ITIL 4 Cloud Services flashcards
ITIL 4 Cloud Services · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Utility and warranty
- Utility is fitness for purpose, the functional outcome a cloud service delivers. Warranty is fitness for use, covering availability, capacity, continuity, and security. Strategy approval requires both.
- Cloud deployment models
- Public, private, hybrid, and community. Hybrid means two or more distinct models joined by technology enabling data and application portability. The choice follows residency, isolation, and cost constraints.
- Shared responsibility boundary
- The split of security and operational duties between provider and consumer. In IaaS the consumer owns the OS upward; in PaaS the application and data; in SaaS configuration and data governance.
- Service catalogue versus pipeline
- The service portfolio holds all services across pipeline, catalogue, and retired states. Only live services offered to customers appear in the catalogue and can be requested.
- Exit and portability design
- A design requirement covering data export formats, identity federation, contractual exit assistance, and transition periods, agreed before provider selection so lock-in risk is bounded.
- Elasticity as design constraint
- The ability to scale resources automatically with demand. Design must address capacity ceilings, cost of scale-out, stateful component behaviour, and isolation under multi-tenant load.
- Demand tiering
- Separating baseline, variable, and peak demand, then matching each tier to a sourcing pattern such as reserved capacity, on-demand instances, or spot capacity rather than sizing for peak.
- Data sovereignty constraint
- Legal requirement that data remains subject to the laws of the jurisdiction where it is stored. It determines eligible providers and regions before cost or feature comparison begins.
- Standard change
- A pre-authorised, low-risk change with a defined trigger and documented procedure. It is recorded but does not require case-by-case authorisation by the change authority.
- Blue/green deployment
- Two identical environments where traffic switches from live to new version at once. Rollback is fast because the previous environment remains intact and available.
- Canary release
- Progressive traffic shift to a new version for a small user subset, with monitoring before wider rollout. It limits blast radius but requires comparable metrics across versions.
- Major incident
- An incident with significant business impact requiring a separate escalation path, a dedicated coordinator, and scheduled stakeholder communications rather than standard queue handling.
- Known error
- A problem with a documented root cause and workaround, recorded in the known error database so the service desk can resolve recurrences faster.
- Event classification
- Every alert is classed as informational, warning, or exception. Only exceptions generate incidents, which prevents alert fatigue and keeps operational attention on actionable signals.
- Service request fulfilment
- Handling of standard, pre-approved user requests raised through the service catalogue. Requests follow an agreed procedure and do not pass through change authorisation.
- Configuration item tagging
- Cloud resources are discovered and recorded in the CMDB through tags. Untagged or unmanaged resources are invisible to inventory and treated as a control failure.
- Rollback cost profile
- The effort and risk of reversing a deployment. Blue/green keeps it low, canary moderate, rolling higher, because replaced instances may no longer be available.
- Least privilege in cloud
- Granting only the permissions needed for a task, using roles and scoped policies. Identity is the primary control plane, so excess permissions are the main breach path.
- Provider attestation scope
- Certifications such as ISO/IEC 27001, SOC 2, and PCI DSS evidence the provider's controls, not the consumer's configuration. Consumer-side evidence must be collected separately.
- Policy as code
- Governance intent expressed as automated guardrails, for example denying public storage or restricting regions. It scales to elastic environments where manual review cannot.
- Sub-processor chain
- The provider's own suppliers that handle data or deliver service components. Each layer adds dependency and must be recorded in the risk register and contract notices.
- Cloud concentration risk
- Dependence on a single provider or region for critical services. Treatment includes multi-region design, portable data formats, and documented exit plans.
- Access recertification
- Periodic review confirming each account still needs its roles. It detects privilege creep that accumulates as staff change teams or projects in elastic cloud environments.
- Data classification controls
- Classification determines retention period, encryption at rest and in transit, permitted geographic location, and verified deletion. Controls follow from the class, not from convenience.
- Breach notification clause
- A contractual term fixing how quickly the provider must inform the consumer of a security incident, enabling the consumer to meet its own regulatory reporting deadline.
- Continual improvement model
- Seven steps: vision, current position, target position, how to get there, take action, did we get there, keep momentum. Each cycle feeds the improvement register.
- Error budget
- One minus the service level objective. It quantifies acceptable unreliability and makes the trade-off between release velocity and stability explicit and negotiable.
- Outcome-based measurement
- Tracking indicators tied to customer outcomes rather than provider activity. Ticket volume and uptime percentages alone do not evidence value delivered.
- Value co-creation
- Value emerges from the provider's service plus the consumer's usage and configuration. Improvement must therefore span the boundary, not sit inside one organisation.
- Improvement register entry
- A recorded improvement with an owner, a baseline measure, a target, a review date, and expected value, so progress can be verified rather than assumed.
- Cloud cost optimisation
- Rightsizing, removing idle resources, and matching commitment models to demand. It reduces waste while preserving utility, and is a value lever rather than a finance task.
- Post-implementation review
- A check after a significant change confirming whether intended value was realised. Deviations are logged in the improvement register with follow-up actions.