Project Manager Examination study materials
Project Manager Examination study resources

Project Manager Examination cheat sheet

Project Manager Examination · Keep the key ideas within reach.

Quick reference

Project Integration and Scope Management

  • Project charter authorizes the project and the PM; it is issued by the sponsor and must be signed before planning begins.

  • Project management plan is a single integrated document; subsidiary plans (scope, schedule, cost, quality, resource, communications, risk, procurement, stakeholder) and baselines are its components.

  • Change control flow: change request → perform integrated change control (assess impact on scope, schedule, cost, quality, risk) → approve/reject/defer → update plan and baselines → implement → verify → close.

  • Scope baseline = scope statement + WBS + WBS dictionary; approved changes to any of the three require a formal change request.

  • WBS rule: 100% rule (all deliverables, no extra work), 8–80 hour work package guideline, decomposition to a level where cost and duration can be reliably estimated.

  • Validate Scope (with customer) differs from Control Quality (with internal QA); validate scope occurs after quality control and produces formal acceptance.

  • Gold plating is adding unauthorized scope; scope creep is uncontrolled incremental growth; both are prevented by change control.

  • Requirements traceability matrix links each requirement to its source, WBS deliverable, test, and acceptance criteria.

  • Configuration management plan controls versions of deliverables and documents; it is part of the project management plan.

Quick reference

Schedule and Cost Management

  • PERT expected duration = (O + 4M + P) / 6; standard deviation = (P − O) / 6; variance = SD².

  • Critical path is the longest path through the network and has zero total float; project duration = critical path length.

  • Total float = LS − ES = LF − EF; free float = ES(successor) − EF(activity).

  • Fast tracking overlaps activities (adds risk); crashing adds resources (adds cost); both compress schedule.

  • Schedule compression applies only to critical path activities to shorten project duration.

  • Critical chain method adds buffers (project buffer, feeding buffers, resource buffers) rather than padding individual activity estimates.

  • EVM: CV = EV − AC; SV = EV − PV; CPI = EV/AC; SPI = EV/PV; VAC = BAC − EAC.

  • EAC formulas: EAC = BAC/CPI (atypical variance continued); EAC = AC + (BAC − EV) (atypical variance not continued); EAC = AC + bottom-up ETC.

  • TCPI = (BAC − EV) / (BAC − AC) for budget target; TCPI = (BAC − EV) / (EAC − AC) for revised target; TCPI > 1 means harder to achieve.

Quick reference

Quality and Resource Management

  • Cost of quality = cost of conformance (prevention, appraisal) + cost of nonconformance (internal failure, external failure); prevention is cheapest.

  • Quality assurance (Manage Quality) is process-focused; quality control is product-focused and uses inspection, testing, and statistical sampling.

  • Control chart: ±3 sigma control limits; a point outside limits or 7 consecutive points on one side signals a process out of control.

  • Pareto chart applies the 80/20 rule to prioritize defects; cause-and-effect (fishbone) diagram identifies root causes.

  • Tuckman ladder: Forming → Storming → Norming → Performing → Adjourning.

  • Conflict management modes: collaborate (win-win, preferred), compromise, accommodate, avoid, force; use force for emergencies.

  • Maslow hierarchy: physiological, safety, social, esteem, self-actualization; Herzberg: hygiene factors prevent dissatisfaction, motivators drive satisfaction.

  • Resource leveling adjusts start/finish dates to resolve over-allocation and can extend the critical path; resource smoothing uses float and does not extend it.

  • RACI chart assigns responsible, accountable, consulted, informed; only one accountable per activity.

Quick reference

Communications and Stakeholder Management

  • Communication channels = n(n − 1)/2 where n = number of stakeholders; adding one person adds n channels.

  • Communication methods: interactive (multi-directional, most effective), push (sent to recipients), pull (recipients retrieve).

  • Communication model: sender → encoding → message → medium → decoding → receiver → feedback, with noise as interference.

  • Stakeholder power/interest grid: high power-high interest = manage closely; high power-low interest = keep satisfied; low power-high interest = keep informed; low power-low interest = monitor.

  • Stakeholder engagement levels: unaware, resistant, neutral, supportive, leading; engagement plan targets desired level.

  • Communications management plan specifies who gets what information, when, in what form, and by what method.

  • Salience model classifies stakeholders by power, legitimacy, and urgency.

  • Most communication issues trace to an inadequate communications management plan, not to individual behavior.

Quick reference

Risk and Procurement Management

  • Risk management process: identify → perform qualitative analysis → perform quantitative analysis → plan responses → implement responses → monitor risks.

  • Risk score = probability × impact; qualitative analysis prioritizes risks; quantitative analysis (Monte Carlo, EMV) assigns numerical values.

  • EMV = probability × impact (positive for opportunities, negative for threats); sum of EMVs = expected monetary value of the project.

  • Negative risk responses: avoid, transfer, mitigate, accept, escalate; positive: exploit, share, enhance, accept, escalate.

  • Contingency reserve covers known-unknowns (identified risks); management reserve covers unknown-unknowns; both are part of the cost baseline vs. project budget respectively.

  • Fallback plan is applied when the primary response is insufficient; workaround is an unplanned response to an unanticipated risk.

  • Contract types: fixed-price (seller bears cost risk), cost-reimbursable (buyer bears cost risk), time and materials (hybrid, used for small/labor-based work).

  • Procurement documents: RFI (information), RFP (price and solution), RFQ (price only); make-or-buy analysis decides whether to procure.

  • Procurement closing includes settled claims, formal acceptance, and final contract closure; contract changes require formal change control.

Quick reference

Project Initiation and Business Environment

  • Business case documents the need, cost-benefit analysis, and justification; it precedes the project charter.

  • Benefits management plan defines target benefits, metrics, and timeframes; it is created by the sponsor and helps measure project success.

  • Project vs. program vs. portfolio: project = temporary unique work; program = related projects managed together; portfolio = collection of projects/programs aligned with strategy.

  • Organizational structures: functional (PM has little authority), matrix (weak/balanced/strong), projectized (PM has high authority); PM authority increases from functional to projectized.

  • OPM (organizational project management) aligns projects to strategy through portfolio, program, and project management.

  • Enterprise environmental factors (EEFs) are internal/external conditions (culture, market, systems) that influence the project; organizational process assets (OPAs) are processes, templates, and knowledge repositories.

  • Benefits realization is measured against the business case and benefits management plan, not only against scope and schedule.

  • Project success is measured by product and project quality, schedule and budget performance, and stakeholder satisfaction; the PM should also consider the business objective.

Quick reference

Project Planning and Execution

  • Planning is iterative; the project management plan is progressively elaborated and baselined only after approval.

  • Direct and Manage Project Work produces deliverables, work performance data, and change requests; it also implements approved changes.

  • Manage Project Knowledge uses the knowledge management (tacit) and information management (explicit) approaches.

  • Acquire Resources obtains team members and physical resources; Develop Team improves competencies and interaction; Manage Team tracks performance and resolves conflicts.

  • Quality audits during Manage Quality identify process gaps and nonconformities and generate change requests.

  • Risk response implementation is part of Direct and Manage Project Work; risk owners are assigned in Plan Risk Responses.

  • Stakeholder engagement plan is executed through Manage Stakeholder Engagement; it includes communication and issue resolution.

  • Work performance data (raw) → work performance information (analyzed) → work performance reports (formatted for decision-makers).

Quick reference

Monitoring, Controlling, and Closing

  • Monitoring and Controlling compares actual performance to the plan and baselines; outputs are change requests and work performance reports.

  • Integrated change control is used for all change requests; approved changes update the plan and baselines.

  • Control Scope detects scope creep and verifies that only approved scope is performed; variance analysis compares baseline vs. actual.

  • Control Schedule uses critical path, float, and EVM (SPI, SV) to identify schedule variance; Control Costs uses CPI, CV, EAC, ETC, VAC.

  • Control Quality uses inspection, testing, and statistical sampling; verified deliverables are inputs to Validate Scope.

  • Control Resources monitors physical resource allocation and resolves shortages or over-allocation.

  • Control Procurements administers contracts, inspects seller work, and closes contracts; claims are resolved through negotiation, then ADR.

  • Close Project or Phase: final product transition, final report, update OPAs, archive records, release resources, and obtain formal acceptance.

  • Lessons learned are captured throughout the project and finalized in Close Project or Phase; they are stored in the organizational knowledge repository.

Quick reference

Project Integration and Scope Management

  • Project charter authorizes the project and the PM; it is issued by the sponsor and must be signed before planning begins.

  • Project management plan is a single integrated document; subsidiary plans and baselines are its components.

  • Change control flow: change request → perform integrated change control → approve/reject/defer → update plan and baselines → implement → verify → close.

  • Scope baseline = scope statement + WBS + WBS dictionary; approved changes to any of the three require a formal change request.

  • WBS rule: 100% rule, 8–80 hour work package guideline, decomposition to a level where cost and duration can be reliably estimated.

  • Validate Scope (with customer) differs from Control Quality (with internal QA); Validate Scope occurs after quality control and produces formal acceptance.

  • Gold plating is adding unauthorized scope; scope creep is uncontrolled incremental growth.

  • Requirements traceability matrix links each requirement to its source, WBS deliverable, test, and acceptance criteria.

Quick reference

Schedule and Cost Management

  • PERT expected duration = (O + 4M + P) / 6; standard deviation = (P − O) / 6.

  • Critical path is the longest path through the network and has zero total float.

  • Total float = LS − ES = LF − EF; free float = ES(successor) − EF(activity).

  • Fast tracking overlaps activities (adds risk); crashing adds resources (adds cost).

  • Schedule compression applies only to critical path activities to shorten project duration.

  • EVM: CV = EV − AC; SV = EV − PV; CPI = EV/AC; SPI = EV/PV; VAC = BAC − EAC.

  • EAC = BAC/CPI when variance continues; EAC = AC + (BAC − EV) when variance does not continue.

  • TCPI = (BAC − EV) / (BAC − AC); TCPI > 1 means the remaining work is harder to achieve.

Quick reference

Quality and Resource Management

  • Cost of quality = cost of conformance (prevention, appraisal) + cost of nonconformance (internal and external failure).

  • Quality assurance is process-focused; quality control is product-focused and uses inspection and testing.

  • Control chart: ±3 sigma limits; a point outside limits or 7 consecutive points on one side signals an out-of-control process.

  • Pareto chart applies the 80/20 rule to prioritize defects; fishbone diagram identifies root causes.

  • Tuckman ladder: Forming → Storming → Norming → Performing → Adjourning.

  • Conflict modes: collaborate (win-win, preferred), compromise, accommodate, avoid, force; force for emergencies.

  • Resource leveling can extend the critical path; resource smoothing uses float and does not extend it.

  • RACI chart: only one accountable per activity; responsible does the work.

Quick reference

Communications and Stakeholder Management

  • Communication channels = n(n − 1)/2 where n = number of stakeholders.

  • Communication methods: interactive (most effective), push, pull.

  • Communication model: sender → encoding → message → medium → decoding → receiver → feedback, with noise as interference.

  • Power/interest grid: high power-high interest = manage closely; high power-low interest = keep satisfied; low power-high interest = keep informed; low power-low interest = monitor.

  • Stakeholder engagement levels: unaware, resistant, neutral, supportive, leading.

  • Communications management plan specifies who gets what information, when, in what form, and by what method.

  • Salience model classifies stakeholders by power, legitimacy, and urgency.

  • Most communication issues trace to an inadequate communications management plan.

Quick reference

Risk and Procurement Management

  • Risk process: identify → qualitative analysis → quantitative analysis → plan responses → implement responses → monitor risks.

  • EMV = probability × impact; negative for threats, positive for opportunities.

  • Negative responses: avoid, transfer, mitigate, accept, escalate; positive: exploit, share, enhance, accept, escalate.

  • Contingency reserve covers known-unknowns; management reserve covers unknown-unknowns.

  • Fallback plan is applied when the primary response is insufficient; workaround is unplanned.

  • Contract types: fixed-price (seller bears cost risk), cost-reimbursable (buyer bears cost risk), time and materials (hybrid).

  • RFI = information; RFP = price and solution; RFQ = price only.

  • Procurement closing includes settled claims, formal acceptance, and final contract closure.

Quick reference

Project Initiation and Business Environment

  • Business case documents need, cost-benefit analysis, and justification; it precedes the project charter.

  • Benefits management plan defines target benefits, metrics, and timeframes.

  • Project = temporary unique work; program = related projects; portfolio = projects/programs aligned with strategy.

  • PM authority increases from functional to matrix to projectized structures.

  • EEFs are conditions that influence the project; OPAs are processes, templates, and knowledge repositories.

  • Benefits realization is measured against the business case and benefits management plan.

  • OPM aligns projects to strategy through portfolio, program, and project management.

  • Project success includes product and project quality, schedule and budget performance, and stakeholder satisfaction.

Quick reference

Project Planning and Execution

  • Planning is iterative; the project management plan is progressively elaborated and baselined after approval.

  • Direct and Manage Project Work produces deliverables, work performance data, and change requests.

  • Manage Project Knowledge uses knowledge management (tacit) and information management (explicit) approaches.

  • Acquire Resources obtains team members and physical resources; Develop Team improves competencies.

  • Quality audits during Manage Quality identify process gaps and generate change requests.

  • Risk response implementation is part of Direct and Manage Project Work.

  • Work performance data → work performance information → work performance reports.

  • Manage Stakeholder Engagement includes communication and issue resolution.

Quick reference

Monitoring, Controlling, and Closing

  • Monitoring and Controlling compares actual performance to the plan and baselines.

  • Integrated change control is used for all change requests; approved changes update the plan and baselines.

  • Control Scope detects scope creep and verifies that only approved scope is performed.

  • Control Schedule uses critical path and EVM; Control Costs uses CPI, CV, EAC, ETC, VAC.

  • Control Quality uses inspection, testing, and statistical sampling; verified deliverables are inputs to Validate Scope.

  • Control Resources monitors physical resource allocation and resolves shortages.

  • Control Procurements administers contracts and closes contracts; claims are resolved through negotiation, then ADR.

  • Close Project or Phase: final product transition, final report, update OPAs, archive records, release resources, obtain formal acceptance.