LEED AP BD+C flashcards
LEED AP BD+C · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Integrative Process credit
- In LEED v4 BD+C, a one-point credit requiring energy-related and water-related systems analysis before the end of schematic design; LEED v4.1 elevates this requirement to a prerequisite.
- Simple box energy model
- A massing-level energy model built during pre-design to compare at least two energy options against a baseline, informing orientation, envelope, and system selection before design hardens.
- Water budget
- An estimate of indoor, outdoor, and process water demand paired with available supply sources, prepared during the discovery phase to reveal synergies such as rainwater harvesting for irrigation.
- Access to Quality Transit
- Credit requiring a main entrance within 1/4-mile walking distance of bus or BRT stops, or 1/2-mile of rail or ferry stations, served by a minimum number of weekday trips.
- Diverse uses
- Seven or more distinct service or retail uses within 1/2-mile walking distance of the project entrance, counted toward the Surrounding Density and Diverse Uses credit.
- High Priority Site
- Credit awarded for development on a brownfield, in a distressed or low-income community, or on an infill site adjacent to existing development, each with documented eligibility.
- Bicycle Facilities credit
- Requires short-term bicycle storage for 2.5% of peak visitors, long-term storage for 5% of regular occupants, and shower and changing facilities within a short walk of the entrance.
- Construction Activity Pollution Prevention
- The Sustainable Sites prerequisite requiring an erosion and sedimentation control plan that conforms to the EPA Construction General Permit or stricter local requirements and is implemented throughout construction.
- Site assessment
- Credit requiring evaluation of topography, hydrology, soils, vegetation, climate, human health effects, and adjacent properties before design, documenting conditions that inform the project's design response.
- Heat island reduction
- Strategy combining shaded or high-solar-reflectance hardscape with high-SRI or vegetated roofing to lower ambient temperature, quantified through separate nonroof and roof compliance measures.
- Rainwater management
- Credit requiring the project to replicate natural site hydrology by retaining on site the runoff from the 95th percentile rainfall event, or the 80th percentile in combined sewer areas.
- Indoor Water Use Reduction
- Prerequisite requiring a 20% reduction below the EPAct 1992 fixture baseline; the associated credit awards additional points for reductions up to 50% through efficient fixtures and fittings.
- Building-Level Water Metering
- Prerequisite requiring a permanent meter that measures total potable water use for the building and grounds, with consumption data tracked and shared for at least one year.
- Cooling tower water use
- Credit limiting potable water consumed by cooling towers by capping cycles of concentration, determined from an analysis of makeup water quality and treatment.
- Fundamental Commissioning and Verification
- Prerequisite requiring an independent commissioning authority to review owner requirements and basis of design, develop the commissioning plan, verify installation and performance, and deliver training and a systems manual.
- Minimum Energy Performance
- Prerequisite requiring whole-building energy simulation demonstrating improvement over the ASHRAE 90.1-2010 baseline, or prescriptive compliance using an ASHRAE advanced energy design guide.
- Optimize Energy Performance
- Credit worth up to 18 points in LEED v4 BD+C, awarded on a sliding scale that begins at 6% improvement over the ASHRAE 90.1 baseline and reaches 18 points at 50%.
- Advanced energy metering
- Credit requiring permanent meters that record electricity, gas, and water at the end-use level, collecting data at one-hour intervals or less and reporting it monthly.
- Fundamental Refrigerant Management
- Prerequisite prohibiting CFC-based refrigerants in new heating, ventilating, air-conditioning, and refrigeration systems, with a phase-out plan required for existing CFC equipment.
- Storage and Collection of Recyclables
- Prerequisite requiring a dedicated, accessible area serving the whole building that collects paper, corrugated cardboard, glass, plastics, and metals throughout the building's occupancy.
- Construction and Demolition Waste Management
- Credit rewarding diversion of nonhazardous construction and demolition waste from landfill; 50% diversion earns one point and 75% earns two, with waste-to-energy excluded.
- Environmental Product Declaration
- A third-party verified report of a product's life-cycle environmental impacts; the disclosure credit requires 20 permanently installed products from at least 5 manufacturers.
- Whole-building life-cycle assessment
- Credit option requiring a cradle-to-grave assessment showing at least 10% reduction in three of six impact categories compared with a functionally equivalent baseline building.
- Minimum Indoor Air Quality Performance
- Prerequisite requiring compliance with ASHRAE 62.1-2010 ventilation rates and outdoor air intake quality assessment, or a demonstrated alternative, for all occupied spaces.
- Environmental Tobacco Smoke Control
- Prerequisite prohibiting smoking inside the building and within 25 feet of entries, operable windows, and outdoor air intakes, with limited residential exceptions for designated outdoor areas.
- Flush-out
- Compliance path for the indoor air quality assessment credit requiring delivery of 14,000 cubic feet of outdoor air per square foot of floor area after construction and before occupancy.
- Daylight credit
- Credit requiring spatial daylight autonomy of 300 lux for 50% of occupied hours across 55% of floor area, while annual sunlight exposure stays at or below 10%.
- Innovation credit
- Credit worth up to six points, awarded for measurable environmental performance beyond the rating system, exemplary performance, approved pilot credits, or a LEED Accredited Professional on the team.
- Pilot credit
- A credit tested through the LEED pilot credit library; when successfully achieved, it can be counted toward the project's Innovation credit point total.
- Regional Priority credit
- One of six bonus credits designated by project zip code to address local environmental priorities; it is earned only if the underlying credit is achieved, up to four points.
- USGBC regional councils
- Groups that identify regionally significant credits for each zip code, weighting priorities such as water conservation in arid regions or air quality in nonattainment areas.
- Community outreach
- Early public participation that informs neighbors and stakeholders about a project's site, traffic, and construction impacts, shaping design decisions and reducing conflicts during construction and operation.