Quick reference

Project and Program Fundamentals

  • A project is a temporary endeavor producing a unique product, service, or result; a program is a group of related projects managed together for benefits not obtainable individually.

  • Project life cycle phases (initiation, planning, execution, monitoring/controlling, closure) differ from product life cycle phases, which may span multiple projects.

  • Triple constraint: scope, time, cost - quality sits at the center; a change to any one constrains the others.

  • Benefit realization is measured after program closure; project success is measured against scope, schedule, cost, and quality baselines.

  • Organizational structures: functional (PM has little authority), matrix (weak/balanced/strong), and projectized (PM has high authority over resources).

  • A PMO can be supportive (templates, best practices), controlling (compliance), or directive (manages projects directly).

  • Project charter authorizes the project and names the project manager; it is issued by the sponsor, not the PM.

  • Program manager scope spans multiple projects and shared resources; portfolio manager aligns projects/programs to strategic objectives.

  • Stakeholder register and business case are inputs established in initiation before detailed planning begins.

Quick reference

Requirements and Scope Definition

  • Scope baseline = scope statement + WBS + WBS dictionary; it is the approved reference for measuring scope performance.

  • WBS decomposes deliverables, not activities; the lowest level is a work package, and the 100% rule requires the WBS capture all scope.

  • Requirements types: business, stakeholder, solution, functional, and non-functional (quality, performance, security).

  • MoSCoW prioritization: Must have, Should have, Could have, Won't have (this time).

  • Scope creep = uncontrolled additions without change control; gold plating = adding features not requested.

  • Validate Scope (acceptance of deliverables) differs from Control Quality (correctness); validation happens after quality control.

  • A requirements traceability matrix links requirements to design, build, test, and acceptance to confirm coverage.

  • Decomposition depth rule: work packages should be estimable and assignable; a common heuristic is 8–80 hours per work package.

  • Assumptions and constraints recorded in the scope statement directly bound what solutions are feasible.

Quick reference

Architecture and Solution Design

  • Non-functional requirements (scalability, availability, latency, security) drive architecture; functional requirements drive features.

  • Layered architecture separates presentation, business logic, and data access; each layer depends only on the layer below.

  • Coupling measures interdependency between modules (lower is better); cohesion measures relatedness within a module (higher is better).

  • CAP theorem: a distributed system cannot simultaneously guarantee consistency, availability, and partition tolerance - pick two under partition.

  • Design reviews (preliminary and critical) gate progression; a design must satisfy requirements traceability before build.

  • Trade-off analysis selects among options using weighted criteria; document rejected alternatives and rationale.

  • Availability formula: availability = MTBF / (MTBF + MTTR); reducing MTTR raises availability.

  • Interface contracts (APIs, data schemas) must be defined and agreed before parallel development begins.

Quick reference

Delivery and Implementation Management

  • Critical path = longest path through the network; it determines minimum project duration and has zero total float.

  • Total float = LS − ES = LF − EF; free float is the time an activity can slip without delaying its successor.

  • Schedule compression: crashing adds cost/resources to shorten duration; fast tracking overlaps activities and raises risk.

  • Earned Value: CV = EV − AC; SV = EV − PV; CPI = EV/AC; SPI = EV/PV; EAC = BAC/CPI (typical variance).

  • TCPI = (BAC − EV) / (BAC − AC) - cost performance needed to finish within budget.

  • Rolling wave planning elaborates near-term work in detail and leaves far-term work at a higher level.

  • Resource leveling may extend the schedule (changes critical path); resource smoothing keeps duration within float.

  • Agile delivery: sprint backlog is pulled from the product backlog; velocity = completed story points per iteration.

  • Milestones have zero duration and mark significant events; they consume no resources.

Quick reference

Quality Assurance and Verification

  • Quality assurance is process-focused (prevention); quality control is product-focused (inspection and defect detection).

  • Verification confirms the product was built right (conforms to spec); validation confirms the right product was built (meets user needs).

  • Cost of quality = prevention + appraisal (cost of conformance) + internal/external failure (cost of non-conformance).

  • Test levels: unit, integration, system, and acceptance; acceptance testing maps to Validate Scope.

  • Pareto principle: roughly 80% of defects stem from 20% of causes - prioritize the vital few.

  • Control charts use upper/lower control limits; a point outside limits or seven consecutive points on one side signals a special-cause variation.

  • Cause-and-effect (fishbone) diagrams identify root causes; scatter diagrams show correlation between two variables.

  • Definition of Done is the shared quality gate for agile increments; a deliverable not meeting it is not complete.

Quick reference

Risk, Change, and Issue Management

  • Risk = uncertain event with positive or negative effect; issue = a risk that has occurred and requires action now.

  • Risk score = probability × impact; risk response strategies for threats: avoid, transfer, mitigate, accept, escalate.

  • Opportunity strategies: exploit, share, enhance, accept, escalate.

  • Change control steps: request, assess impact (scope/time/cost/quality), approve/reject via CCB, update baselines, communicate.

  • A change to an approved baseline requires formal approval; undocumented changes are scope creep.

  • Risk register fields: ID, description, cause, probability, impact, score, owner, response, trigger, status.

  • Residual risk remains after responses; secondary risk is created by a response itself.

  • Issue log tracks open problems with owner, priority, and resolution date; escalate per governance thresholds.

  • Risk audit reviews the effectiveness of the risk process and responses, not individual project outcomes.

Quick reference

Stakeholder Communication and Governance

  • Power/interest grid: high power-high interest = manage closely; low power-low interest = monitor.

  • Communication channels formula: n(n − 1)/2 where n = number of stakeholders; channels grow quadratically with team size.

  • Communication methods: interactive (meetings), push (email/reports), pull (intranet/portals) - choose by urgency and audience.

  • Governance defines decision rights, escalation paths, approval thresholds, and reporting cadence.

  • RACI: Responsible (does the work), Accountable (one owner per task), Consulted (two-way input), Informed (one-way update).

  • Stakeholder engagement levels: unaware, resistant, neutral, supportive, leading - plan to move them toward supportive.

  • Status reports compare actual vs baseline (scope, schedule, cost); exceptions are escalated per governance thresholds.

  • Lessons learned are captured at phase gates and closure and fed into the organizational process assets.

Quick reference

Stakeholder Communication and Governance

  • Communication management plan specifies who receives what information, in what format, frequency, and via which channel.

  • Effective communication requires the sender to encode and the receiver to decode; noise and filters distort the message.

  • Governance board (steering committee) owns scope and budget approvals above defined thresholds; the PM does not self-approve.

  • Escalation should follow the defined chain and time thresholds, not bypass governance.

  • Reporting should be exception-based: highlight variances and decisions needed, not exhaustive activity logs.

  • Stakeholder analysis includes influence, interest, expectations, and potential impact on the project.

  • Formal vs informal and written vs verbal communication selection depends on message complexity and record-keeping needs.

Quick reference

Stakeholder Communication and Governance

  • Communication plan is a subsidiary of the project management plan and is baselined with it.

  • Meeting governance: agenda, decision log, action items with owners and due dates, and minutes distributed promptly.

  • A governance gate (phase gate) reviews deliverables against exit criteria before the next phase is authorized.

  • Escalation thresholds are numeric (e.g., variance > 10% or cost > threshold) and defined in the governance plan.

  • Stakeholder engagement assessment matrix compares current vs desired engagement and drives tailored communication.

  • Transparency rule: report bad news early; suppressed variance is a governance failure, not a communication choice.

  • RACI conflicts (two Accountable owners) are resolved before work starts, not during execution.

Quick reference

Stakeholder Communication and Governance

  • Communication models: linear (sender→receiver), interactive (feedback loop), and transactional (with acknowledgment).

  • Governance artifacts: charter, project management plan, phase-gate criteria, decision log, and escalation matrix.

  • Decision rights matrix clarifies who approves scope, budget, and design changes at each level.

  • Stakeholder communication cadence should match decision needs, not the PM's convenience; align with governance reporting cycles.

  • Conflict resolution modes: collaborate (win-win), compromise, accommodate, avoid, force - collaborate is preferred for important issues.

  • Lessons learned repository and organizational process assets inform future governance and communication plans.

Quick reference

Stakeholder Communication and Governance

  • Governance review should check baselines, risk exposure, and benefit realization, not just schedule status.

  • Communication is bidirectional; confirmation of understanding is required for critical messages.

  • Stakeholder register is a living document updated as stakeholders change through the project life cycle.

  • Escalation path must be known to all stakeholders before issues arise; publish it in the communication plan.

  • Reporting variance thresholds trigger formal corrective action and change requests.

  • Project closure requires final acceptance, transition of deliverables, and archived lessons learned.

Quick reference

Stakeholder Communication and Governance

  • Effective governance balances control with delivery speed; excessive gates slow progress, too few increase risk.

  • Stakeholder satisfaction is an outcome of meeting requirements and managing expectations, not of over-communicating.

  • Communication blockers (noise, jargon, cultural differences) should be identified and mitigated in the plan.

  • Sponsor is the primary escalation point for scope and budget conflicts beyond PM authority.

  • Meeting decisions must be recorded with owner and date to be actionable and auditable.

  • Post-implementation review measures benefits against the business case.