Kazakhstan Maritime Engine Officer cheat sheet
Kazakhstan Maritime Engine Officer · Keep the key ideas within reach.
Main Propulsion and Auxiliary Machinery
Two-stroke marine diesel firing order: fuel injection begins 10-20° before TDC; exhaust valve opens 80-110° after TDC; scavenge air ports uncover 110-140° after TDC.
Indicated power per cylinder: IHP = (p_mi × L × A × n × 10) / 60 for a two-stroke, where p_mi is mean indicated pressure in bar, L stroke in m, A piston area in m², n rpm.
Specific fuel consumption (SFSC) = fuel mass flow (kg/h) ÷ brake power (kW). Modern two-strokes: 160-175 g/kWh; four-strokes: 175-195 g/kWh.
Turbocharger surge is caused by low air flow relative to pressure ratio: rapid load reduction, fouled turbine, or scavenge fire. Recovery: reduce load, open auxiliary blower, clean nozzle ring.
Auxiliary boiler safety: low-water level trips the burner; flame failure must shut the fuel valve within 3 s on loss of flame signal; relief valve set at 1.1 × design pressure.
Cylinder liner wear limits: max 0.7-1.0% of bore diameter; ovality max 0.5% of bore; replace when wear rate exceeds 0.1 mm per 1,000 h.
Fuel injection timing too advanced raises peak pressure and NOx; too retarded raises exhaust temperature and fuel consumption.
Governor droop: speed droop % = (n_no-load − n_full-load) ÷ n_full-load × 100. Isochronous governors have zero droop and require load sharing via load-sharing lines.
Marine Electrical, Electronic and Control Engineering
Insulation resistance minimum for 440 V circuits: 1 MΩ at 500 V DC test voltage; for 220 V: 0.5 MΩ; for 24 V DC: 0.2 MΩ.
Three-phase power: P = √3 × V_L × I_L × cos φ. For a 440 V, 100 A motor at 0.85 PF: P ≈ 64.7 kW.
Generator paralleling: synchronise on voltage, frequency, phase angle and phase sequence; close within ±10° phase angle and < 0.5 Hz slip frequency.
Reverse power protection trips at 5-10% of rated power with 1-3 s delay for a diesel generator.
Preferential trip (load shedding) operates before the main breaker trips: non-essential loads are shed in steps at 90-95% generator load.
Earth fault on an insulated-neutral system: single fault does not trip; locate within 24 h; second fault on another phase causes a short circuit.
Battery charging: lead-acid float voltage 2.23-2.27 V/cell; boost 2.4 V/cell; gassing begins above 2.35 V/cell; hydrogen LEL 4% by volume.
PLC scan cycle = input scan + program execution + output update; typical 5-50 ms. Watchdog timer trips the output module if the cycle exceeds the limit.
Maintenance and Repair at Operational/Management Level
Planned maintenance system (PMS) records: job card, running hours, spares consumed, technician, date, and sign-off by the Chief Engineer.
Crankshaft deflection measurement: take at every 5° or defined positions; compare against builder's limits; a change > 0.05 mm between successive readings indicates bearing misalignment.
Non-destructive testing: dye penetrant for surface cracks; magnetic particle for ferrous surface/subsurface; ultrasonic for internal defects; radiography for welds.
Torque values: use calibrated torque wrench; re-torque cylinder head bolts cold or hot per builder's manual; keep a torque log.
Spare parts classification: critical (no sail without), essential, and consumable. Minimum critical spares are listed in the ship's approved PMS and SMS.
Vibration limits (ISO 10816): 2.8 mm/s RMS good; 4.5 mm/s acceptable; 7.1 mm/s alarm; 11 mm/s trip for class II machines.
Lubricating oil analysis: viscosity ±25% of nominal, water < 0.2% for main engines, iron trending; TBN for cylinder oils matched to fuel sulphur (BN ≈ 40 for 2.5% S fuel).
Hot work and repair: permit-to-work, fire watch, gas-free certificate, and Chief Engineer's approval are required before any repair involving ignition sources.
Ship Construction, Stability and Engine Department Structures
Principal dimensions: length overall (LOA), length between perpendiculars (LBP), moulded breadth, moulded depth, summer draught. Block coefficient C_B = ∇ ÷ (L × B × T).
Metacentric height GM = KM − KG. Positive GM gives initial stability; GM must stay positive in all loading conditions.
Free surface effect reduces effective GM by FSC = (i × ρ) ÷ (∇ × ρ_sw), where i is the free surface second moment of area.
Load line marks: S (summer), W (winter), T (tropical), F (fresh), TF, and WNA; freeboard is measured from the deck line to the appropriate mark.
Double bottom and cofferdam: fuel tanks separated from sea water by cofferdams; sounding pipes must be self-closing on tank tops.
Structural members: longitudinal girders, floors, web frames, stringers, brackets. Tank boundaries require class-approved welding and NDT.
Bulkhead and watertight door classification: A-class (60 min), B-class (30 min) fire divisions; watertight doors must be operable from the bridge.
Engine room skylight, ventilator and casing openings must be closable from outside the space and marked as such.
Watchkeeping Engineering
Relief procedure: the relieving engineer must be satisfied with the plant condition, ongoing work, and standing orders before taking over; the relieving engineer signs the bell book.
Unattended machinery space (UMS) alarm checks: test alarm and safety systems at least once every 24 h; record in the engine room log.
Bridge bell book entries: every engine order, time, and acknowledgement. A wrong order must be challenged and clarified before execution.
Engine room log entries: every 1-2 h record pressures, temperatures, fuel and lube oil levels, and running hours.
Chief Engineer must be called for: loss of propulsion, fire, flooding, blackout, main engine alarm requiring immediate action, or serious injury.
Periodic checks: bilge levels, sea water strainers, fuel oil purifier operation, boiler water level, air receiver pressure, and running machinery temperatures.
Bunkering watch: continuous attendance, scuppers plugged, communication with the barge, tank soundings every 30 min, drip tray monitoring.
Handover to UMS: confirm all alarms tested, no ongoing maintenance, no bypassed safety devices, and the duty engineer is on board.
Engine Room Resource Management and Teamwork
Closed-loop communication: sender states the order, receiver repeats it, sender confirms. Use for all engine orders and critical operations.
Challenge and response: any crew member may challenge an unsafe order; the challenge must be acknowledged and resolved before execution.
Situational awareness: maintain a shared mental model of plant state; verbalise changes; brief before complex operations such as manoeuvring.
Fatigue management: STCW rest hours minimum 10 h in 24 h and 77 h in 7 days; watch schedules must be posted and records kept.
Authority gradient: a steep gradient suppresses reporting; briefings should invite questions and confirm understanding.
Error chain: most accidents result from a chain of small errors; break the chain by stopping, verifying, and escalating.
Team briefing content: task, hazards, roles, communication method, contingency, and abort criteria.
Emergency team roles: Chief Engineer as emergency coordinator, Second Engineer as damage control leader, duty engineer as initial responder.
Maritime Legislation, STCW, SOLAS, MARPOL, Flag and Port State
STCW 2010 Manila Amendments: minimum age 18, 12 months sea service for OOW, 36 months for Chief Engineer, and 5-yearly revalidation of certificates.
SOLAS Chapter I: certificates (Safety Construction, Safety Equipment, Safety Radio) valid 5 years; annual and intermediate surveys required.
MARPOL Annex I (oil): Oil Record Book Part I for machinery space operations; Part II for cargo; entries for every transfer, disposal, and oily water separator operation.
MARPOL Annex VI: sulphur limit 0.50% m/m global from 1 January 2020; 0.10% in ECAs; NOx Tier III for new ships in NOx ECAs; EEDI/EEXI/CII reporting.
Oil discharge at sea (Annex I): only via 15 ppm oily water separator, outside special areas, ship en route, not within 12 nm of land, with ORB entry.
Port State Control: Paris MoU targets ships by flag, company, and class performance; three or more detentions in 36 months triggers expanded inspection.
ISM Code: Safety Management Certificate valid 5 years; Document of Compliance for the company; internal audits annually.
Flag State responsibilities: survey, certification, casualty investigation, and enforcement of conventions on ships flying its flag.
Occupational Health, Safety, Fire Prevention and Firefighting in Machinery Spaces
Fire triangle: fuel, oxygen, heat. Extinguishing by removing fuel (isolate), oxygen (smother), or heat (cool).
Class B fire (oil): use foam, CO2, dry powder, or water spray (not jet). Class C (gas): isolate and use dry powder. Class A: water.
CO2 fixed system: discharge reduces O2 below 15%; space must be sealed and ventilated after discharge; entry only with breathing apparatus.
Fire main pressure: 2.5-6.5 bar at hydrant; hose and nozzle at every hydrant; annual flow test.
Enclosed space entry: permit, atmosphere test (O2 20.9%, LEL < 1%, H2S < 5 ppm, CO < 35 ppm), attendant at entrance, rescue equipment ready.
Hot work permit: gas-free certificate, fire watch, extinguisher, 30-minute post-work watch, and removal of combustibles within 11 m.
Personal protective equipment: safety helmet, safety shoes, gloves, goggles, ear protection, and coveralls in the engine room.
Fire drills: SOLAS requires monthly drills; engine room fire drill at least once every 3 months; record in the official logbook.
Emergency, Damage Control, Pollution Prevention and Environmental Response
Flooding response: sound general alarm, close watertight doors, start emergency fire pump and bilge pump, locate and shore the breach, monitor stability.
Blackout recovery: start emergency generator, restore emergency switchboard, then sequentially restart main generator, lube oil pump, cooling pumps, and main engine.
Steering gear failure: switch to emergency steering, inform bridge, reduce speed, and post a helmsman at the emergency station.
Oil spill response: stop the source, contain with booms, use absorbents, notify the bridge and company, and record in the ORB and log.
SOPEP: Shipboard Oil Pollution Emergency Plan must be approved and carried; includes reporting procedures and coastal state contacts.
Damage control: priority is to save the ship and crew, then cargo, then environment. Flooding and fire are the primary threats to stability.
Emergency fire pump: located outside the engine room, capable of two jets at 0.25 N/mm², and tested weekly.
Muster list: posted in the engine room, accommodation, and bridge; includes duties for fire, abandon ship, and man overboard.
English Language Proficiency and Maritime Communication
SMCP phrases: "Stand by engine", "Finished with engines", "Dead slow ahead", "Full astern", "Stop engine", "Ring off engine".
Engine order telegraph: acknowledge by repeating the order and moving the telegraph to the ordered position; then execute.
Mayday: distress call on VHF Ch 16, "Mayday, Mayday, Mayday, this is [ship name], position, nature of distress, assistance required".
Pan-pan: urgency call; Securite: safety call. Use plain language where SMCP does not cover the situation.
Bridge-to-engine room communication: use the engine order telegraph, sound-powered telephone, or VHF; confirm every order verbally.
Written communication: engine room log, night order book, standing orders, and defect reports must be clear, dated, and signed.
Numbers and positions: state latitude/longitude in degrees, minutes, and decimals; use phonetic alphabet for call signs.
Emergency communication: internal alarm, PA system, and GMDSS DSC on VHF Ch 70 for distress alerts.
Medical First Aid and Personal Survival Techniques
CPR ratio: 30 compressions to 2 breaths for adults; compression rate 100-120/min; depth 5-6 cm.
Recovery position: for unconscious breathing casualties; monitor airway, breathing, and circulation.
Burns: cool with running water for at least 10 minutes; do not remove adhered clothing; cover with sterile non-adherent dressing.
Hypothermia: remove wet clothing, insulate, give warm drinks if conscious; do not rub extremities; handle gently.
Personal survival: lifejacket donned before abandoning ship; immersion suit reduces heat loss; assume HELP position in water.
Abandon ship: muster at station, take survival craft, follow the person in charge, do not jump unless necessary.
First aid kit: check expiry dates monthly; include bandages, antiseptic, gloves, and resuscitation mask.
Medical emergency: call the master, use the ship's medical guide, and request radio medical advice via the coast radio station.