Section 1 - Site Design and Project Planning

  • Contour interval is the vertical distance between adjacent contour lines; a steeper slope produces contours spaced closer together, and slope percent = (rise ÷ run) × 100.

  • Grading formula: percent slope = vertical change ÷ horizontal distance × 100; convert to degrees with the arctangent of the slope ratio.

  • Spot elevations and contour lines must agree; interpolating between contours assumes uniform slope along the line connecting them.

  • Cut and fill balance means total cut volume equals total fill volume on site; unbalanced earthwork requires importing or exporting soil at added cost.

  • The 100-year floodplain is the area inundated by a flood with a 1 percent annual exceedance probability; the 500-year floodplain is 0.2 percent.

  • Base flood elevation (BFE) sets the regulatory elevation for construction; freeboard is additional height above BFE required by code or ordinance.

  • Universal accessibility route requirements: maximum running slope 1:20 (5 percent), maximum cross slope 1:48 (about 2 percent), and a firm, stable, slip-resistant surface.

  • Drainage design relies on the rational method Q = CiA, where Q is peak runoff, C is the runoff coefficient, i is rainfall intensity, and A is drainage area.

  • A landscape architect's standard of care is the degree of care and skill ordinarily exercised by members of the profession under similar circumstances.

Quick reference

Section 2 - Site Inventory, Analysis, and Construction Documentation

  • Plan scale: 1 inch = 20 feet means one drawing inch equals 240 drawing inches on the ground; a graphic scale remains accurate when a drawing is enlarged or reduced.

  • Bearing is measured from north and written as an angle with a quadrant letter (for example, N 45° E); azimuth is measured clockwise from north from 0° to 360°.

  • A legal description by metes and bounds follows boundary courses and distances from a point of beginning; a plat map records subdivided lots by block and lot number.

  • A benchmark is a fixed point of known elevation; a temporary benchmark (TBM) is established for a project and must be tied to a permanent datum.

  • USGS topographic maps commonly use a 1:24,000 scale with 10-foot contour intervals in flat terrain; quadrangle sheets show planimetric and topographic features.

  • Construction documents typically comprise drawings, specifications, and the contract documents; specifications govern over drawings when a conflict exists unless the contract states otherwise.

  • Detail drawings show a small area at large scale (for example, 1 inch = 1 foot); plan views show the site at small scale (for example, 1 inch = 50 feet).

  • A soils report provides bearing capacity, seasonal high water table, permeability, and shrink-swell potential used to size footings and paving sections.

  • Tree protection zones are commonly established at a radius equal to the tree's dripline or 1 foot of radius per inch of trunk diameter, whichever is greater per local standards.

Quick reference

Section 3 - Materials, Specifications, and Construction Administration

  • Concrete mix design is specified by compressive strength at 28 days; typical landscape flatwork uses 3,000–4,000 psi with air entrainment for freeze-thaw durability.

  • Portland cement concrete curing requires adequate moisture and temperature; cold-weather concreting requires protection from freezing until the concrete reaches sufficient strength.

  • Asphalt paving section: subgrade, aggregate base, and hot-mix asphalt surface; compaction is measured as a percentage of maximum dry density by standard Proctor test.

  • Unit paving (pavers) requires edge restraint and a compacted base; permeable pavers use open-graded aggregate and are sized for storage and infiltration.

  • The AIA A201 General Conditions establishes the architect's role in administration, including site visits and issuance of clarifications and interpretations.

  • A change order is a written modification to the contract signed by owner and contractor; a construction change directive directs work before a price is agreed.

  • A request for information (RFI) seeks clarification from the design professional; the response may become a clarification or a change order.

  • Submittals (shop drawings, product data, samples) are reviewed for conformance with the design concept and information in the contract documents, not for approval of means and methods.

  • Substantial completion is the stage when the work is sufficiently complete for its intended use; it triggers warranties, retainage release, and the start of the correction period.

Quick reference

Section 4 - Project and Construction Management

  • Critical path method (CPM): the critical path is the longest-duration sequence of dependent activities; any delay on it delays project completion.

  • Float (slack) is the amount of time an activity can slip without delaying the project; total float equals late finish minus early finish.

  • Cost estimating methods: unit cost (cost per square foot or per unit), assembly cost, and parametric estimating; order-of-magnitude estimates are less accurate than detailed estimates.

  • A bid form, instructions to bidders, and general and supplementary conditions are core components of the construction contract documents.

  • Retainage is a percentage of each payment withheld by the owner until completion; it protects the owner against incomplete or defective work.

  • Lien rights allow contractors and suppliers to claim against the property for unpaid work; lien waivers release those rights upon payment.

  • Scheduling techniques include Gantt bar charts (good for communication) and network diagrams (good for showing dependencies and float).

  • A punch list records incomplete or defective items identified at substantial completion and must be resolved before final payment.

  • Risk allocation in contracts is managed through indemnification, insurance requirements, and bonding (performance and payment bonds).