Project charter
Formal document issued by the sponsor that authorizes the project and the project manager, and gives the PM authority to apply organizational resources to project activities.
Scope baseline
Approved combination of the project scope statement, work breakdown structure, and WBS dictionary; changes to any component require formal integrated change control.
WBS 100% rule
The work breakdown structure must capture all project work and only project work; the sum of child-level deliverables equals the parent deliverable.
Validate Scope
Process of formalizing acceptance of completed project deliverables with the customer; it follows Control Quality and produces acceptance documentation and change requests.
PERT expected duration
Weighted estimate calculated as (Optimistic + 4 × Most Likely + Pessimistic) / 6; standard deviation equals (Pessimistic − Optimistic) / 6.
Critical path
Longest path through the project network; it determines the shortest possible project duration and has zero total float on all its activities.
Total float
Amount of time an activity can be delayed without delaying the project finish date; calculated as Late Start minus Early Start or Late Finish minus Early Finish.
Cost performance index
Ratio of earned value to actual cost (EV/AC); a value below 1.0 indicates the project is over budget for work performed.
Estimate at completion
Projected total cost of the project; equals BAC/CPI when the current variance continues, or AC + (BAC − EV) when the variance does not continue.
Schedule compression
Technique to shorten project duration without reducing scope; fast tracking overlaps activities, while crashing adds resources to critical path activities.
Cost of quality
Total cost of conformance (prevention and appraisal) plus cost of nonconformance (internal and external failure); prevention is generally the least expensive category.
Control chart rule
A process is out of control when a data point falls outside the ±3 sigma control limits or when seven consecutive points fall on one side of the mean.
Resource leveling
Technique that adjusts start and finish dates to resolve resource over-allocation; it may extend the critical path and change the project finish date.
Tuckman ladder
Model of team development stages: forming, storming, norming, performing, and adjourning; teams may cycle back to earlier stages after membership changes.
RACI chart
Responsibility assignment matrix that designates who is responsible, accountable, consulted, and informed for each activity; only one person is accountable per activity.
Communication channels formula
Number of communication channels equals n × (n − 1) / 2, where n is the number of stakeholders including the project manager.
Power/interest grid
Stakeholder classification tool; high power and high interest stakeholders are managed closely, while low power and low interest stakeholders are only monitored.
Interactive communication
Communication method involving real-time multi-directional exchange between participants; it is the most effective method for ensuring shared understanding.
Stakeholder engagement levels
Scale describing stakeholder attitudes: unaware, resistant, neutral, supportive, and leading; the engagement plan targets a desired level for each stakeholder.
Expected monetary value
Probability multiplied by impact; negative for threats and positive for opportunities, and the sum of EMVs represents the project's expected monetary exposure.
Contingency reserve
Budget or time allocated for identified risks (known-unknowns); it is included in the cost baseline, whereas management reserve is not.
Risk response strategies
For threats: avoid, transfer, mitigate, accept, escalate. For opportunities: exploit, share, enhance, accept, escalate. Each response is assigned a risk owner.
Fixed-price contract
Contract type in which the seller agrees to a set price for defined scope and bears most cost risk; suitable when scope is well defined.
Workaround
Unplanned response to a risk that was not identified or accepted; it is applied after the risk occurs and is documented during monitoring.
Business case
Document that establishes the need for the project and justifies the investment through cost-benefit analysis; it precedes the project charter.
Projectized organization
Organizational structure in which the project manager has high authority and team members report directly to the PM; team members are often co-located.
Enterprise environmental factors
Internal and external conditions such as culture, market conditions, and information systems that influence the project and are generally not under PM control.
Organizational process assets
Processes, policies, templates, and knowledge repositories of the performing organization that the project team can use to execute the project.
Manage Project Knowledge
Process of using existing knowledge and creating new knowledge; it relies on knowledge management for tacit knowledge and information management for explicit knowledge.
Work performance information
Performance data analyzed in context and compared to the plan; it is produced by controlling processes and used to generate work performance reports.
Integrated change control
Process of reviewing all change requests, assessing their impact on scope, schedule, cost, quality, and risk, and approving, rejecting, or deferring them.
Close Project or Phase
Final process that confirms completion, transitions the product, archives project records, updates organizational process assets, releases resources, and finalizes lessons learned.