Quick reference

Lean Principles and Core Concepts

  • Five core principles in sequence: specify value from the customer's perspective, identify the value stream, make value flow, let the customer pull, and pursue perfection.

  • Value is defined only by the customer's requirements for a specific product or service at a specific price and time; internal opinions of value are not value.

  • Three conditions classify any activity: value-adding, necessary non-value-adding (business-enabling waste), and pure non-value-adding waste. Only the first two may remain long term.

  • Lead time = processing time + waiting time + transport time + inspection time. Little's Law states throughput time = work in process / throughput rate.

  • Push systems release work to a schedule forecast; pull systems release work only on downstream consumption signaled by kanban, CONWIP, or a customer order.

  • Flow means producing one unit at a time with no batching between steps; continuous flow is preferred, and pull replaces flow only where flow is impossible.

  • Takt time = available production time / customer demand rate, expressed in time per unit. Cycle time above takt time means demand cannot be met without overtime or added capacity.

  • Perfection in Lean means reducing the gap between current and ideal states continuously, not reaching a fixed endpoint.

  • Lean applies to service and administrative work by the same logic: value is defined by the requester and waste is any step that does not move the request toward completion.

Quick reference

Value Stream Mapping and Process Analysis

  • A value stream map covers one product family and shows material flow, information flow, and the timeline; process boxes carry cycle time, changeover time, uptime, batch size, and available time.

  • Value-added ratio (process cycle efficiency) = value-added time / total lead time. Typical office and manufacturing streams sit in the low single digits to about 5 percent.

  • Rolled throughput yield = product of each step's first-pass yield across the stream; it exposes hidden rework that average yield masks.

  • Current-state map first, then a future-state map, then a plan with owners and dates. Mapping without a future state and an action plan does not change performance.

  • Takt time sets the pace line on the map; steps whose cycle time exceeds takt time are constraints and are candidates for kaizen bursts.

  • A process box represents one step with internal waiting removed; inventory triangles between boxes are the queues that dominate lead time.

  • A spaghetti diagram traces physical travel of people or documents; distance and crossings are the measure, and the improvement target is shortening or eliminating travel.

  • A swimlane or deployment flowchart separates handoffs by role, which exposes delays caused by approval loops and rework loops rather than by work content.

  • Capacity analysis compares each step's effective capacity (available time x uptime / cycle time) with demand to locate the bottleneck before improving anything else.

Quick reference

Waste Identification and Elimination

  • The eight wastes are overproduction, waiting, transportation, overprocessing, inventory, motion, defects, and unused human talent; overproduction is the worst because it creates the others.

  • Overproduction is measured as output above the next step's consumption rate or above takt time; it hides defects and inflates lead time.

  • Inventory waste is quantified as days of supply = on-hand units / daily demand; queues are inventory in the office.

  • Defects waste includes rework, scrap, inspection, and warranty; cost of poor quality includes appraisal and failure costs, internal and external.

  • Motion waste is measured by ergonomic risk and travel distance per cycle; transportation waste is measured by distance and number of moves per unit.

  • Waiting waste appears as operator idle time, queue time, or approval delay; it is the largest single contributor to lead time in most streams.

  • Overprocessing is work the customer would not pay for, such as redundant approvals, tighter tolerance than specified, or duplicate data entry.

  • Unused talent is addressed through standard work participation, suggestion systems with response targets, and cross-training matrices.

  • Waste audits use direct observation at the gemba with a tally sheet per waste type over a defined sample period; conclusions come from observed counts, not recollection.

Quick reference

Continuous Improvement Tools and Methods

  • PDCA: Plan sets target condition and method, Do runs the experiment, Check compares result against target, Act standardizes or adjusts. Without a target condition there is no improvement cycle.

  • 5S sequence: sort, set in order, shine, standardize, sustain. Sustain is the step that fails most often; audits with scores and owners support it.

  • Standard work specifies takt time, work sequence, and standard in-process stock. It is the baseline against which any improvement is measured.

  • SMED separates internal setup (machine stopped) from external setup (machine running); the target is converting internal to external and then reducing both.

  • Kanban rules: downstream withdraws, upstream produces only what is withdrawn, no item is moved without a kanban, and the number of kanban sets the WIP cap.

  • Jidoka means stop the line on an abnormality so defects are not passed on; andon is the signal, and the five whys is the countermeasure tool.

  • Poka-yoke is error prevention at the source: contact, fixed-value, or motion-step methods. It is preferred over detection and over training alone.

  • A3 problem solving structure: background, current condition with data, target condition, root cause analysis, countermeasures, plan, and follow-up. It fits on one page by design.

  • Kaizen events run five days typically: day one scope and baseline, day two analyze, days three and four implement and trial, day five standardize and report results.

Quick reference

Lean Deployment, Leadership, and Culture

  • Hoshin kanri cascades annual objectives into measurable targets and improvement priorities at each level, with catchball negotiation up and down the chain.

  • Leader standard work defines daily routines (gemba walks, tiered meetings, escalation checks) that sustain gains after a project ends.

  • Tiered daily management uses short stand-up meetings at each level with a defined escalation path and time limit for unresolved issues.

  • A value stream manager owns end-to-end flow and lead time for a product family, which conflicts with functional department ownership and must be made explicit.

  • Resistance to Lean typically comes from misaligned metrics, not attitude; changing local efficiency and utilization targets to flow and lead-time targets removes the incentive to build inventory.

  • Gemba means going to the place where work happens to observe the actual process; reports and dashboards are not a substitute.

  • Respect for people means engaging the people who do the work in designing the standard, and leaders asking questions rather than issuing countermeasures.

  • Deployment sequencing: pilot in a constrained area with visible flow, prove results with data, standardize, then spread by replication with local adaptation.

  • Training structure commonly follows a 70-20-10 pattern: most learning on the job in a real improvement, some from coaching, a minority from classroom instruction.

Quick reference

Lean Principles and Core Concepts

  • Five principles in order: value, value stream, flow, pull, perfection. Perfection is the pursuit, not a state to be reached.

  • Value is set by the customer's requirements at a specific price and time; internal preference does not define value.

  • Little's Law: throughput time = WIP / throughput rate. Cutting WIP at constant throughput shortens lead time proportionally.

  • Takt time = available time / customer demand, in time per unit. Cycle time above takt time means demand cannot be met.

  • Pull releases work only on downstream consumption; push releases work to a forecast.

  • Continuous flow is preferred over pull, and pull is preferred over batch scheduling where flow is impossible.

  • Activities are value-adding, necessary non-value-adding, or pure waste; only the third must be eliminated outright.

  • Lean applies to service work by the same logic: the requester defines value and delay is the dominant waste.

Quick reference

Value Stream Mapping and Process Analysis

  • A value stream map covers one product family and shows material flow, information flow, and a timeline bar of value-added versus waiting time.

  • Process boxes record cycle time, changeover time, uptime, batch size, available time, and operators; inventory triangles record quantity and days of supply.

  • Value-added ratio = value-added time / total lead time; typical streams land in the low single digits.

  • Rolled throughput yield = product of first-pass yields at every step; it exposes rework hidden by average yield.

  • Sequence is current state, future state, then an action plan with owners and dates; mapping without a future state changes nothing.

  • Steps with cycle time above takt time are constraints and receive kaizen bursts on the map.

  • Spaghetti diagrams measure travel distance and crossings of people or documents; the target is shortening or eliminating movement.

  • Effective capacity per step = available time x uptime / cycle time; compare with demand to locate the true bottleneck.

Quick reference

Waste Identification and Elimination

  • Eight wastes: overproduction, waiting, transportation, overprocessing, inventory, motion, defects, unused talent. Overproduction generates the rest.

  • Days of supply = on-hand inventory / daily demand; queues are inventory in office streams.

  • Waiting is usually the largest contributor to lead time; it appears as queue time, idle time, or approval delay.

  • Overprocessing is work the customer would not pay for: redundant approvals, duplicate entry, tolerance tighter than specified.

  • Defects waste includes rework, scrap, inspection, and warranty; cost of poor quality spans appraisal plus internal and external failure.

  • Motion is measured by travel distance and ergonomic risk per cycle; transportation by distance and number of moves per unit.

  • Unused talent is countered with standard work participation, suggestion systems with response targets, and cross-training matrices.

  • Waste audits use direct gemba observation with a tally sheet per waste type over a defined sample; counts, not recollection, drive conclusions.

Quick reference

Continuous Improvement Tools and Methods

  • PDCA requires a target condition; without one there is no experiment and no improvement cycle.

  • 5S order: sort, set in order, shine, standardize, sustain. Sustain fails most often and needs audits, scores, and owners.

  • Standard work defines takt time, work sequence, and standard in-process stock; it is the baseline for every improvement.

  • SMED converts internal setup (machine stopped) to external setup (machine running), then reduces both.

  • Kanban rules: downstream withdraws, upstream produces only what is withdrawn, nothing moves without a kanban, and kanban count caps WIP.

  • Jidoka stops the process on abnormality; andon signals it, and five whys drives the countermeasure.

  • Poka-yoke methods are contact, fixed-value, and motion-step; prevention at the source beats detection and beats training alone.

  • A3 structure: background, current condition with data, target, root cause, countermeasures, plan, follow-up; one page by design.

  • Kaizen events typically run five days: scope and baseline, analyze, implement and trial, then standardize and report results.

Quick reference

Lean Deployment, Leadership, and Culture

  • Hoshin kanri cascades annual objectives into measurable targets at each level through catchball negotiation up and down the chain.

  • Leader standard work defines daily routines such as gemba walks, tiered meetings, and escalation checks that sustain gains after projects end.

  • Tiered daily management uses short stand-ups at each level with a defined escalation path and a time limit for unresolved issues.

  • A value stream manager owns end-to-end flow and lead time for a product family, which conflicts with functional ownership and must be made explicit.

  • Misaligned metrics, especially local efficiency and utilization targets, drive inventory buildup; flow and lead-time targets remove that incentive.

  • Gemba means observing the actual process where work happens; reports and dashboards are not a substitute.

  • Respect for people means the people doing the work design the standard, and leaders ask questions instead of issuing countermeasures.

  • Deployment sequence: pilot in a constrained area, prove results with data, standardize, then replicate with local adaptation.

  • Training commonly follows 70-20-10: most learning on the job in a real improvement, some from coaching, a minority from classroom.

Quick reference

Lean Principles and Core Concepts

  • Five principles in order: value, value stream, flow, pull, perfection. Perfection is a pursuit, not a destination.

  • Value is defined by the customer's requirements at a specific price and time; internal preference does not define value.

  • Little's Law: throughput time = WIP / throughput rate. Reducing WIP at constant throughput shortens lead time proportionally.

  • Takt time = available time / customer demand, in time per unit. Cycle time above takt time means demand cannot be met.

  • Pull releases work only on downstream consumption; push releases work to a forecast.

  • Continuous flow is preferred over pull, and pull over batch scheduling where flow is impossible.

  • Activities are value-adding, necessary non-value-adding, or pure waste; only the third must be eliminated outright.

  • Lean applies to service work by the same logic: the requester defines value and delay is the dominant waste.

Quick reference

Value Stream Mapping and Process Analysis

  • A value stream map covers one product family and shows material flow, information flow, and a timeline bar of value-added versus waiting time.

  • Process boxes record cycle time, changeover time, uptime, batch size, available time, and operators; inventory triangles record quantity and days of supply.

  • Value-added ratio = value-added time / total lead time; typical streams land in the low single digits.

  • Rolled throughput yield = product of first-pass yields at every step; it exposes rework hidden by average yield.

  • Sequence is current state, future state, then an action plan with owners and dates; mapping without a future state changes nothing.

  • Steps with cycle time above takt time are constraints and receive kaizen bursts on the map.

  • Spaghetti diagrams measure travel distance and crossings of people or documents; the target is shortening or eliminating movement.

  • Effective capacity per step = available time x uptime / cycle time; compare with demand to locate the true bottleneck.

Quick reference

Waste Identification and Elimination

  • Eight wastes: overproduction, waiting, transportation, overprocessing, inventory, motion, defects, unused talent. Overproduction generates the rest.

  • Days of supply = on-hand inventory / daily demand; queues are inventory in office streams.

  • Waiting is usually the largest contributor to lead time; it appears as queue time, idle time, or approval delay.

  • Overprocessing is work the customer would not pay for: redundant approvals, duplicate entry, tolerance tighter than specified.

  • Defects waste includes rework, scrap, inspection, and warranty; cost of poor quality spans appraisal plus internal and external failure.

  • Motion is measured by travel distance and ergonomic risk per cycle; transportation by distance and number of moves per unit.

  • Unused talent is countered with standard work participation, suggestion systems with response targets, and cross-training matrices.

  • Waste audits use direct gemba observation with a tally sheet per waste type over a defined sample; counts, not recollection, drive conclusions.

Quick reference

Continuous Improvement Tools and Methods

  • PDCA requires a target condition; without one there is no experiment and no improvement cycle.

  • 5S order: sort, set in order, shine, standardize, sustain. Sustain fails most often and needs audits, scores, and owners.

  • Standard work defines takt time, work sequence, and standard in-process stock; it is the baseline for every improvement.

  • SMED converts internal setup (machine stopped) to external setup (machine running), then reduces both.

  • Kanban rules: downstream withdraws, upstream produces only what is withdrawn, nothing moves without a kanban, and kanban count caps WIP.

  • Jidoka stops the process on abnormality; andon signals it, and five whys drives the countermeasure.

  • Poka-yoke methods are contact, fixed-value, and motion-step; prevention at the source beats detection and beats training alone.

  • A3 structure: background, current condition with data, target, root cause, countermeasures, plan, follow-up; one page by design.

  • Kaizen events typically run five days: scope and baseline, analyze, implement and trial, then standardize and report results.

Quick reference

Lean Deployment, Leadership, and Culture

  • Hoshin kanri cascades annual objectives into measurable targets at each level through catchball negotiation up and down the chain.

  • Leader standard work defines daily routines such as gemba walks, tiered meetings, and escalation checks that sustain gains after projects end.

  • Tiered daily management uses short stand-ups at each level with a defined escalation path and a time limit for unresolved issues.

  • A value stream manager owns end-to-end flow and lead time for a product family, which conflicts with functional ownership and must be made explicit.

  • Misaligned metrics, especially local efficiency and utilization targets, drive inventory buildup; flow and lead-time targets remove that incentive.

  • Gemba means observing the actual process where work happens; reports and dashboards are not a substitute.

  • Respect for people means the people doing the work design the standard, and leaders ask questions instead of issuing countermeasures.

  • Deployment sequence: pilot in a constrained area, prove results with data, standardize, then replicate with local adaptation.

  • Training commonly follows 70-20-10: most learning on the job in a real improvement, some from coaching, a minority from classroom.

Quick reference

Lean Principles and Core Concepts

  • Five principles in order: value, value stream, flow, pull, perfection. Perfection is a pursuit, not a destination.

  • Value is defined by the customer's requirements at a specific price and time; internal preference does not define value.

  • Little's Law: throughput time = WIP / throughput rate. Reducing WIP at constant throughput shortens lead time proportionally.

  • Takt time = available time / customer demand, in time per unit. Cycle time above takt time means demand cannot be met.

  • Pull releases work only on downstream consumption; push releases work to a forecast.

  • Continuous flow is preferred over pull, and pull over batch scheduling where flow is impossible.

  • Activities are value-adding, necessary non-value-adding, or pure waste; only the third must be eliminated outright.

  • Lean applies to service work by the same logic: the requester defines value and delay is the dominant waste.

Quick reference

Value Stream Mapping and Process Analysis

  • A value stream map covers one product family and shows material flow, information flow, and a timeline bar of value-added versus waiting time.

  • Process boxes record cycle time, changeover time, uptime, batch size, available time, and operators; inventory triangles record quantity and days of supply.

  • Value-added ratio = value-added time / total lead time; typical streams land in the low single digits.

  • Rolled throughput yield = product of first-pass yields at every step; it exposes rework hidden by average yield.

  • Sequence is current state, future state, then an action plan with owners and dates; mapping without a future state changes nothing.

  • Steps with cycle time above takt time are constraints and receive kaizen bursts on the map.

  • Spaghetti diagrams measure travel distance and crossings of people or documents; the target is shortening or eliminating movement.

  • Effective capacity per step = available time x uptime / cycle time; compare with demand to locate the true bottleneck.

Quick reference

Waste Identification and Elimination

  • Eight wastes: overproduction, waiting, transportation, overprocessing, inventory, motion, defects, unused talent. Overproduction generates the rest.

  • Days of supply = on-hand inventory / daily demand; queues are inventory in office streams.

  • Waiting is usually the largest contributor to lead time; it appears as queue time, idle time, or approval delay.

  • Overprocessing is work the customer would not pay for: redundant approvals, duplicate entry, tolerance tighter than specified.

  • Defects waste includes rework, scrap, inspection, and warranty; cost of poor quality spans appraisal plus internal and external failure.

  • Motion is measured by travel distance and ergonomic risk per cycle; transportation by distance and number of moves per unit.

  • Unused talent is countered with standard work participation, suggestion systems with response targets, and cross-training matrices.

  • Waste audits use direct gemba observation with a tally sheet per waste type over a defined sample; counts, not recollection, drive conclusions.

Quick reference

Continuous Improvement Tools and Methods

  • PDCA requires a target condition; without one there is no experiment and no improvement cycle.

  • 5S order: sort, set in order, shine, standardize, sustain. Sustain fails most often and needs audits, scores, and owners.

  • Standard work defines takt time, work sequence, and standard in-process stock; it is the baseline for every improvement.

  • SMED converts internal setup (machine stopped) to external setup (machine running), then reduces both.

  • Kanban rules: downstream withdraws, upstream produces only what is withdrawn, nothing moves without a kanban, and kanban count caps WIP.

  • Jidoka stops the process on abnormality; andon signals it, and five whys drives the countermeasure.

  • Poka-yoke methods are contact, fixed-value, and motion-step; prevention at the source beats detection and beats training alone.

  • A3 structure: background, current condition with data, target, root cause, countermeasures, plan, follow-up; one page by design.

  • Kaizen events typically run five days: scope and baseline, analyze, implement and trial, then standardize and report results.

Quick reference

Lean Deployment, Leadership, and Culture

  • Hoshin kanri cascades annual objectives into measurable targets at each level through catchball negotiation up and down the chain.

  • Leader standard work defines daily routines such as gemba walks, tiered meetings, and escalation checks that sustain gains after projects end.

  • Tiered daily management uses short stand-ups at each level with a defined escalation path and a time limit for unresolved issues.

  • A value stream manager owns end-to-end flow and lead time for a product family, which conflicts with functional ownership and must be made explicit.

  • Misaligned metrics, especially local efficiency and utilization targets, drive inventory buildup; flow and lead-time targets remove that incentive.

  • Gemba means observing the actual process where work happens; reports and dashboards are not a substitute.

  • Respect for people means the people doing the work design the standard, and leaders ask questions instead of issuing countermeasures.

  • Deployment sequence: pilot in a constrained area, prove results with data, standardize, then replicate with local adaptation.

  • Training commonly follows 70-20-10: most learning on the job in a real improvement, some from coaching, a minority from classroom.