chart and a short ECM savings comparison
Sanitary and Plumbing Systems, Water Supply and Drainage
Size cold and hot water supply pipes for a multi-story building using fixture units, and verify residual pressure at the topmost fixture
Design a drainage stack and vent system for a sample building, checking trap arm lengths, stack capacity and vent sizing against Mabhas 16
Compute domestic hot water demand and size a storage tank and heater for a residential block, including recirculation return sizing
Identify cross-connection risks and specify backflow prevention devices for three building scenarios
Your checkpoint
A riser diagram for water supply and drainage of a four-story building with pipe sizes, fixture-unit tallies and pressure checks annotated
Fire Protection and Life Safety Systems (Mechanical Aspects) & Fuel Gas, LPG and Combustion Systems
Determine required fire-resistance ratings and compartmentation for mechanical shafts, and specify fire and smoke damper locations on a schematic
Design a smoke control strategy (pressurization or exhaust) for a stairwell or corridor, computing required airflow from door-opening and leakage criteria
Size a natural gas piping system for a boiler room using the longest-run method and verify against Mabhas 17 pressure-drop limits
List combustion air, flue, ventilation and gas leak detection requirements for a basement boiler room and check a sample layout against them
Your checkpoint
A marked-up schematic showing damper locations, smoke-control airflow calculation and a gas pipe sizing table with pressure-drop verification
Building Regulations, National Building Code (Mabhas 14, 16, 17, 22) and Standards & Refrigeration and Air Conditioning Equipment
Summarize the scope of Mabhas 14, 16, 17 and 22 into a comparison table: what each governs, key mandatory clauses and common inspection triggers
Extract every numerical limit (U-values, ventilation rates, pipe velocities, clearances, pressure drops) from the four Mabhas sections into a single reference sheet
Explain refrigerant classification, safety groups and charge limits, and choose an acceptable refrigerant for a given occupancy
Compare absorption, centrifugal and screw chillers on part-load performance and maintenance, and state when each is preferred
Your checkpoint
A single numerical-limits reference sheet covering all four Mabhas plus a refrigerant selection decision table
Supervision Duties, Engineering Ethics and Professional Responsibility & Construction Management, Contracts and Quantity Surveying for Mechanical Works
Write the supervision workflow for a mechanical project from shop-drawing review through testing and handover, listing documents the supervisor must sign at each stage
Analyze five ethics scenarios (conflict of interest, pressure to approve non-compliant work, falsified test reports, gifts from contractors, reporting unsafe gas work) and state the correct action with reasoning
Prepare a bill of quantities for a ductwork and piping package using a measurement method, including wastage and unit-rate buildup
Review a sample contract clause set and flag the clauses that shift risk to the supervisor, explaining the practical consequence of each
Your checkpoint
A supervision and handover checklist with sign-off points, plus a worked BOQ for a duct and pipe package with unit rates
Building Mechanical Systems and HVAC Design & Heating and Cooling Load Calculations and Energy Efficiency & Sanitary and Plumbing Systems, Water Supply and Drainage & Fire Protection and Life Safety Systems (Mechanical Aspects) & Fuel Gas, LPG and Combustion Systems & Refrigeration and Air Conditioning Equipment & Building Regulations, National Building Code (Mabhas 14, 16, 17, 22) and Standards & Supervision Duties, Engineering Ethics and Professional Responsibility & Construction Management, Contracts and Quantity Surveying for Mechanical Works
Complete two full timed mock exams under exam conditions and score each by domain to find residual weak areas
Re-drill the 30 most-missed items from earlier weeks until each is solved correctly twice without notes
Recite the numerical-limits sheet from memory and reconcile any gaps against the source sections
Rehearse the supervision and ethics checklists aloud against three new scenarios to confirm recall under time pressure
Your checkpoint
Two scored mock exams with a domain-by-domain error log and a final one-page revision sheet of the 30 hardest facts
Milestones
Week 2: Can solve a psychrometric state-point problem and a duct sizing problem cold, and can justify an equipment selection with numbers, in under 20 minutes each
Week 4: Can produce a complete load calculation and a water/drainage riser with sizes and pressure checks without consulting notes for the method steps
Week 6: Scores 70% or higher on a self-made 40-question quiz drawn from Domains 4, 5 and 7, and can quote the key numerical limits from memory
Week 8: Scores 75% or higher on both timed mock exams with no domain below 60%, and the 30-item error log is fully closed